RCAF Force Development Presented by Colonel Steve Chouinard Director of Air Requirements 3 April 2017 THE AIR FORCE DEVELOPMENT TEAM Commander RCAF LGen Hood CFAWC Deputy Comd RCAF Col Truss MGen Harris D Air SP DG Air FD DG Space DG


slide-1
SLIDE 1

RCAF Force Development

Presented by Colonel Steve Chouinard Director of Air Requirements

3 April 2017

slide-2
SLIDE 2

THE AIR FORCE DEVELOPMENT TEAM

Commander RCAF LGen Hood Deputy Comd RCAF MGen Harris DG Air FD BGen lalumiÈre DAR Col Chouinard DAST Col alexander DADD Col Thibert D Air Prog Lcol Whalen

  • Aircraft (including UAS)
  • Electronic Warfare Equipment
  • Support Equipment
  • Vehicles
  • Uniforms & Accoutrements
  • Modeling & Simulation
  • Future Air Crew Training
  • Training contract management
  • ie CATS / NFTC / CFTS
  • International Pilot Training
  • Radar Systems
  • IM/IT Systems
  • C2 and C4ISR
  • Cyber / NORAD / NWS
  • RCAF Minor Capital Programme Oversight
  • Minor Requirements Program
  • Governance

DG Space BGen Frawley D Air SP Col stoltz CFAWC Col Truss DG FCO MGen pelletier S&T + DRDC + CORA MHP

slide-3
SLIDE 3

2

RCAF Capability Development Framework

slide-4
SLIDE 4

CF-18 Project Interim Fighter Capability Project Future Fighter Capability Project

Definition Implementation Delivery

Implementation

Delivery OA Definition Implementation Delivery

Definition

Fighter Capability Plan

OA

slide-5
SLIDE 5

4

MHP – CH148 Cyclone

Description: Acquire 28 CH148 Cyclone helicopters (Sikorsky) to provide a shipborne maritime helicopter capable of conducting Anti- Submarine Warfare (ASW), Intelligence, Surveillance and Reconnaissance (ISR), Search and Rescue (SAR) and utility

  • missions. Project includes ship modifications, training, facility

upgrades and In-Service Support.

Project Milestones Contract Award Nov 2004 Capability Delivery in Blocks Block I – Initial Surveillance, ASW and Utility (delivery in progress) Block II – Fully Operationally Capable Initial Operational Capability 2018 In-Service Support end 2038 (est) Current Stage: Implementation

slide-6
SLIDE 6

CP140 Aurora AIMP Block III & IV / ASLEP Projects

5

Project Milestones

ASLEP and AIMP Block III – Initial Operational Capability in 2014 with Full Operational Capability by 2019 AIMP Block IV – Initial Operational capability in 2019 with Full Capability in early/mid-2020s Description: To structurally life-extend and operationally upgrade 14 CP140 Aurora aircraft in order to support operations to

  • 2030. Blocks I and II upgraded legacy and communications

and navigation systems. Block III and ALSEP are underway and will upgrade all mission and sensor systems concurrent with structural life extension. Block IV will add a wideband SATCOM capability as well as Link 16 and a self- protection suite.

Current Stage: Implementation

slide-7
SLIDE 7

CH146 Griffon Limited Life Extension (GLLE)

Description: To extend CH146 operating life to 2030+ through the replacement of obsolete avionics, instrumentation and displays with an integrated digital systems architecture. Project Milestones Contract Award 2020 IOC 2024 FOC 2026 Current Stage: Option Analysis

slide-8
SLIDE 8

Cormorant Mid-Life Upgrade (CMLU)

Description: To extend the operational life of the CH149 to at least 2040 and provide capability improvements to enhance its overall mission effectiveness.

7

Project Milestones Definition Approval 2020 Contract Award 2023 Current Stage: Option Analysis

slide-9
SLIDE 9

CC144 Challenger Consolidation Project (CCP)

Description: To extend Administrative Flight Service capability for VVIPs and continue Utility Flight Services (such as Aeromedical Evacuation and Disaster Assistance Response Team advance party) as a cost effective alternative to other RCAF fleets and commercial air. Project Milestones Definition Approval 2019 Contract Award 2021 Current Stage: Option Analysis

slide-10
SLIDE 10

Joint Unmanned Surveillance & Target Acquisition System (JUSTAS)

Description: To provide an all-weather, persistent, intelligence, surveillance, reconnaissance and payload delivery capability in support of CAF domestic and expeditionary operations. Project Milestones (Ranges)

Contract Award 2020-2022 IOC 2025-2028 (1 line of tasking available for operations) FOC 2026-2029 (3 lines of tasking, aircraft, infrastructure & personnel in-situ)

Current Stage: Option Analysis

slide-11
SLIDE 11

Snow and Ice Control Capability Recapitalization (SNICCR)

Description: This project will provide high speed snow removal and de-icing equipment designed for airfield operation, to replace an aging fleet of snow and ice control equipment. Current Stage: Option Analysis Project Milestones Definition Jun 17 Implementation May 18 IOC Nov 20

slide-12
SLIDE 12

Armament Loader Replacement (ALR)

Description: This project will provide a safe and reliable armament loader fleet capable of supporting CF188 fighter aircraft operations. Current Stage: Definition Project Milestones Definition / Implementation Jun 17 IOC Aug 18

slide-13
SLIDE 13

CMA – Canadian Multi-Mission Aircraft

12

Project Milestones Initial Operational Capability in early 2030s Full Operational Capability by mid 2030s Estimated Life Expectancy 2060 Intent is to pursue opportunities for innovation with industry with a view to building on the strengths of and lessons learned from AIMP

Description: To equip the CF with a long-range manned Maritime Patrol, Anti-Submarine Warfare (ASW) capable, Command and Control, Communications and Computers (C4) and Intelligence, Surveillance and Reconnaissance (ISR) aircraft to complement existing and future ASW and C4ISR capabilities such as JUSTAS, CH148 Cyclone and space- based solutions.

Current Stage: Identification

slide-14
SLIDE 14

13

Strategic Tanker Transport Capability (STTC)

Project Milestones Definition 2020 Contract Award 2022

Description: This project will replace the existing fleet capability, including strategic airlift, air-to-air refuelling and VIP transport after a potential life extension. The platform will provide air-to-air refuelling for both domestic and expeditionary coalition operations, while complementing the strategic airlift capabilities of the CC-177 fleet.

Current Stage: Identification

slide-15
SLIDE 15

14

Future Aircrew Training (FAcT)

Current Situation: Options Analysis

Description: Address the modernization/optimization of the ab initio Pilot, ACSO and AES Op training to Wings Standard. FAcT is to implement a relevant, flexible, effective and affordable solution which modernizes/optimizes the training system to meet current and future CAF requirements. The solution must continue and improve upon the training currently provided by the expiring NFTC and CFTS services contracts as well as the training currently conducted at 402 Squadron. Project Milestones Contract Award: 2021 Initial Operating Capability: 2023 Full Operating Capability: 2027

slide-16
SLIDE 16

15

Tactical Integrated Command, Control and Communications (TIC3) Air

Current Situation: Options Analysis Description: (1) Replace and modernize RCAF Air Traffic Management and Air Defence radio networks, (2) establish domestic Link-16 and Streaming Video Ground Entry Sites and standardize deployable Tactical Data Link and Streaming Video capability, and (3) provide a Link-16 capability to the CC150 Polaris Tankers.

Project Milestones Contract Award 2018 IOC 2021 FOC 2024

slide-17
SLIDE 17

16

CAF PED/DGS-CAN

Description:

CAF PED concept to enable the effective use of centralized PED resources in support of, and responsive to, any domestic and/or deployed operations Interoperability with United States, United Kingdom and Australia (US, UK, AUS, CAN)

Current situation: Research phase Notional Milestones

DGS-Canada Trial - Oct-May 2018 DGS-Canada IOC - Spring 2018 +

slide-18
SLIDE 18

Defence Acquisition Guide

17

http://www.forces.gc.ca/en/business-defence- acquisition-guide-2016/aerospace-systems.page

slide-19
SLIDE 19

Minor Capital Projects

Buy and Sell

Buyandsell.gc.ca

slide-20
SLIDE 20

Questions?

19