pr oposed capital pr ojec t pr esentation
play

Pr oposed Capital Pr ojec t Pr esentation No ve mb e r 22, 2016 - PowerPoint PPT Presentation

R hinebec k Centr al Sc hool Distr ic t Pr oposed Capital Pr ojec t Pr esentation No ve mb e r 22, 2016 Rhine b e c k Ce ntra l Sc ho o l Distric t 1. Building Condition Survey 2. Prioritized Needs & Long Range Plan 3. Capital Project


  1. R hinebec k Centr al Sc hool Distr ic t Pr oposed Capital Pr ojec t Pr esentation No ve mb e r 22, 2016

  2. Rhine b e c k Ce ntra l Sc ho o l Distric t 1. Building Condition Survey 2. Prioritized Needs & Long Range Plan 3. Capital Project Development 4. Community Facilities Taskforce 5. Capital Project Referendum

  3. Rhine b e c k Ce ntra l Sc ho o l Distric t Rhinebeck High School/Bulkeley Middle School

  4. Rhine b e c k Ce ntra l Sc ho o l Distric t Rhinebeck High School/Bulkeley Middle School

  5. Rhine b e c k Ce ntra l Sc ho o l Distric t Chancellor Livingston Elementary School

  6. Rhine b e c k Ce ntra l Sc ho o l Distric t Chancellor Livingston Elementary School

  7. Ca pita l Pro je c t Sc o pe • Health/Safety/Security • Roofs/Windows/Doors/Lighting • Building Infrastructure • Educational Space • Exterior/Fields/Sitework

  8. Ca pita l Pro je c t Sc o pe Roofs/Windows/Doors/Lighting Health/Safety/Security Skylights Interior Doors and Hardware • • Roof Ladders Elevator Smoke Separation • • Roof re ‐ coating Kitchen Ceilings • • Asphalt roof replacement Telephone System • • Cupola re ‐ coating Access Control • • Exterior Doors and Windows Entrance Handrails • • Lighting replacement Areaway Grates and Guardrails • • Emergency Backup Generator (MS/HS) •

  9. Ca pita l Pro je c t Sc o pe Building Infrastructure Educational Space Ceiling replacements Mechanical Ventilation • • Corridor Lockers Acoustic Panels in Gymnasium • • Kitchen upgrades Physics Lab renovation • • Floor replacement Educational Solar Power • • Chimney & Loading Dock Demonstration Installation • Plumbing upgrades • Electric Service consolidation • Exterior/Fields/Sitework Track improvements • Athletic Field renovation & Irrigation • Curbing and Asphalt paving • Asphalt and Concrete Walkways •

  10. Ca pita l Pro je c t Sc o pe

  11. Rhine b e c k Ce ntra l Sc ho o l Distric t New Windows Rhinebeck High School/Middle School First Floor Plan – Windows Replacement

  12. Rhine b e c k Ce ntra l Sc ho o l Distric t Floor Replacement Rhinebeck High School/Middle School First Floor Plan – Floor Replacement

  13. Rhine b e c k Ce ntra l Sc ho o l Distric t Floor Replacement Rhinebeck High School/ Middle School Second Floor Plan – Floor Replacement

  14. Rhine b e c k Ce ntra l Sc ho o l Distric t Windows Chancellor First Floor Plan ‐ Windows

  15. Rhine b e c k Ce ntra l Sc ho o l Distric t Windows Skylights Chancellor Second Floor Plan – Windows and Skylights

  16. Rhine b e c k Ce ntra l Sc ho o l Distric t Replace Shingle Roof Recoat Spray Foam Roof Rhinebeck High School/Bulkeley Middle School – Roofing Areas

  17. Rhine b e c k Ce ntra l Sc ho o l Distric t SHINGLE ROOF REPLACMENT

  18. Rhine b e c k Ce ntra l Sc ho o l Distric t RECOAT FOAM ROOF

  19. Rhine b e c k Ce ntra l Sc ho o l Distric t REPAIR CHIMNEY

  20. Rhine b e c k Ce ntra l Sc ho o l Distric t CARPET REPLACEMENT FLOOR TILE REPLACEMENT

  21. Rhine b e c k Ce ntra l Sc ho o l Distric t CEILING REPLACEMENT

  22. Rhine b e c k Ce ntra l Sc ho o l Distric t ACOUSTICAL TREATMENTS IN HIGH SCHOOL GYM

  23. Rhine b e c k Ce ntra l Sc ho o l Distric t SCIENCE ROOM COUNTERS AND CABINETRY

  24. Rhine b e c k Ce ntra l Sc ho o l Distric t REPLACE CORRIDOR LOCKERS

  25. Rhine b e c k Ce ntra l Sc ho o l Distric t WINDOW REPLACMENT

  26. Rhine b e c k Ce ntra l Sc ho o l Distric t SCRAPE, PRIME AND PAINT STEEL LINTELS

  27. Rhine b e c k Ce ntra l Sc ho o l Distric t RECOAT COPULAS

  28. Rhine b e c k Ce ntra l Sc ho o l Distric t DOOR HARDWARE UPGRADES

  29. Rhine b e c k Ce ntra l Sc ho o l Distric t SITEWORK AND ATHLETIC FIELDS

  30. Rhine b e c k Ce ntra l Sc ho o l Distric t WINDOW/CURTAIN WALL REPLACEMENT

  31. Rhine b e c k Ce ntra l Sc ho o l Distric t SKYLIGHT REPLACEMENT

  32. Rhine b e c k Ce ntra l Sc ho o l Distric t ROOF LADDER REPLACEMENT

  33. Rhine b e c k Ce ntra l Sc ho o l Distric t ELEVATOR SMOKE GUARDS

  34. Ca pita l Pro je c t Sc o pe

  35. NGS DI L OR BUI F CE RVI SE BT NG DE I ST XI E

  36. xisting De b t Se rvic e o c a l Sha re o f E L

  37. E stima te d T a x I mpa c t (ne t o f re tiring de b t)

  38. Ca pita l Pro je c t T ime line Referendum Vote Vote Date ‐ Tuesday, December 6, 2016 2:00pm ‐ 9:00pm Vote Location ‐ Bulkeley Middle School Cafeteria • Design and Engineering …………………………………. Winter/Spring 2017 • SED submission, review & approval ……... Summer/Fall 2017 • Public Bid for Construction Project ……………….……..... Spring 2018 • Construction Phase ………………………………………….………………………… 2018 ‐ 2019

  39. R hinebec k Centr al Sc hool Distr ic t Pr oposed Capital Pr ojec t Pr esentation No ve mb e r 22, 2016

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend