Regulatory role in the European Network Codes Philip Newsome CER - - PowerPoint PPT Presentation

regulatory role in the
SMART_READER_LITE
LIVE PREVIEW

Regulatory role in the European Network Codes Philip Newsome CER - - PowerPoint PPT Presentation

Regulatory role in the European Network Codes Philip Newsome CER TITRE Framework Guidelines & Network Codes 24 October 2012 The Internal Market ACERs Role . ACER is responsible for delivering the Internal Market. CER and UR input .


slide-1
SLIDE 1

TITRE

Regulatory role in the European Network Codes

24 October 2012

Philip Newsome CER Framework Guidelines & Network Codes

slide-2
SLIDE 2

. ACER is responsible for delivering the Internal Market. CER and UR input

into ACER’s work programme and review of internal market rules . Under Third Package ACER has key role in:

»

producing Framework Guidelines in relation to each Network Code

»

reviewing ENTSO-E Network Codes to ensure they are in line with the Framework Guidelines

. ACER also have important role in monitoring the Internal Market and

progress to reaching 2014

. 2 year derogation from CACM for island of Ireland overseen by ACER

The Internal Market ACER’s Role

slide-3
SLIDE 3

SEM RAs very involved in ACER and Framework Guidelines

»

Attending meetings and input into drafting groups and ACER BoR decisions

»

We are representing interests of SEM consumers

»

Also UR involvement in UK Stakeholder Groups and Ofgem

»

Liaison with DCENR and EirGrid as appropriate

»

Through our involvement we have had successes:

  • 2 year derogation for SEM from FG CACM
  • central dispatch wording in Balancing FG

Framework Guidelines – SEM

slide-4
SLIDE 4

To date, ACER have adopted Framework Guidelines on:

» Grid Connection (20/07/11) » Capacity Allocation and Congestion Management (29/07/11) » System Operation (02/12/11) » Electricity Balancing (20/09/12)

Framework Guidelines So Far

slide-5
SLIDE 5

. ACER are currently reviewing the following Network Codes:

»

CACM Network Code ( Decision by end 2012)

. ACER have called for improvements to the following Network

Codes:

»

Requirements for Generators Network Code(13/10/12)

. In 2013, we expect to review:

»

Forward Network Code, Balancing Network Code, Demand Connection Network Code and 3 SO Network Codes

. Also key role for Member States in Network Codes at Comitology

Review of Network Codes

slide-6
SLIDE 6

. In 2013 ACER will also be focussing on:

»

The regional implementation of the Target Model including stakeholder engagement

»

Rules for the cross border forward market and FTRs/PTRs (recent consultation)

»

The implications of CPM on the internal market

»

Redispatch and countertrading

Review of Network Codes

slide-7
SLIDE 7

. ACER Stakeholder Engagement

»

ACER consultations on all Framework Guidelines

»

AESAG Forum – ACER, EC, ENTSO, Eurelectric, EFET.

. SEM Stakeholder Group on European Internal Market

»

SEM Market Integration Project - to implement Target Model and meet Network Code requirements – shortly to move to next phase

»

UK DECC/Ofgem European Group and National Grid Joint Electricity Steering Group consider Network Code issues for GB

»

RAs intend to set up Stakeholder Forum on the European Internal Market in conjunction with Departments and EirGrid

Stakeholder Engagement

slide-8
SLIDE 8

Thank you for your attention! www.acer.europa.eu