SLIDE 1
PROJECT LOCATION SITE LAYOUT A. PRIMARY ENTRANCE E B. PEDESTRIAN - - PowerPoint PPT Presentation
PROJECT LOCATION SITE LAYOUT A. PRIMARY ENTRANCE E B. PEDESTRIAN - - PowerPoint PPT Presentation
PROJECT LOCATION SITE LAYOUT A. PRIMARY ENTRANCE E B. PEDESTRIAN CONNECTION TO RO W B C. WALMART F CONNECTION C D. LED SITE LIGHTING D G E. EXISTING LEE TRAN STOP A F. ENCLOSED DUMPSTER H G. BIKE RACKS B H. SITE SIGN SITE
SLIDE 2
SLIDE 3
SITE LAYOUT
- A. PRIMARY
ENTRANCE
- B. PEDESTRIAN
CONNECTION TO ROW C. WALMART CONNECTION
- D. LED SITE
LIGHTING E. EXISTING LEE TRAN STOP F. ENCLOSED DUMPSTER
- G. BIKE RACKS
- H. SITE SIGN
A B B C D E F G H
SLIDE 4
SITE LANDSCAPE
A. EXISTING ROW BUFFER PRESERVED B. EXISTING TREES RELOCATED C. OVER 40% OPEN SPACE D. EXCEEDS MINIMUM TREES (CANOPY & TOTAL COUNT) E. OUTDOOR SEATING AREA F. PALLET TO MATCH OVERALL DEVELOPMENT
A B C D E F
SLIDE 5
SITE LANDSCAPE
SLIDE 6
OUTDOOR SEATING AREA
SLIDE 7
OUTDOOR SEATING AREA
SLIDE 8
OUTDOOR SEATING AREA
SLIDE 9
BUILDING ELEVATION
Walmart - NE Walmart - NW
SLIDE 10
BUILDING ELEVATION
US-41 Estero Parkway
SLIDE 11
BUILDING ELEVATION
- A. DEFINED ENTRANCE
- B. VARYING ROOF HEIGHTS
C. CHANGE IN MATERIALS
- D. AWNING & CANOPIES
E. BANDING/CONTRASTING COLORS F. PEAKED ROOF FORMS WITH OVERHANG
- G. BUILDING PROJECTION
- H. TOWER FEATURE
I. PARAPETS TO CONCEAL ROOF TOP EQUIPMENT J. CORNICE WITH RELIEFS
A B C D E F G H H I J
SLIDE 12
BUILDING MATERIALS
- A. STONE COATED
STEEL ROOF PANELS
- B. STEEL CANOPY
- C. FIBER CEMENT
PANELS
- D. STUCCO
- E. STONE VENEER
- F. CEMENT FIBER
BOARD TRIM
A B C D A E F
SLIDE 13
BUILDING SIGNAGE
CHANNEL LETTERS WITH INTERNAL LED LIGHTING
SLIDE 14
BUILDING SIGNAGE
ALUMINUM FRAME – INTERNAL LED ALUMINUM – NON ILLUMINATED
SLIDE 15
SITE SIGN
SLIDE 16
SUMMARY
- LESS S.F. & MORE OPEN SPACE THAN PERMITTED
BY THE EXISTING ZONING
- LANDSCAPE & BUILDING ELEVATIONS DESIGNED
TO ENHANCE THE COMMUNITY AND COMPLEMENT THE EXISTING DEVELOPMENT
- PEDESTRIAN/BIKE FRIENDLY WITH
CONNECTIONS TO PUBLIC TRANSPORTATION
- INCORPORATION OF PRELIMINARY COMMENTS
PROVIDED BY ESTERO DRB AND CLOSE COORDINATION WITH VILLAGE STAFF
SLIDE 17