public services area
play

PUBLIC SERVICES AREA CRAIG HUPY, AREA ADMINISTRATOR - PowerPoint PPT Presentation

PUBLIC SERVICES AREA CRAIG HUPY, AREA ADMINISTRATOR CHUPY@A2GOV.ORG PUBLIC SERVICES AREA Public Services Units *Wastewater Treatment Plant *Systems Planning *Engineering Water Treatment Plant Public Works WASTEWATER TREATMENT SERVICES


  1. PUBLIC SERVICES AREA CRAIG HUPY, AREA ADMINISTRATOR CHUPY@A2GOV.ORG

  2. PUBLIC SERVICES AREA  Public Services Units *Wastewater Treatment Plant *Systems Planning *Engineering Water Treatment Plant Public Works

  3. WASTEWATER TREATMENT SERVICES EARL J. KENZIE, P.E., MANAGER EKENZIE@A2GOV.ORG

  4. WASTEWATER TREATMENT SERVICES Contact:  Overview 49 Old Dixboro Road  History Ann Arbor, MI 48105-9405  Major Capital Projects (734) 794-6450  Treatment Processes  Challenges

  5. WASTEWATER TREATMENT SERVICES STAFF 33 Full Time Employees  Manager 1 position  Assistant Manager 1 position  WWTS Engineer 1 position  Water Utility Supervisor 5 positions  Maintenance Supervisor 1 position  Water Utility Technician 17 positions  SCADA Administrator 1 position  Inventory Control Technician 1 position  Administrative Assistant 2 positions  Electrical/Control Systems Technician 3 positions

  6. Wastewater Treatment Services Operating Budget: $15,269,985 Operate and maintain the wastewater treatment system; including the Wastewater Treatment Plant, eight sewage lift stations and industrial pretreatment program.

  7. WASTEWATER TREATMENT SERVICES OVERVIEW Geddes Rd. US 23 Old Dixboro Rd. Located in Ann Arbor Township

  8. WASTEWATER TREATMENT SERVICES OVERVIEW  Services Ann Arbor Township, Scio Township, and Pittsfield Township in addition to the City of Ann Arbor  Services approximately 130,000 people  Staffed 24/7 by certified, trained technicians  Operations regulated by State and Federal agencies  Permitted capacity at 29.5 mgd  Average daily flow is 18.4 mgd

  9. WASTEWATER TREATMENT SERVICES HISTORY

  10. WASTEWATER TREATMENT SERVICES HISTORY

  11. WASTEWATER TREATMENT SERVICES HISTORY

  12. WASTEWATER TREATMENT SERVICES HISTORY

  13. WASTEWATER TREATMENT SERVICES HISTORY

  14. WASTEWATER TREATMENT SERVICES HISTORY

  15. WASTEWATER TREATMENT SERVICES HISTORY

  16. WASTEWATER TREATMENT SERVICES HISTORY Old West Plant – 9.5 mgd Newer East Plant – 20 mgd 1936 – 1964 1977

  17. RESIDUALS HANDLING IMPROVEMENTS  Construction Schedule  Start: February 2009  Completion: June 2012  Construction Budget  Approximately $45.5 million  ACEC Awards  MI Engineering Honorable Conceptor Award – 2013  National Recognition Award - 2013

  18. GRAVITY BELT THICKENER

  19. SOLIDS HANDLING BUILDING

  20. TRUCK LOADING FACILITY

  21. FACILITIES RENOVATIONS PROJECT  Construction Schedule  Start: June 2012  Completion: August 2017  Construction Budget  Approximately $100 million  ASCE Awards  MI Section Outstanding Civil Engineering Award – 2017  SE MI Outstanding Civil Engineering Project of the Year Award - 2017

  22. FACILITIES RENOVATIONS PROJECT FRP Objectives  Replacement of West Plant  Plant-wide Infrastructure Rehabilitation  Improvements to East Plant Complex Design and Construction  Six years to complete design  Five plus years to construct  Numerous regulatory and site challenges

  23. FACILITIES RENOVATIONS PROJECT STATE FUNDING State Revolving Fund  $110,305,000 in State Revolving Fund low interest loan with deferred repayment  $2,592,168 in loan principal forgiveness for green project features  $256,153 grant for reimbursement of engineering design fees Michigan Department of Treasury  Estimated $1.5 M savings from sales tax exemption for contractor purchases

  24. WEST PLANT DEMOLITION

  25. UTILITIES DUCT BANK

  26. CLARIFIER WALL CONSTRUCTION

  27. PRECONSTRUCTION AERIAL VIEW

  28. AERIAL VIEW – AUGUST 2013

  29. POST CONSTRUCTION AERIAL VIEW

  30. FACILITIES RENOVATIONS PROJECT

  31. WASTEWATER TREATMENT PROCESSES  Liquid Treatment  Solids Removal Primary Screenings   Physical Grit   Secondary  Fats, oils & grease (FOG)  Biological  Biosolids  Chemical  Lime stabilization and subsurface land application  Physical  Centrifuge dewatering and landfill disposal  Tertiary  Physical  Disinfection  Ultra-violet (UV) 

  32. BIOSOLIDS CENTRIFUGE

  33. CENTRIFUGED BIOSOLIDS

  34. LAND APPLICATION OF LIQUID BIOSOLIDS

  35. WASTEWATER TREATMENT SERVICES CHALLENGES Active RR Track Single Access Rd. Huron River Fleming Creek

  36. WASTEWATER TREATMENT SERVICES CHALLENGES  NPDES Permit Requirements  Odor Management  Long-term Biosolids Management Strategy  Energy Management to Increase Sustainability  Succession Planning to Ensure Knowledgeable Workforce  Aging Infrastructure  Changing Federal or State Regulations

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.