public workshop to discuss the zero emission airport
play

Public Workshop to Discuss the Zero-Emission Airport Ground S - PowerPoint PPT Presentation

Public Workshop to Discuss the Zero-Emission Airport Ground S upport Equipment Measure June 6, 2018 10:00 am 12:00 pm El Monte, CA 1 Overview Introductions Background Reported GSE data Next steps Questions and


  1. Public Workshop to Discuss the Zero-Emission Airport Ground S upport Equipment Measure June 6, 2018 10:00 am – 12:00 pm El Monte, CA 1

  2. Overview  Introductions  Background  Reported GSE data  Next steps  Questions and comments 2

  3. Multiple Air Quality Planning Efforts Sustainable Mobile State SIP Source SIP Freight Air Quality Strategy Standards Action Plan Strategy Freight Growth & Community Health Needs Pathways to the Future Petroleum Reduction Targets Climate SLCP GHG Scoping Change Reduction Goals Plan Strategy 3

  4. S tate Implementation Plan  S tates roadmap to achieving air quality goals  Ambient air quality goals  GHG reduction goals  S ustainable Freight Plan  Diesel Risk Reduction Plan  Zero-emission Ground S upport Equipment (GS E)  Accelerate transition of diesel and LS I GS E to zero-emission  Utilize a turnover & implementation strategy to ensure existing diesel equipment is replaced with ZE equipment by 2032  Potential initial implementation date: 2023 4

  5. Why look at airports?  Airport key contributors to economy in California  5% of California’s GDP  34 commercial airports in CA  Ongoing commitments to model environmental practices and reduce air pollution 5

  6. What are Airport GS E? 6

  7. Opportunity for additional zero-emission equipment in off-road sector  Well-suited for zero-emission use  Stop-and-go operation  Low speeds  Short distances 7

  8. Current Regulations  Emission standards for new engines used in GSE  Large-spark ignition engines  Compression ignition engines  In-use regulatory history  Previous MOU  Current In-Use Regulations  LSI Fleet Rule  In-Use Off-Road Diesel-Fueled Fleets 8

  9. DOORS Population - Diesel Electric Total Equipment: Diesel 44% 3050 56% 9

  10. zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA DOORS Population - Diesel Diesel GSE Type Alt Fuel Electric Diesel Total % Electric Baggage Tug 8 371 261 640 58% Belt Loader 0 336 148 484 70% A/ C Tug Narrow Body 1 154 328 483 32% Cargo Tractor 0 320 136 456 70% Cargo Loader 0 7 386 393 2% Other Airport GS E 0 69 137 206 33% A/ C Tug Wide Body 0 4 159 163 2% Lift 0 61 75 136 45% Forklift 0 9 36 45 20% Passenger S tand 0 2 28 30 7% A/ C Tractor 0 6 2 8 75% Fuel Truck 0 0 5 5 0% Bobtail 0 0 1 1 0% TOTAL 9 1339 1702 3050 10

  11. DOORS Population - LS I Electric 37% Total Equipment: LSI 2922 63% 11

  12. zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA DOORS Population - LS I LSI GSE Type LSI Electric Total % Electric Cargo Tractor 567 92 659 14% Baggage Tractor 332 253 585 43% Belt Loader 201 260 461 56% Cart 3 313 316 99% On-Road Equivalent GS E 271 1 272 0% Lift 104 57 161 35% AirCraft Tractor 67 59 126 47% Other Airport GS E 55 18 73 25% GS E Trucks 136 4 140 3% Passenger S tand 29 27 56 48% Bobtail 32 0 32 0% Cargo Loader 28 1 29 3% Lavatory Cart 6 3 9 33% De-icer 3 0 3 0% Grand Total 1834 1088 2922 12

  13. Zero-Emission Airport GS E Goals of Regulatory Measure  Increase the penetration of the first wave of zero- emission heavy-duty technology in applications that are well-suited for its use  Facilitate further technology development in off- road sector  Infrastructure expansion  Ensure time for incentives 13

  14. S takeholder input needed  Equipment data  Cost information  Equipment  Infrastructure  Operation and maintenance information  Fuel consumption, activity data  Other challenges 14

  15. Cost S haring Opportunities Funding Source Type Project F AA Federal Equipment VALE Infrastructure Carl Moyer S tate/ Local Equipment Infrastructure AB 617 funds S tate Equipment Infrastructure VW NOx S ettlement Mitigation Trust Equipment Infrastructure Zero-Emission Off-Road LCT/ AQIP In development: Freight Voucher (CORE) Equipment Infrastructure Local District AB 923, AB 2766 Equipment 15 Infrastructure

  16. Next S teps?  Technical Working group – mid 2018  2 nd Workshop – Late 2018/ Early 2019  Public Hearing Date – 2019 16

  17. Zero-Emission Airport GS E Contacts  Rhonda Runyon, Lead S taff  Rhonda.Runyon@ arb.ca.gov or (626) 350-6551  Femi Olaluwoye, Manager, Carl Moyer Off-Road S ection  Olufemi.Olaluwoye@ arb.ca.gov or (626) 459-4427  Webpage: https:/ / www.arb.ca.gov/ msprog/ offroad/ gse/ gse1.htm  S ign up for the Zero-Emission Airport GS E listserve to 17 receive updates!

  18. Questions and Comments 18

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.