Power Delivery

1 2 3

slide-2
SLIDE 2

1/22/2019 2 Power Delivery

Transmission Asset Protection Territories - MW

Transmission Asset Protection Overview Video

 Play the video  Transmission Asset Protection Video

4 5 6

slide-3
SLIDE 3

1/22/2019 3 FAQ’s

 Why is it so important to protect our

transmission right of ways?

 Why now?  Just down the road there is an

encroachment in your right of way?

 I didn’t find an easement during our title

search?

2003 blackout

50 million people, $6 billion … and one tree

 On Thursday, Aug. 14, 2003, a massive

power outage began on the New York state power grid shortly after 4 p.m. It would cascade to become the most widespread blackout in North American

  • history. At its peak, it affected 50 million

people across much of the northeastern United States and most of southern Ontario.

  • Aug. 13, 2003 (the preceding day) 9:03 pm, Aug. 14, 2003 (the height of the blackout)

7 8 9

slide-4
SLIDE 4

1/22/2019 4

Transmission Asset Protection Guidelines Overview

10

Transmission Asset Protection Wire Zones Make Safety a Priority During Land Clearing/Logging!

 Duke Energy does not permit:  Felling trees that will break

minimum separation

 Logging decks  Loading equipment  Stockpiling timber  Fuel tanks/Flammable material  Unauthorized roads or

equipment crossings within its right of ways.

10 11 12

slide-5
SLIDE 5

1/22/2019 5 How can we help?

 Provide permits to cross

rights of way

 Check clearances  Top trees that will break

minimum separation.

Liability

 Large Manufacturing

Plants

 Claim lost revenues

 Property Damage  Equipment

Your life

13 14 15

slide-6
SLIDE 6

1/22/2019 6

16 17 18

slide-7
SLIDE 7

1/22/2019 7 During Construction Dont’s

Dangerous Excavation

19 20 21

slide-8
SLIDE 8

1/22/2019 8

Vendor Caused Interruption

 If you or your crew causes an interruption:

 Move quickly away from the accident scene  Do not re-enter the accident scene until ECC

has been notified

 ECC will try to re-energize the line

 Leave all vehicles, tools and personal items in the

accident scene

 Do not attempt to extinguish fires  Do secure the area to prevent the public from

entering the accident scene, but always stay a safe distance from the downed power line.

Duke Energy Portal Public Information

 Duke Energy Portal Public Information  How We Manage Right of Ways

 Navigate to “What Can You Do In A Right Of

Way?”

 Guidelines and Restrictions (you will get the one

based on the region you are signed into)

 Brochures  Look Up and Live  Farmer Safety Brochure  Logging Safety Brochure  Shared Use Path/Trail Guidelines

22 23 24

slide-9
SLIDE 9

1/22/2019 9

25 26 27

slide-10
SLIDE 10

1/22/2019 10

28