Presentation Water Business 1 Extensive international recognition Abengoa in Water Abengoa is internationally recognized in the water sector Water Company of the Year 2015 Strategic Project of the Year 2014 2013 Desalination Company of the


slide-1
SLIDE 1

1

Presentation Water Business

slide-2
SLIDE 2

Abengoa in Water

Extensive international recognition

Abengoa is internationally recognized in the water sector

Developer of the Year Desalination Deal of the Year: Beni Saf, Algeria Highly Commended Desalination Deal of the Year: Tlemcen Honaine, Algeria Desalination Company of the Year Highly Commended Water Company of the Year Desalination Company of the Year Highly Commended Desalination Company of the Year Water Company of the Year

2014

2008

2015 2006 2007 2008 2013 2009 2012

Strategic Project of the Year

2

slide-3
SLIDE 3

Abengoa in Water

Water Businesses

3

Municipal Water Hydraulic Infraestructures Industrial Water/Agriculture

slide-4
SLIDE 4

4

Introduction

  • Background
  • 2012. ONEE 100 MLD SWRO (ABG awarded)

Later, MAPM wanted 150 MLD SWRO

  • ABG joint both parts to create a single plant instead
  • f two, creating synergies: marine intake, stand-by

equipment, etc.

  • Final Plant Capacity : 275.000 m3/day

150.000 m3/day of drinking water 125.000 m3/day of irrigation water

  • Up to 400.000 m3/day in the future, which has

already been considered in the current design

200.000 m3/day of drinking water 200.000 m3/day of irrigation water

slide-5
SLIDE 5

5

Introduction

  • Plant Capacity : 275.000 m3/day

150.000 m3/day of drinking water 125.000 m3/day of irrigation water

  • EPC Deadlines : 32 Months
  • Main Systems and buildings:

Sea Water Intake system Sea Water Intake Chamber Self cleaning filters dosing System Self cleaning filters System UF Dosing System UF System Backwash and intermediate pumping station High pressure Pumps RO System Post treatement system Product water Tanks and pump stations Brine decharge systeme Electrical Rooms and control buildings Other buildings (Warehouse, laboratory, etc…)

slide-6
SLIDE 6

1

Site conditions

6

slide-7
SLIDE 7

7

  • Access
  • Weather

Wind Waves Tides

  • Topography
  • Seabed conditions (Offshore)

 Bathymetry  Morphology  Type of bottom (Isopachs)

  • Soil Conditions: Onshore Geotechnical Investigation

 Seismic zone  Type of soil

Site conditions

Site conditions

slide-8
SLIDE 8

2

Desalination plant design

8

slide-9
SLIDE 9

2.1

Desalination plant design. General lay-out

9

slide-10
SLIDE 10

10

6 Main Areas

  • Intake Area
  • RO/UF Building
  • Potable Product Water Area
  • Irrigation Product Water Area
  • Electrical Substation Area
  • Control Building Area

Desalination plant design. General lay-out

slide-11
SLIDE 11

11

Desalination plant design. General lay-out

Intake and seawater pumping station Self-cleaning filters UF system Intermediate tanks and RO system feeding pumps RO system Limestone filters -ONEE Limestone filters -MAPM Potable water tank Irrigation water pond Irrigation water pumping station -Chtouka Turbine and

  • utfall chamber

Flushing tanks

slide-12
SLIDE 12

12

Desalination plant design. Main electrical buildings and sub-station

Main electrical building Sub-station SWI electrical building Irrigation pumping station electrical building

slide-13
SLIDE 13

2.2

Desalination plant design. Availability and plant design

13

slide-14
SLIDE 14

14

Desalination plant design. Availability

  • Design Availability: 98 %
  • Equipment redundancy
  • Plants division in two lines
  • Plants interconnection in the pret-treatment inlet and in the permeate water
  • utlet collector
  • Independent bakcwash/CEB and flushing/CIP systems for each plant
  • High quality equipment

Go Goal

slide-15
SLIDE 15

15

Desalination plant design. Sea water Intake

  • Sea water intake:
  • 2 intake pipes of 70% of the future capacity
  • 3 (2+1S) equipped screening channels, civil work prepare for the future expansion (1 extra channel)
  • 4 (3+1S) intake pumps, space reserve for an extra pump to fulfill the future expansion requirements
  • 2 inlet collectors to the desalination plant 70% of the future require capacity
slide-16
SLIDE 16

16

Desalination plant design. Sea water Intake

  • Sea water intake:

ONEE-MAPM Future expansion Total Nº of bar screens 3 4 Nº of working bar screens 2 3 Nº of stand-by bar screens 1 1 Nº of travelling band filters 3 4 Nº of working travelling band filters 2 3 Nº of stand-by travelling band filters 1 1 Nº of seawater pumps 4 5 Nº of working seawater pumps 3 4 Nº of stand-by seawater pumps 1 1

slide-17
SLIDE 17

17

Desalination plant design. Selfcleaning filters

  • Self-cleaning filters:
  • 11+1S selfcleaning filters, 1 per RO skid (150 microns)

Installed in two connected lines of 5 and 6 self-cleaning filters + 1 Stand-by unit ONEE MAPM Nº total of selfcleaning filters per plant 6 5 Nº of working selfcleaning filters 6 5 Nº of stand-by selfcleaning filters 1 Total number of installed selfcleaning filters 12 Future expansion capacity: 400.000 m3/d ONEE MAPM Nº total of selfcleaning filters 8 8 Nº of working selfcleaning filters 8 8 Nº of stand-by selfcleaning filters 1 Total number of installed selfcleaning filters 17

slide-18
SLIDE 18

18

Desalination plant design. UF system

  • UF system:
  • Two (2) independent plants, ONEE´s and MAPM´s plants connected at the inlet points
  • Each plant divided into two lines of 50% of capacity
  • One (1) UF stand-by skid per line
  • Two (2) independent filtered water tanks with two (2) chambers
slide-19
SLIDE 19

19

Desalination plant design. UF system

  • UF system:
  • Two independent backwash system, each one consisting of:

 3 (2 + 1 S) backwash/CEB pumps  1 backwash tank (2 independent chambers)

  • Two independent CIP system, each one consisting of:

 2 (1 + 1 S) CIP pumps  2 (1 + 1 S) CIP tanks

slide-20
SLIDE 20

20

Desalination plant design. UF system

  • UF system:

ONEE MAPM Nº of lines per plant 2 2 Nº total of UF skids 26 22 Nº of working UF skids 24 20 Nº of stand-by UF skids per line 1 1 Total number of stand-by skids per plant 2 2 Future expansion capacity: 400.000 m3/d ONEE MAPM Nº of lines per plant 2 2 Nº total of UF skids 34 34 Nº of working UF skids 32 32 Nº of stand-by UF skids per line 1 1 Total number of stand-by skids per plant 2 2

slide-21
SLIDE 21

21

Desalination plant design. RO system

  • RO system:
  • Two (2) independent pants, ONEE´s and MAPM´s, connected at the product water delivery
  • Each line divided in two lines of 50% of capacity
  • Dedicated HPP and Booster pumps per RO skid
  • Energy recovery system by high efficiency isobaric chambers (ERI)
  • One (1) independent CIP system for each plant, designed for the cleaning of 1 RO skid
  • Spare of the main pumps in workshop:

 1 HPP´s feed pump  1 ERD feed pump  1 HPP pump  1 Booster pump  1 ERD module per EDR installed skid

slide-22
SLIDE 22

22

Desalination plant design. RO system

  • RO system:

ONEE MAPM Nº of lines per plant 2 2 Nº of HPP feed pumps 6 5 Nº of working HPP feed pumps 6 5 Nº of ERD feed pumps 6 5 Nº of working ERD feed pumps 6 5 Nº total of RO skids 6 5 Nº of working RO skids 6 5

slide-23
SLIDE 23

23

Desalination plant design. RO system

  • RO system:

Future expansion capacity: 400.000 m3/d ONEE MAPM Nº of lines per plant 2 2 Nº of HPP feed pumps 8 8 Nº of working HPP feed pumps 8 8 Nº of ERD feed pumps 8 8 Nº of working ERD feed pumps 8 8 Nº total of RO skids 8 8 Nº of working RO skids 8 8

slide-24
SLIDE 24

24

Self-cleaning filters 11 + 1S UF skids 2 x (12 + 1S) UF backwash pumps 3 (2 + 1S) UF CIP system Filtered water tank 2 chambers 1200 m3 HPP feed pumps 5 units ERD feed pumps 5 units RO skid 5 units 25.150 m3/d

Desalination plant design. UF and RO system

UF skids 2 x (10 + 1S) UF backwash pumps 3 (2 + 1S) UF CIP system Filtered water tank 2 chambers 1200 m3 RO skid 6 units 25.150 m3/d HPP feed pumps 6 units ERD feed pumps 6 units

slide-25
SLIDE 25

25

Desalination plant design. Product water tanks

  • Product water tanks:
  • Potable water tank:

1 concrete tank of 35.000 m3 of capacity divided in (2) two chambers

  • Irrigation water pond:

1 pond of 42.480 m3 of capacity  Irrigation pond and one potable water tank chamber connected to facilitate maintenance labors

slide-26
SLIDE 26

26

Desalination plant design. Irrigation water pump station

  • Irrigation water pump station:
  • 4 (3 + 1 S) pumps
  • Reserved space for one extra pump for the future expansion
slide-27
SLIDE 27

27

Desalination plant design. Chemical storage and dosing pumps

  • Chemical storage and dosing pumps:

The design of each dosing system is similar and includes: 2 bulk or preparation tanks (2x50 % capacity) (x+1) dosing pumps Tanks and pumps installed in a bund with protection canopy

slide-28
SLIDE 28

28

Desalination plant design. Chemical storage and dosing pumps

  • Chemical storage and dosing pumps:

A storage room is also considered for chemicals such as: sodium metabisulfite, antiscalant, citric acid and others required for the membranes maintenance An storage area for limestone big bags is also considered

slide-29
SLIDE 29

2.3

Desalination plant design. Accessibility and maintainability

29

slide-30
SLIDE 30

2.4

Desalination plant design. Materials

30

slide-31
SLIDE 31

31

Desalination plant design. Materials

According to international standards, summarazing:

  • Main Pumps: Superduplex (parts in contact with seawater or brine)

AISI 316 (parts in contact with permeate and potable water)

  • Tanks:
  • Seawater or brine tanks: RRCC
  • Product water tank: RRCC / Earth pond
  • Permeate water tanks: RRCC or CS epoxi coated or GRP depending of the size
slide-32
SLIDE 32

32

Desalination plant design. Materials

According to international standards, summarazing:

  • Piping: Inmisary and emissary: Reinforce concrete

Low pressure (seawater and brine): GRP, PP, HDPE, PVC High pressure (seawater and brine): Superduplex High pressure (permeate or product water): AISI 316/Carbon steel (only potable water) Chemicals: Plastics or others according to chemical

slide-33
SLIDE 33

33

Desalination plant design. Materials

According to international standards, summarazing:

  • Valves:

Low pressure Butterfly valves: Sea water or brine Body: Cast iron epoxi coated Disc: Cast iron with Halar or Nylon 11 coating Permeate or Product water Body: Cast iron epoxi coated Disc: AISI 316 Plug valves: Seawater or brine Body, trim and bonnet: ASTM A-890 Gr. 5A or similar Check valves: Seawater or brine Body, disc and shaft: Superduplex Others Body, disc and shaft: AISI 316

slide-34
SLIDE 34

3

Operation and Maintenance Organization

34

slide-35
SLIDE 35

35

Desalination Plant (O&M)

Organization Chart

Total Employés

slide-36
SLIDE 36

36

Desalination Plant (O&M)

O&M Management (Main Tasks)

Continue follow-up and implementation (updates) of the following programs approved by the Owner:

  • Operations Program.
  • Maintenance Program.
  • Human Resources Program.
  • Administrative Program.
  • Safety and Health Program.
  • Environmental Compliance Program.
  • Training/Qualification Program.
  • Management system program.
  • Decreasing the faults or low output of the process.
  • Prolonging the useful life of the equipment, repairing or adapting it when necessary.
  • Ensuring a reduction in cost, by the suitable management of the available material and human

resources.

  • Optimising electrical and chemicals consumption.
  • Decreasing the risk of accidents.

Objetives Implementation

Go Goal 98%

slide-37
SLIDE 37

37

Level 1 - Schedule

Engineering: 9 months Procurement: 19 months Construction :22 months Commissioning & Start-Up: 9 months

Total 32 months

slide-38
SLIDE 38

38

Electrical and I&C Erection

  • Main Activities

Substation Placement, electrical installation of HV transformers MV/LV Transformers, placement and electrical installation MV and LV switchgear, Placement, electrical installation and Interconnection UPS System Placement and interconnection of control panels/cabins Cable trays Installation HV, MV, LV and I&C cables (laying & connection) Lighting system Installation of instruments Labeling of cables, boxes, electrical cabins, control panels, instruments, etc… Testing cables and Instruments ( Meager , continuity and sealing test etc…..) Grounding System

  • Construction strategy:

The electrical and I&C activities will be divided such as: Substation 60 Kv, Transformers electrical assembly, pouring and treatment of oil (Subcontractor 1) Electrical Assembly (Subcontractor 2) Instruments and control panels assembly (Self performance)

  • Completion Time: 14 Months

HV cable 1980 mL MV cable 24490 mL LV cable 85154 ml I&C Cable 38320 ml Cable Tray 8224ml Conduit 3290ml

slide-39
SLIDE 39

39

Site Installation

  • Main Site installations

Site Offices 2 MV/LV transformers ( 400 kVA and 150 kVA) Electrical panels Site lighting Site fencing, and access door Water connection (7.5 l/s is the water Flow required the construction period) Water pond if required Bashing plant Warehouse Storage area for Sand, grave, etc… Toilets and septic tanks Metallic containers for housekeeping Washing Area for concrete mixers

  • Completion Time: NTP + 5 Months