PRESENTATION OF COMMONWEALTH CENTRE TO NATIONAL GEOSPATIAL INTELLIGENCE AGENCY (NGA) PREPARED BY: OUR TEAM Crescent Resources (Real Estate Arm of Duke Energy) Significant Resources Significant Experience US Ownership


  1. PRESENTATION OF COMMONWEALTH CENTRE TO NATIONAL GEOSPATIAL INTELLIGENCE AGENCY (NGA) PREPARED BY:

  2. OUR TEAM • Crescent Resources (Real Estate Arm of Duke Energy) – Significant Resources – Significant Experience – US Ownership – Flexible and Responsive Decision Making • Millennium Realty Advisors (Brokerage) – In-depth market knowledge – DoD/Intelligence Community Familiarity

  3. NGA REQUIREMENTS TRANSFORMATION PRIORITIES • East/West Campuses: Consolidate East Coast sites • NIMA Security Services – protect operation, minimize risk • Modernize End user IT Environment NGA Goal #10 – Transform Infrastructure • Modernize and consolidate facilities to ensure security and promote productivity • Plan and occupy NIMA East on a protected site

  4. NGA TRANSFORMATION PRIORITIES (Backup) • East/West Campuses: Consolidate East Coast sites – Reduce vulnerability – Provide modern environment – Integrate production – Achieve managerial and operational efficiencies – Strengthen cultural identity and unit cohesion • NIMA Security Services – Strengthen protection of people, systems, facilities, and missions – Introduce risk management and risk mitigation strategies • Modernize End user IT Environment –

  5. NGA Goal #10 – Transform Infrastructure (Backup) • Modernize and consolidate facilities to ensure security and promote productivity – Security – Close excess facilities – Reduce operating costs • Plan and occupy NIMA East on a protected site – Consolidate Eastern operations on a secure reservation – Attack-hardened to preclude a single point of failure

  6. NGA CONSOLIDATION Navy Yard Dulles North Reston 500,000 SF 100,000 SF 500,000-750,000 SF Bethesda 750,000 SF Commonwealth Centre Ft. Belvoir

  7. NGA PLAN (As we know it) Await BRAC 2005 Results Before Proceeding, then • Consolidate at Ft. Belvoir – Requires substantial onsite/offsite infrastructure work – Must go through local governmental/political process – Start with Navy Yard Relocation in 2011 • Lease Reston 3 (10 year lease delays Reston to 2015) • Renovate Bethesda ($50M), move 5-10 years later • Renew/relocate Dulles North, as appropriate

  8. WHY WE ARE HERE Commonwealth Centre is Ideal Solution for NGA • Capacity for entire consolidation (2.2M sqft, not including below grade) • Ideal site characteristics maximize force protection considerations • New Construction Enhances Security and Operational Efficiencies – Designed to most current force protection construction standards – Designed to enhance operational flow of mission – Designed to incorporate latest IT technology, with flexibility for growth • Ready to go, project complete within the FYDP – Utilities at site already sized to accommodate entire consolidation – Zoned “by right” for entire campus – Ownership (Crescent) can handle project without assistance • Flexibility in Structuring Contract – Partial requirement can reserve entire site – Lease or Purchase considered

  9. COMMONWEALTH PHYSICAL ATTRIBUTES Size: 101.4 acres allows 2.2M sqft, plus basement space Security: Crowned topography allows 400ft+ setbacks Additional parking structure buffers Fenced Perimeter Infrastructure: Multiple fiber providers Public power from different substations Sewer and water sized for entire consolidation Existing roads to accommodate increased traffic

  10. COMMONWEALTH INTANGIBLES Development Risk: Established, well funded US ownership By right zoning approval Amenities: Good housing, food service, abundant shopping Good schools Proximities: Near NRO Near Reston and Dulles North 25 minutes to Pentagon Value: Open Book Costing Fair and Reasonable Contractual Agreement

  11. ALTERNATIVE TO CURRENT PLAN Ft Belvoir Commonwealth Capacity for Reqt √ √ No Competing Interests √ Minimal Development Risk √ Minimal Political Risk √ Level 5 Security √+ √ Traffic Issues Resolved √ Housing and Amenities √ √ Operational Efficiency √ √ Completion in Our Lifetime √+

  12. SUGGESTED ACTION PLAN Date Task/Milestone Cost 5/04 – 12/05 Planning and Design $9M 1/05 – 9/05 County Approvals $1M 10/1/05 BRAC Complete/ Sign Lease/Begin Construction 6/07 Dulles North Occupancy $ 8/07 Reston Occupancy $$ 2/08 Navy Yard Occupancy $$$ 5/08 Bethesda Occupancy $$$$

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.