PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road RFP No. J2112395P1 S TAFFING MATRIX RFP No. J2112395P1 Construction Engineering and Inspection-Wiles Road from Riverside Drive to


  1. PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road RFP No. J2112395P1

  2. S TAFFING MATRIX RFP No. J2112395P1 Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road

  3. RFP No. J2112395P1 JAMES JEFFERS , P .E. CEI for Wiles Road from Riverside Drive S enior Proj ect Engineer t o Rock Island Road • Y ears of Experience: 25 • Direct ly managed t he const ruct ion of t he $43M Design Build Dixie Highway Flyover Bridge and $120M I-95 Managed Lanes proj ect for FDOT dist rict 4. • FDOT Broward Const ruct ion Manager, wherein he delivered an annual work program averaging more t han $250M. Under his leadership, t he Broward Operat ions office cont inually exceeded Dist rict 4 goals and always led t he dist rict in achieving posit ive result s. • Proj ect Engineer on similar urban art erials including S unrise Boulevard, Hollywood Boulevard and S R 7.

  4. RFP No. J2112395P1 HEMBERTH S ALAZAR, P .E. CEI for Wiles Road from Riverside Drive Proj ect Administrator t o Rock Island Road • Y ears of Experience: 12+ • $12.6 Million Design-Build Miami-Dade Expressway Authority (MDX) ORT conversion proj ect in S R-836 5 new toll gantry structures and modification to three currently existing in the S R-836 corridor and construction of an exit ramp from S R-836 west bound to access the FDOT District VI Office. • Proj ect Administrator / CS S / S enior Roadway Inspector. This $1.1 million proj ect consisted of new drainage exfiltration trenches installation, milling and resurfacing, sidewalk reconstruction and pavement striping from US -1 to Grand Ave. and from S W 27th Ave. to S W 32nd Ave. Cit y of Miami • Milling and resurfacing of S R 5/ US -1 from North of S E 17th S t to Broward Blvd. D4 FDOT hybrid proj ect which involves milling and resurfacing of S R 5/ US-1 from North of S E 17th S t to Broward Blvd. The proj ect included miscellaneous safety, median landscape, signalization, drainage, signing improvements. It also included the reconstruction of a new approach slabs, wing walls, barrier walls, traffic separators, sidewalks and removal and application of new structural steel coating on the Tarpon River Bridge. • FDOT D6 S R 973 (Galloway Rd.) from S W 41st S t thru S W 96th S t (Length of Proj ect: 3.5 Miles) • FDOT D4 S R 838 (S unrise Boulevard) @ S R 7 S idewalk Proj ect next to the “ S FWMD Canal C-12” in Broward County • FDOT D4 S R 84 @ S R 817 (University Dr.) Intersection in Broward County

  5. RFP No. J2112395P1 R Y AN S ANTIAGO CEI for Wiles Road from Riverside Drive Contract S upport S pecialist / S enior Inspector t o Rock Island Road • Y ears of Experience: 15+ • Contract S upport S pecialist on: • S R-A1A from east of Mercedes River small bridge to S unrise, 4.5 Mil. • A1A/ S outh Ocean Drive from Miami-Dade County Line to S eacrest Parkway, 4.8 Mil. • A1A from NE 18 th S T to Oakland Park Blvd., 9.5 Mil. • Biscayne Groupings, 32 Mil. • S r. Inspector on: • NW 57th Ave. / Red Road Reconstruction Grouping, 40 Mil. • Dixie Flyover Bridge Construction, 43 Mil. E 18 th S • S R 5 (US -1/ Federal Hwy), from S heridan S treet to S treet, 12.5 Mil.

  6. RFP No. J2112395P1 OTHER S TAFF AND S ERVICES CEI for Wiles Road from Riverside Drive Inspector / RCS / S ecretary / S urveyor t o Rock Island Road • Logan Fasanella, RJ Behar & Company, Inc. • 5 Y ears of Experience as an inspector in District 4 in Broward County • Mona Catalona, S olid Consulting Engineers, Inc. • 11 Y ears of Experience as a Resident Compliance S pecialist and as a S ecretary with FDOT District 4 in Broward County. • Landon “ Alfie” Cross, P .S .M., Carnahan Proctor Cross, Inc. • 45 Y ears of Experience as S enior Proj ect S urveyor

  7. RFP No. J2112395P1 Proj ect Over View CEI for Wiles Road from Riverside Drive t o Rock Island Road • The proj ect involves roadway widening 4-6 lanes • Lighting conduit placement • ADA Compliance • Bike lane construction • Asphalt overbuild – raising profile • Tree Root pruning • S ignal upgrades • Extensive drainage . • Full replacment of curb and gutter. • Gravity walls and unique “ L” walls of varying heights. • This is a mixed-use corridor, wit h bot h resident ial and commercial considerat ions. The fire st at ion current ly under const ruct ion at Rock Island Rd and Wiles Rd will not be direct ly impact ed by operat ions.

  8. RFP No. J2112395P1 Potential Issues CEI for Wiles Road from Riverside Drive Utility Relocations t o Rock Island Road • Utility relocation is a challenge in any proj ect. The volume and variety of adj ustments and relocations to be performed by maintaining agencies proves unique and will require a significant level of coordination between all parties. • Of note are: • 6” Gas Main (S TA 242+90, 251+70, 253+00 and 263+50). • 16” and 12” Water Mains requiring relocation throughout the proj ect limits. • We will rely upon our previous relationships with David Rivera and Max Chamorro (TECO) and Coral S prings Public Works Department to encourage them to relocate their lines and have the least impact upon construction. • Buried fiberoptic • French Drain located where it was not anticipated on east proj ect. • We will rely upon our previous relationship: • David Rivera and Max Chamorro (TECO) • Coral S prings Public Works Department

  9. RFP No. J2112395P1 Potential Issues CEI for Wiles Road from Riverside Drive Lane Closures / Noise Ordinance t o Rock Island Road • A single lane closure will be allowed bet ween 9:30PM and 7:30 AM. • Noise ordinance (6:00 PM t o 7:00 AM on weekdays, 6:00 PM t o 9:00 AM weekends and holidays). • Cont ract or t o obt ain a special permit allowing operat ions out side of t he t ime const raint s placed in t he Coral S prings. • Const ruct ion around Whispering Woods Development . This HOA is preparing t o commence a resurfacing of t he propert y. • Property Manager, Mary Banmiller • The roadway widening will impact t he driveways • Publix Plaza, 74 Ave, and multiple shopping centers. • Must maintain access during roadway widening and driveway reconstruction at each affected entrance. • The Whispering Woods Business Center - Completely dependent on accessibility from Wiles Rd.

  10. RFP No. J2112395P1 Potential Issues CEI for Wiles Road from Riverside Drive Environmental t o Rock Island Road • The silt fence, inlet protection and outfall protection • S pecial attention given to the 11-acre Whispering Woods Park containing wetland mitigation • 13.9-acre Red Lichen S anctuary • S pecial care will be taken to ensure no runoffs will enter The S anctuary during mast arm installation. • Vacuum street sweeper at least twice a week “ or as directed by the Engineer.” • Cleanliness will be a topic of discussion during the regular progress meetings. • Dust Control will be vital.

  11. RFP No. J2112395P1 Public Coordination CEI for Wiles Road from Riverside Drive t o Rock Island Road • F & J will inst it ut e a proact ive Public Involvement effort t o ensure all mot orist , businesses, and proj ect st akeholders are kept informed of upcoming lane closures and changes in t raffic pat t erns, if needed. • Invit e ALL st akeholders t o our pre-const ruct ion conference. • We will meet wit h t he resident s effected: • Whispering Woods community • Hidden Hammock/ Butler Farms • Careful coordinat ion bet ween t he Cont ract or, t he HCED and t he propert y owners will be needed t o ensure an issue free operat ion.\ • Coordinat ion wit h new fire st at ion being built . • Coordinat ion wit h irrigat ion and landscaping wit h businesses and resident s

  12. RFP No. J2112395P1 Complete S treets Initiative CEI for Wiles Road from Riverside Drive t o Rock Island Road • Our team has extensive experience with not only the Complete S treets initiatives, but also with the road diet designs. • Currently implementing Complete S treets initiatives: • CEI services for Wiles Rd. from Rock Island Rd to S R7 • CEI services for Pine Island Rd. from Nova Dr. to S R-84. • We understand the importance of this initiative to make streets safe for all users.

  13. RFP No. J2112395P1 OTHER CONS IDERATIONS CEI for Wiles Road from Riverside Drive t o Rock Island Road • F & J Team is current ly on t he Wiles Rd. phase 1 from Rock Island Rd. t o S R-7 proj ect wit h RJ Behar (R1261804P1). • Open communication and coordination between overlapping proj ects. • Local QA/ QC oversight • Francis Chin S r. P .E. (45 Yrs Experience) , and Osvaldo, “ Ossie” Larrazabal, P .E. (14 Yrs Experience) • Initial and bi-annual reviews of the Team to evaluate resources, equipment, certifications, documentation, and processes and recommend improvements. • S killed, proven reviews at no cost to Broward County. • CBE wit h Broward Count y • County Business Enterprise • F & J is a DBE/ S BE wit h FDOT

  14. RFP No. J2112395P1 THANK YOU FOR YOUR CONS IDERATION CEI for Wiles Road from Riverside Drive t o Rock Island Road

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend