Resurfacing Projects for Complete Streets Potomac Avenue (S Crystal Dr to County Line) What we heard from you Goals & Guidance Project Guidance: Complete Streets Policy Identified as primary bicycling corridor in the Master


slide-1
SLIDE 1

Potomac Ave consists of four travel lanes (two in each direction separated by a median), standard bike lanes, and southbound curbside parking lane.

  • Speed Limit: 25 mph

85th percentile speed: 27 mph

  • Traffic: ~5000 vehicles per day
  • 11 crashes since 2016: 45% angle crashes
  • Two bicycle crashes since 2015

Resurfacing Projects for Complete Streets

More information: arlingtonva.us and search “Resurfacing for Complete Streets”

Potomac Avenue (S Crystal Dr to County Line)

Goals & Guidance What we know about existing conditions What we heard from you Project Guidance:

  • Complete Streets Policy
  • Identified as primary bicycling corridor in the Master Transportation

Plan Project Goals:

  • Improve bike safety along Potomac Avenue and improve connectivity

between Crystal Drive, Four Mile Run Trail, and Potomac Yard Trail

South North

Desire for an improved corridor connection between Potomac Yard and Crystal City for people walking and biking Desire for improved walking and biking tie-ins from the bike lanes at Crystal Drive and the trail connections just south of Glebe Rd.* Reports of issues with vehicles turning into transit lanes* Reports of issues with vehicles blocking existing bike lane Desire for a pedestrian connection (currently, no sidewalk exists) *Out of scope for the resurfacing program, but helpful feedback for future consideration

slide-2
SLIDE 2

Potomac Avenue between Crystal Drive and the Alexandria County Line (just after South Glebe Road).

Resurfacing Projects for Complete Streets

More information: arlingtonva.us and search “Resurfacing for Complete Streets”

Location Concept Plan Summary

  • Upgraded bike lane in both directions (protected and buffered)
  • Interim pedestrian treatment between 29th St S and 33rd St S
  • Adds wider parking near hotel to accommodate shuttle vehicles
  • Formalizes parking and provides 81 parking spaces (47 existing)

Southbound buffered bike lane Wide parking lanes Northbound protected bike lane

Concept Plan: Potomac Avenue (S Crystal Dr to County Line)

Temporary on- street pedestrian zone

Typical Cross Section (Looking North)

slide-3
SLIDE 3

Potomac Avenue between Crystal Drive and the Alexandria County Line (just after South Glebe Road).

Resurfacing Projects for Complete Streets

More information: arlingtonva.us and search “Resurfacing for Complete Streets”

Location Concept Plan Summary Cross Section with Temporary Sidewalk (Looking North)

Wide parking lanes Northbound protected bike lane

Concept Plan: Potomac Avenue (S Crystal Dr to County Line)

Temporary on- street pedestrian zone Southbound buffered bike lane

  • Upgraded bike lane in both directions (protected and buffered)
  • Interim pedestrian treatment between 29th St S and 33rd St S
  • Adds wider parking near hotel to accommodate shuttle vehicles
  • Formalizes parking and provides 81 parking spaces (47 existing)