HIGH SYSTEM RESERVOIR
AUGUST 2020
RESERVOIR AUGUST 2020 PROJECT OBJECTIVES A NEW RESERVOIR IS NEEDED - - PowerPoint PPT Presentation
HIGH SYSTEM RESERVOIR AUGUST 2020 PROJECT OBJECTIVES A NEW RESERVOIR IS NEEDED IN THE HIGH SYSTEM PRESSURE ZONE: TO INCREASE SYSTEM RELIABILITY FIRE FLOW & PEAK DEMAND SUPPLY DURING THE SUMMER TO MEET DEPARTMENT OF HEALTH
AUGUST 2020
29th Ave 33rd Ave Ray Street Manito Blvd 17th Ave Freya Street Bernard Street
DOWNTOWN LOWER S. HILL MID S. HILL (HIGH SYSTEM) UPPER S. HILL
33rd & Lamonte 125 feet tall near Sacajawea Garden Park at 37th Avenue near Stone Street 75 feet tall
Low Pressure Zone
Top System High System Intermediate Glennaire Southview Pumping Wells Downtown Lower South Hill Mid South Hill Upper South Hill
Lower Browne’s Mtn
Upper Browne’s Mtn
100’ below tank = about 43 psi Homes and businesses must be between approx. 100’ and 200’ below tank water level 200’ below tank = about 86 psi
✓ Near center of pressure zone ✓ Available parcel ✓ Close to pipes ✓ Right elevation
Hamblen Park 31st & Napa
320’ CONSTRUCTION AREA NEEDED: APPROX 225’ X 225’ (ROUGHLY FLAT) 37TH AVE.
29TH AVE. SAFEWAY SAFEWAY TOUCHMARK RETIREMENT HOME POTENTIAL RESERVOIR SITE
140’ CONSTRUCTION AREA NEEDED: APPROX 225’ X 225’ (ROUGHLY FLAT) TOUCHMARK CITY OWNED LOT 170’
140’ CONSTRUCTION AREA NEEDED: APPROX 225’ X 225’ (ROUGHLY FLAT) HAMBLEN ELEMENTARY 37TH AVE. 625’ CRESTLINE ST. NAPA ST. 625’
140’ CONSTRUCTION AREA NEEDED: APPROX 225’ X 225’ (ROUGHLY FLAT) HAMBLEN ELEMENTARY 37TH AVE. 625’ CRESTLINE ST. NAPA ST. 200’ 200’