PRESIDENTIAL DECREE 1586 THE PHILIPPINE ENVIRONMENTAL IMPACT STATEMENT SYSTEM Hiyas ng Bulacan Convention Center, Capitol Compound, City of Malolos, Bulacan September 23, 2019 ENVIRON RONMENTA ENTAL L MANAGEMENT MENT BUREAU U (emb)


slide-1
SLIDE 1

PRESIDENTIAL DECREE 1586 THE PHILIPPINE ENVIRONMENTAL IMPACT STATEMENT SYSTEM

Hiyas ng Bulacan Convention Center, Capitol Compound, City of Malolos, Bulacan September 23, 2019

slide-2
SLIDE 2

ENVIRON RONMENTA ENTAL L MANAGEMENT MENT BUREAU U (emb)

  • Executive Order (EO) 192: [Sections 4 & 5] “Providing for the

Reorganization of Department of Environment, Energy and Natural Resources (DEENR) renaming it as the Department of Environment and Natural Resources (DENR), and for other Purposes”

  • Section 16: Creation of the Environmental Management Bureau

(EMB)

slide-3
SLIDE 3

ENVIRONMENTAL MANAGEMENT BUREAU (emb) > VISION ION

A nation empowered to protect our finite resources, attuned to the pursuit of sustainable development, for a clean and healthy environment that enhances the Filipino quality of life for present and future generations

> MISSION SSION

To restore, protect and enhance environmental quality towards good public health, environmental integrity and economic viability.

slide-4
SLIDE 4

P.D. 1586: The Philippine Environmental Impact Statement (EIS) System of 1978 R.A. 8749: The Philippine Clean Air Act of 1990 R.A. 9003: The Ecological Solid Waste Management Act of 2000 R.A. 9275: The Philippine Clean Water Act of 2004 R.A. 6969: Toxic Substances and Hazardous and Nuclear Waste Control Act of 1990 R.A. 9512: Environmental Awareness and Education Act of 2008

Under E.O. 192, EMB is also mandated to provide research and laboratory services, and serve as secretariat in the adjudication of pollution cases.

MAN ANDA DATE TES

slide-5
SLIDE 5

ENVIRONMENTAL IMPACT STATEMENT SYSTEM OF 1978 (PD 1586)

  • Requires all government agencies,

government-owned

  • r

controlled corporation and private companies to prepare an environmental impact assessment for all development projects and undertaking that will significantly affect the quality of the environment prior issuance of Environmental Compliance Certificate (ECC) by DENR

  • It is a planning tool (environmental

costs must be considered during the conduct of the Feasibility Study)

slide-6
SLIDE 6

IMPLEMENTING RULES AND REGULATIONS >

DAO 2003-30: “Revised Procedural Manual for the Implementation of the Philippine Environmental Impact Statement System(PEISS)”

>

EMB Memorandum Circular 2007-02: “Guidelines on the Screening for Coverage and other Application Requirements under the PEISS”

>

DENR Memorandum Circular 2010-14: “Standardization of Requirements in the Implementation of the PEISS”

>

EMB Memorandum Circular 2014-05: “Guidelines for Coverage Screening and Standardized Requirements under PEISS amending relevant portions of EMB MC 2007-02”

slide-7
SLIDE 7

ACRONYMS >

ECPs – Environmentally Critical Projects (under Presidential Proclamation 1981-2146)

>

ECAs – Environmentally Critical Areas (under Presidential Proclamation 1981-2146)

>

EIA Report – Environmental Impact Assessment Report (in the form of an EIS)

>

IEE – Initial Environmental Examination

>

EPRMP – Environmental Performance Report and Management Plan

>

CNC – Certificate of Non-Coverage

>

EMP – Environmental Management Plan

slide-8
SLIDE 8

PROCESS/PROCEDURE >

SCOPING

  • Public Scoping (initial preparatory meeting with the host community[ies])
  • Technical Scoping (presentation by the proponent to the Review Committee [RevCom] of

the proposed project)

>

CONSULTATION/HEARING

  • Public consultation with the Stakeholders (Proponent & Review Committee Members) on

the proposed Project to determine its Social Acceptability)

>

REVIEW

  • EMB convenes a Multi-disciplinary Experts to be member of the RevCom

>

MONITORING AND VALIDATION

>

APPROVAL/DENIAL

slide-9
SLIDE 9

EMB Memorandum Circular 2014-05: “Guidelines for Coverage Screening and Standardized Requirements under PEISS amending relevant portions

  • f EMB MC 2007-02”

>

Section 1. Screening to determine coverage………..

  • Categories of Project ( A to D)

>

Section 2. Standard requirements

  • Document requirements (EIS, IEE, IEE Checklist, EPRMP)
  • Responsible Office to Process (Central Office or Regional

Office concerned)

>

Section 3. Repealing Clause

slide-10
SLIDE 10

FOUR CATEGORIES OF ENVIRONMENTALLY CRITICAL PROJECTS

slide-11
SLIDE 11
  • Non Ferrous

rrous Metal l Industries tries

  • Iron and S

Steel l Mills ls

  • Petroleum

roleum and Petrochem rochemical ical Industries tries

  • Smel

eltin ting g Plan ants

11

HEAVY Y INDUS USTRI TRIES ES

slide-12
SLIDE 12
  • Mining

ng and Quarryin ying g Projects ts

  • Forest

stry ry Project cts

  • Dikes

s for/an /and d Fishpo hpond d Develo lopm pmen ent t Projects ts

12

RES ESOURCE OURCE EX EXTRACTIVE ACTIVE IND NDUST USTRIES IES

slide-13
SLIDE 13

INFR FRAS ASTRU TRUCTURE CTURE PROJECTS CTS

13

  • Dams
  • Power

er Plant nts

  • Reclam

lamation ion Project ects

  • Roads

s and Bridges ges

slide-14
SLIDE 14

14

GOLF LF COURSE RSE AND ND OTHER ER TOURISM RISM PROJECTS ECTS

  • GOLF

LF COURSE RSE

  • RES

ESORTS ORTS

  • OTHER

ER LE LEISURE URE Projects ts

slide-15
SLIDE 15

15

P ro jectsm ayrequireE ITH E Ran E nvi viro n

  • nm

en ental talC

  • C
  • m

plianc ance C e C ertificat cateO RC e C ertificate ateo f

  • f

N

  • n
  • n-C
  • C
  • ve

vera rage ge,dependingo n thethres ho ldo rcapacity.

slide-16
SLIDE 16

http://eia.emb.gov.ph/wpcontent/ uploads/2016/06/Revised- Guidelines-for-Coverage- Screening-and- Standardized-Reqts.pdf

EMB Memorandum Circular 005 July 2014

16

Table blet t proj

  • ject

ect Show and explain your web, app or software projects using these gadget templates.

slide-17
SLIDE 17
  • Office Buildings with a gross floor area of more

than 10,000 square meters

  • Commercial Establishments with a gross floor

area of more than 10,000 square meters

  • New Road Construction and Road

Rehabilitations with a length of more than 2 kilometres

  • Cemeteries/Memorial Parks with a gross floor

area of more than 10,000 kilometers

Project Covered by PD 1586

slide-18
SLIDE 18

A document issued by the DENR-EMB after a positive review of an application, certifying that the proposed project has complied with all the requirements of the Environmental Impact Statement System

What is an ECC?

slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22

22

Go to emb.gov.ph and click the link to ECC Online Application.

slide-23
SLIDE 23

23

It certifies that, based on the submitted Project Description Report, the project is not covered by the EIS System and is not required to secure an ECC. Further, the CNC advises the Proponent on coverage to other requirements by other DENR offices, LGUs or

  • ther government agencies.

What is a Certificate of Non-Coverage (CNC)?

slide-24
SLIDE 24
slide-25
SLIDE 25

25

Go to emb.gov.ph, then click the link to CNC Online Application.

slide-26
SLIDE 26

26

Verify the coverage of the Project

slide-27
SLIDE 27

27

Indicate the location of the project and project component

slide-28
SLIDE 28

28

slide-29
SLIDE 29

29

Determine the Project Category

slide-30
SLIDE 30

30

slide-31
SLIDE 31

31

Answer the four (4) questions

slide-32
SLIDE 32

32

Apply for CNC

slide-33
SLIDE 33

33

Fill-up the Project Information

slide-34
SLIDE 34

34

Download and print the Order of Payment

slide-35
SLIDE 35

35

Update the payment

slide-36
SLIDE 36

36

Enter the Application Reference Number

slide-37
SLIDE 37

37

Upload the receipt and valid ID

slide-38
SLIDE 38

38

Track the status

slide-39
SLIDE 39

3 9

Please Visit the ff site:-emb.gov.ph

  • http://119.92.161.13/projectchecker.aspx (For CNC

application only)

  • Project Layout
  • Government ID
  • Bank Receipt

Requi uirement rements of cnc cnc applica icati tion

  • n
slide-40
SLIDE 40
  • Proof of Compatibility with the existing Land Use Plan (zoning)
  • Proof of authority over the Project Site (Title, Lease or Contract, etc.)
  • Accountability Statement of Proponents (see attached form) and the

preparation (if any, ff. annexes of revised procedural manual for DAO 2003-30)

  • Photographs of plates/Site Dev't Plan/Vicinity map of the project site showing

impact areas and affected areas and communities.

  • Duly Accomplished Project Environmental Monitoring &Audit

Prioritization Scheme (PEMAPS) Questionnaire (see Annex 2-7d of revised procedural manual for DAO 2003-30

Requi uirements rements of ECC C applic icat atio ion

slide-41
SLIDE 41

Strea eamlin mlined ed En Environment mental al Impact ct Assessmen essment t Process

  • Fast tracked ECC Processing
  • 40 days - Environmentally Critical Projects (ECP)
  • 20 days - Non-ECPs
  • Seven (7) days CNC online processing
  • ECA and Industrial Mapping
  • Posting of ECC in the Internet and Online Project

Screening for non-coverage

slide-42
SLIDE 42

43

Thank you and have a good day!