PRELIMINARY ENGINEERING REPORT FOR THE REGIONALIZATION ASSISTANCE PROGRAM BROWN COUNTY, INDIANA PRESENTED TO: BROWN COUNTY REGIONAL SEWER DISTRICT AND HELMSBURG REGIONAL SEWER DISTRICT Prepared by: HomeTown Engineering, LLC 5610 University


slide-1
SLIDE 1

PRELIMINARY ENGINEERING REPORT

FOR THE

REGIONALIZATION ASSISTANCE PROGRAM BROWN COUNTY, INDIANA

PRESENTED TO:

BROWN COUNTY REGIONAL SEWER DISTRICT AND HELMSBURG REGIONAL SEWER DISTRICT

Prepared by: HomeTown Engineering, LLC 5610 University Drive - Indianapolis, IN 46219

December 2019

slide-2
SLIDE 2

TONIGHT’S GOALS:

  • SUMMARIZE THE FINDINGS OF THE

REPORT

  • ANSWER QUESTIONS RELATED TO THE

REPORT AND ITS FINDINGS

slide-3
SLIDE 3

Helmsburg R.S.D. Beanblossom Study Area Fox Lake Study Area Woodland Lake Study Area Freeman Ridge Rd Study Area Travlac Study Area Lake Lemon Study Areas Needmore Study Area

slide-4
SLIDE 4

Helmsburg R.S.D. Beanblossom Study Area Fox Lake Study Area Woodland Lake Study Area Freeman Ridge Rd Study Area Travlac Study Area Lake Lemon Study Areas Needmore Study Area

5 miles

STUDY AREAS

slide-5
SLIDE 5
  • Wastewater treatment for the majority
  • f Brown County is provided by

individual septic tanks.

  • According to research from the County

Health Dept, 45% of dwellings in Brown County do not have permitted septic systems. Most were built in 1950-90.

  • Bean Blossom RSD established in 2006.

Name changed & service territory expanded to entire County with the exception of Nashville, Helmsburg RSD, and Gnawbone RSD in 2016.

BROWN COUNTY RSD

slide-6
SLIDE 6

HELMSBURG RSD

  • APPROXIMATELY 175 PEOPLE
  • TREATMENT PLANT WAS CONSTRUCTED IN 1995 & RATED TO TREAT 25,000

GPD.

  • RECENT INSPECTIONS BY THE INDIANA DEPARTMENT OF ENVIRONMENTAL

MANAGEMENT HAVE FOUND THE PLANT TO BE SATISFACTORY

  • AVERAGE DAILY FLOWS TO THE WASTEWATER PLANT ARE WITHIN THE PLANT CAPACITY
  • RSD HAS COMPLETED SUBSTANTIAL RENOVATIONS IN THE PAST 5 YEARS
  • ESTIMATED REMAINING USEFUL LIFE OF THE PLANT: APPROXIMATELY 10 TO 15

YEARS.

slide-7
SLIDE 7

Helmsburg RSD

slide-8
SLIDE 8

POPULATION PROJECTIONS/ EQUIVALENT DWELLING UNITS

Bean Blossom: 276 EDUs/52,360 gpd Helmsburg: 132 EDUs/24,1400 gpd Lake Lemon: 353 EDUs/60,010 gpd

slide-9
SLIDE 9

REPORT ASSUMPTIONS

  • POPULATION GROWTH WILL BE LIMITED TO VACANT LOTS

IN PLATTED AREAS

  • A LOW PRESSURE COLLECTION SYSTEM WILL BE USED IN

ALL AREAS

  • THE FLOW RATE FOR THE COLLECTION SYSTEM IS 170

GALLONS PER EQUIVALENT DWELLING UNIT PER DAY

slide-10
SLIDE 10

REPORT ASSUMPTIONS

  • AN ADDITIONAL 2,500 FEET OF TRANSMISSION PIPE HAS BEEN INCLUDE

IN COST ESTIMATES FOR THE UNKNOWN PLANT LOCATIONS TO HELP ACCOUNT FOR PIPE THAT MAY BE NECESSARY

  • CUSTOMERS WILL PROVIDE A RIGHT OF ENTRY AND EASEMENT AT NO

COST

  • LAND COSTS FOR NEW PLANTS ARE BASED ON 5 ACRES REQUIRED

AND $12,000 PER ACRE

  • EASEMENTS FOR TRANSPORT COSTS ARE BASED ON $2.50 PER

RUNNING FOOT

slide-11
SLIDE 11

OPTIONS EVALUATED:

BB - 1 Construct a new plant in the Bean Blossom area to treat all flows and

abandon the Helmsburg WWTP

BB - 2 Construct a new plant in the Bean Blossom area to treat only the flows in the

Bean Blossom area

BB - 3 Construct a new plant in the Bean Blossom area to treat all flows with the

exception of Helmsburg and maintain the Helmsburg WWTP for the Helmsburg Territory

H - 1

Construct a new plant in Helmsburg to treat all flows

H - 2

Construct a new plant in Helmsburg to treat all flows with the exception of the Bean Blossom area

T - 1

Construct a new plant in Trevlac to treat all flows with the exception of the Bean Blossom area and abandon the Helmsburg WWTP

T - 2

Construct a new plant in Trevlac to treat Lake Lemon and Trevlac flows, construct a new plant in Bean Blossom to treat flows from the Bean Blossom area, and maintain the Helmsburg WWTP

slide-12
SLIDE 12

ANNUAL OPERATION AND MAINTENANCE COSTS BY OPTION

slide-13
SLIDE 13

EVALUATING ALTERNATIVES ON PRESENT WORTH

  • ALTERNATIVE COMBINATIONS ARE EVALUATED BASED ON PRESENT

WORTH CALCULATIONS.

  • THE ALTERNATIVE COMBINATIONS INCLUDE COLLECTION, TRANSPORT,

AND TREATMENT SYSTEM COSTS.

  • PRESENT WORTH ALLOWS FOR THE CALCULATION OF FUTURE ANNUAL

OPERATION AND MAINTENANCE COSTS TO BE BROUGHT BACK TO PRESENT DAY DOLLARS. THIS ALLOWS FOR A MORE EQUITABLE COMPARISON OF COSTS TO THE OWNER AND CUSTOMER BECAUSE O AND M COSTS ARE INCLUDED.

slide-14
SLIDE 14

The lowest-cost alternative on a present worth basis is a combination of Options T2 and BB2 – Trevlac Regional/Bean Blossom Local/Helmsburg as-is.

slide-15
SLIDE 15

Looking at the County as a whole, including the cost of a new plant in Helmsburg and including the O, M and R costs associated with that plant, constructing regional plants in Trevlac and Bean Blossom becomes the most cost effective Option for the County.

slide-16
SLIDE 16

THANK YOU