SLIDE 20 SCOPE OF WORK
Design elements shall address, but are not limited to the following:
- Demolish existing Taxiway B (full length), north connectors (up to the
hold bar), south (full length), and hold-bay pavement
- Relocate Taxiway B to the south by 100’ in order for the taxiway to be 300’
centerline to centerline with Runway 7L-25R
- New acute angle connectors B6 & B9
- Extend existing taxiway connectors that are north of Taxiway B by 150’
from hold bar to the northern edge of the relocated Taxiway B
- Reconstruct Connectors B5, B9, and B11 in the same location due to failed
pavement