Reclaiming the Hudson River Objective: Further flood plain testing - - PowerPoint PPT Presentation

Reclaiming the Hudson River Objective: Further flood plain testing needs to be done in order to ensure sustainable community and economic development, heritage/cultural tourism and the safety and well being of our residents. Reclaiming the


slide-1
SLIDE 1

Reclaiming the Hudson River

Objective: Further flood plain testing needs to be done in order to ensure sustainable community and economic development, heritage/cultural tourism and the safety and well being of our residents.

slide-2
SLIDE 2

Reclaiming the Hudson River

Key Points

  • Schuylerville & Victory

Health/Safety Issues

  • Navigational Dredging
  • Plans for future projects
slide-3
SLIDE 3

Schuylerville & Victory Health/Safety Issues

  • Potential Breach of the

Old Canal

– Contamination of Water Supply/Sewage Treatment Plant. – Impact of local recreational areas. – Closed for Business

slide-4
SLIDE 4

Schuylerville & Victory Health/Safety Issues

Storm Water/Well Water $12 Million Storm Water System Outflow at the Old Champlain Canal Flooding of the Old Canal

Overflow of PCB contaminated water

Sewage Treatment Plant/ Community Drinking Water

slide-5
SLIDE 5

Action

Remove the PCB sediment in the Old Canal before the dewatering facility is closed.

PCB sediment clogging the Old Canal

slide-6
SLIDE 6
  • Navigational

dredging will support the economic vitality of our communities.

Navigational Dredging

slide-7
SLIDE 7

Navigational Dredging

  • NYS Constitution has a

mandatory 12’ depth for barge canal, which is not being met.

– Greenwich Barge Terminal

  • NYS cannot dredge due to

PCBs

  • Cannot handle without

Dewatering Plant.

  • Commuter traffic helps

support waterfront communities.

slide-8
SLIDE 8

Action

Dredge the canal to meet the mandatory 12’ depth requirement while the dewatering facility is in place.

slide-9
SLIDE 9

Plans for Future Projects

Future waterfront development projects are dependent on removing PCB sediment in the flood plains.

slide-10
SLIDE 10

Plans for Future Projects

  • Potential loss of public/private

investment.

– Hudson Crossing Park

  • Kayak launch closed due to PCB

contamination.

  • More than $5 Million of public dollar

and local investment.

– Cultural/Heritage Tourism

  • Historic Hudson & Hoosic Rivers

Partnership, Erie Canalway NHC, Champlain Valley NHP, Hudson River Valley NHC, Saratoga NHP, Lakes to Locks Passage/ National Geographic, Saratoga/Capital Region.

  • Future Project Developments

– PCB sediment will escalate the cost prohibitively, or eliminate the potential for future waterfront projects.

  • Documentation of potential future

projects to be supplied.

– Partnership working on this for past year.

slide-11
SLIDE 11

Action

Identify all PCBs in the flood plain in extended areas and complete removal so that the communities can proceed with project development.

New warning signs at the kayak launch in Hudson Crossing Park.

slide-12
SLIDE 12

Conclusion

We urge that the EPA, GE and all the involved state and federal agencies undertake a serious evaluation of the flood plains and back water areas including the Old Champlain Canal in the Villages of Schuylerville and Victory and assure for the citizens and business of the "Upper River" that PCB's and Navigational Dredging are completed before the Dewatering Facility is shut down.