QATAR 2012 ARCHITECTURE MUSEUM QATAR Wave movement Architecture - - PowerPoint PPT Presentation

qatar 2012
SMART_READER_LITE
LIVE PREVIEW

QATAR 2012 ARCHITECTURE MUSEUM QATAR Wave movement Architecture - - PowerPoint PPT Presentation

ARCHITECTURE MUSEUM QATAR 2012 ARCHITECTURE MUSEUM QATAR Wave movement Architecture was always considered as native of its own environment. Site plan concept Time line Look back the past, Present Mark the present, Past, Future Expect


slide-1
SLIDE 1

ARCHITECTURE MUSEUM

QATAR 2012

slide-2
SLIDE 2

ARCHITECTURE MUSEUM

QATAR

Architecture was always considered as native of it’s own environment.

Wave movement Site plan concept

Look back the past, Mark the present, Expect the future.

Time line

Past, Traditional Architecture History Present Future

slide-3
SLIDE 3

ARCHITECTURE MUSEUM

QATAR

Look back the past, Mark the present, Expect the future.

Sea Gate Wind Towers Land Gate Green Buffer Zone 1 Green Buffer Zone 1 Green Buffer Zone 2 Green Buffer Zone 2 Green Theatre Gate of 0 Carbon City Electric Car Terminal Green roof

Site plan Combining the natural wave grid with the time line, site layout passing from the traditional Arabian zone to the new o carbon area, thru the 0 carbon gate, in electric cars. Two green buffer zones has been designed to protect the 0 Carbon area from pollution

slide-4
SLIDE 4

façade which project new skin thru time.

ARCHITECTURE MUSEUM

QATAR

Architecture Elements

The Arch LED Screen Glass

The main museum building is composed of three elements, the glass ground floor representing the transparency to the present Architecture, the LED Screen Façade to project the future, and the two landmark structural Arcs representing the gate to the new Qatar.

slide-5
SLIDE 5

ARCHITECTURE MUSEUM

QATAR The Arch LED Screen projector Clear Glass Entrance Hall

slide-6
SLIDE 6

ARCHITECTURE MUSEUM

QATAR

slide-7
SLIDE 7

ARCHITECTURE MUSEUM

QATAR

slide-8
SLIDE 8

ARCHITECTURE MUSEUM

QATAR

Green Project Elements

LED Screen and sunshade Green Roof Solar thermal collector PV Panels To central site black water system Rain water collector Thermal storage Solar thermal absorbent Chiller To electrical grid

slide-9
SLIDE 9

ARCHITECTURE MUSEUM

QATAR

Collaboration

RAMI YOUNES ARCHITECT LEBANON NICOLAS NICOLOV ARCHITECT BULGARIA STEVIC DUSAN ARCHITECT

ILIJA TODOROVIC

ARCHITECT LEO RIESWIJK TEAM LEADER HOLLAND MIHAI BRAN STRUCTURE ROMANIA DRAGAN ZDRAVKOVIC STRUCTURE SERBIA HUG SYLVAIN ARCHITECT FRANCE ANDRIJ HOLUBETS ARCHITECT UKRAIN JAY ARCHITECT PHILIPPINE

slide-10
SLIDE 10

ARCHITECTURE MUSEUM

QATAR

Collaboration

The project was divided into four parts: 1- Main Building 2- External works 3- Modeling 4- Structure works

Each team started to work on his part in the project

slide-11
SLIDE 11

ARCHITECTURE MUSEUM

QATAR

Collaboration

1- Main Building 3- Modeling

First model Second model Last model

slide-12
SLIDE 12

ARCHITECTURE MUSEUM

QATAR

Collaboration

4- Structure Team

Telka model

Wile the building and modeling team were working the structural team was working in the same time to find the best solution to support the building

slide-13
SLIDE 13

ARCHITECTURE MUSEUM

QATAR

Collaboration In the end…

slide-14
SLIDE 14

ARCHITECTURE MUSEUM

QATAR

TEAM

LEO RIESWIJK TEAM LEADER HUG SYLVAIN ARCHITECTS NICOLAS NICOLOV RAMI YOUNES ILIJA TODOROVIC

STEVIC DUSAN

DRAGAN ZDRAVKOVIC MIHAI BRAN ANDRIJ HOLUBETS STRUCTURAL ENGINEERS