regulatory regulatory infrastructure infrastructure
play

Regulatory Regulatory Infrastructure Infrastructure Two National - PDF document

8/25/2006 INTERNAL REGULATORY CONTROL OF INTERNAL REGULATORY CONTROL OF PNRI FACILITIES AND LABORATORIES PNRI FACILITIES AND LABORATORIES Philippine Nuclear Research Institute Philippine Nuclear Research Institute Department of Science and


  1. 8/25/2006 INTERNAL REGULATORY CONTROL OF INTERNAL REGULATORY CONTROL OF PNRI FACILITIES AND LABORATORIES PNRI FACILITIES AND LABORATORIES Philippine Nuclear Research Institute Philippine Nuclear Research Institute Department of Science and Technology Department of Science and Technology Philippine Nuclear Research Institute Regulatory Regulatory Infrastructure Infrastructure Two National Regulatory Authorities in the Two National Regulatory Authorities in the Philippines: Philippines: � Philippine Nuclear Research Institute (PNRI), Department of Science and Technology (DOST) is the national authority responsible for the regulation, licensing and safeguards of radioactive materials and atomic energy facilities. � Bureau of Health Devices and Technology (BHDT), Department of Health (DOH) is the national agency in charge of radiation protection and safety of the ionizing and non-ionizing radiation emitted from electrical/electronic devices. 1

  2. 8/25/2006 Present PNRI Organizational Structure Present PNRI Organizational Structure Director Deputy Director Atomic Nuclear Nuclear Finance and Research Services & Training Regulations, Licensing Administrative Division Division & Safeguards Division Division Agricultural Research Reactor Operations Standards Development Budget Unit Biomedical Research Engineering Services Licensing, Review and Accounting Unit Health Physics Research Irradiation Services Evaluation Cash Unit Applied Physics Research Nuclear Training Inspection and Property and Chemistry Research Computer Services Enforcement Procurement Unit Analytical Measurements Radiation Protection Safeguards Personnel Unit Research Services Radiological Impact Records and Isotope Techniques Information Services Assessment Communication Unit Research Library Services Medical Unit Nuclear Materials Plant Services Unit Research Motorpool Unit The Philippine Nuclear Research The Philippine Nuclear Research Institute: As The Regulatory Body Institute: As The Regulatory Body � Headed by a Director and a Deputy Director Headed by a Director and a Deputy Director � � Consists of 4 divisions, namely: Consists of 4 divisions, namely: � � Atomic Research Division � Nuclear Services and Training Division � Nuclear Regulations, Licensing and Safeguards Division � Finance and Administration Division 2

  3. 8/25/2006 Internal Regulatory Control Internal Regulatory Control Program of PNRI Program of PNRI Facilities/Laboratories Facilities/Laboratories � was established thru PNRI Office Order 002 was established thru PNRI Office Order 002 � Series of 2004 Series of 2004 � in accordance with the PNRI Policy in accordance with the PNRI Policy � Instruction No.02 Series of 2001 entitled Instruction No.02 Series of 2001 entitled Radiological Health and Safety Policy Radiological Health and Safety Policy Coverage of Implementation of the Coverage of Implementation of the Internal Regulatory Program Internal Regulatory Program � Philippine Research Reactor (PRR Philippine Research Reactor (PRR- -1) 1) � � Co Co- -60 Multi 60 Multi- -Purpose Irradiation Facility Purpose Irradiation Facility � � Radioisotope Dispensing Laboratory Radioisotope Dispensing Laboratory � � Radioactive Wastes Management and Interim Radioactive Wastes Management and Interim � Storage Facility Storage Facility � Secondary Standard Secondary Standard Dosimetry Dosimetry Laboratory and Laboratory and � � other PNRI research laboratories where other PNRI research laboratories where � radioactive materials are used and handled radioactive materials are used and handled 3

  4. 8/25/2006 Nuclear Regulations, Licensing, & Nuclear Regulations, Licensing, & Safeguards Division (NRLSD) Safeguards Division (NRLSD) � was tasked to take the responsibilities to was tasked to take the responsibilities to � implement the Program implement the Program � Consists of the following Units: Consists of the following Units: � � Standards Development Unit � Licensing, Review, and Evaluation Unit � Inspection and Enforcement Unit � Safeguards Unit � Radiological Impact Assessment Unit NRLSD Task Force NRLSD Task Force was created to review and evaluate to review and evaluate � was created � applications for authorization of PNRI applications for authorization of PNRI facilities/Laboratories was issued. facilities/Laboratories was issued. took charge of the development of � took charge of the development of � application form for authorization of PNRI application form for authorization of PNRI Facilities/Laboratories Facilities/Laboratories 4

  5. 8/25/2006 Requirements for Requirements for Authorization of PRR- -1 1 Authorization of PRR Radiation Control Programme � Radiation Control Programme � Safety Analysis Report (SAR) � Safety Analysis Report (SAR) � � Decommissioning Plan Decommissioning Plan � Radiation Control Radiation Control Programme Programme To ensure that PRR To ensure that PRR- -1 1’ ’s radiation s radiation protection and monitoring system protection and monitoring system remains in operable condition during remains in operable condition during the period of extended shutdown and the period of extended shutdown and eventual decommissioning. eventual decommissioning. 5

  6. 8/25/2006 Safety Analysis Report (SAR) Safety Analysis Report (SAR) The purpose is to justify the design which The purpose is to justify the design which is to be the basis for the safe extended is to be the basis for the safe extended shutdown and decommissioning of the shutdown and decommissioning of the research reactor. research reactor. The SAR should provide the The SAR should provide the following: following: General description of the facility General description of the facility � � Safety objectives Safety objectives � � Site characteristics Site characteristics � � Buildings and structures Buildings and structures � � Reactor Description and Design Reactor Description and Design � � Reactor coolant systems and connected Reactor coolant systems and connected � � systems systems Engineered safety features Engineered safety features � � Instrumentation and control Instrumentation and control � � Electric power Electric power � � Auxiliary systems Auxiliary systems � � Radiological safety procedure Radiological safety procedure � � Conduct of activities during extended Conduct of activities during extended � � shutdown shutdown Administrative and surveillance requirements Administrative and surveillance requirements � � Quality assurance Quality assurance � � 6

  7. 8/25/2006 Decommissioning Plan Decommissioning Plan a description of the experience, resources, � responsibilities and structure of the decommissioning organization, including the technical qualification/skills of the staff; an assessment of the availability of special � services, engineering and decommissioning techniques required, including any decontamination, dismantling and cutting technology as well as remotely operated equipment needed to complete decommissioning safely; an assessment of the amount, type and location of � residual radioactive and hazardous non-radioactive materials in the nuclear reactor installation, including calculational methods and measurements to be used to determine the inventory of each; a description of the waste management practices � Requirements for Waste Requirements for Waste Management Practices Management Practices � identification and characterization of sources, types and volumes of waste; � criteria for segregating materials; � proposed program for waste processing, storage, or transport to radioactive waste management facility of radioactive waste packages or disused sources; � the potential to reuse and recycle materials; � anticipated discharges of radioactive and hazardous non-radioactive materials to the environment 7

  8. 8/25/2006 8

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.