  1. Public Involvement Meeting February 24, 2015

  2.  Project Overview  Purpose and Need  Project Scope  Traffic Control  Geometric Changes  Questions

  3.  Pavement shows signs of distress.  Bridges over Ashwaubenon Creek constructed in 1952 and 1956 need to be replaced.  Wingwalls on box culvert at Dutchmans Creek are tipping.  Provide improvements that meet current WisDOT design standards.  Address operational, physical, and safety concerns along the highway.

  4.  Project Limits  Approximately 500-1000 feet north of 8 th Street Roundabout to Lombardi Avenue.  Resurfacing project.  Concrete repair at intersections.  Replace bridges over Ashwaubenon Creek.  Replace box culvert wingwalls at Dutchmans Creek.  Upgrade traffic signals to current standards.

  5.  Replace guardrail within project limits.  Replace railroad crossing surface and signals.  Access to property north of Vanderperren Way to be updated.  Project to be constructed in 2017.

  6.  Road will be closed between Parkview Road and Hansen Road for bridge construction.  WIS 32 traffic will be detoured to US 41.  Ashland Avenue will reopen to through traffic after bridge construction is complete.  Resurfacing work to be completed under single lane closures.  Temporary side road closures for concrete repair and signal upgrades.

  7.  Vanderperren Way Property  Add left turn lane for northbound and southbound lanes to the south of the access point.  Access from driveway will be left in – right in – right out only.  Southbound drivers can perform u-turn at Vanderperren Way to go north.

  8. Questions? 

  9. Alex Dums – Project Leader alex.dums@dot.wi.gov 492-5707 Andrew Fulcer – Project Manager andrew.fulcer@dot.wi.gov 492-5664 Dan Segerstrom – WisDOT Supervisor daniel.segerstrom@dot.wi.gov 492-7718

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.