power delivery
play

Power Delivery 2 3 1 1/22/2019 Power Delivery 4 Transmission - PDF document

1/22/2019 KAPS Ryan Daugherty- Asset Protection Specialist 1 Power Delivery 2 3 1 1/22/2019 Power Delivery 4 Transmission Asset Protection Territories - MW 5 Transmission Asset Protection Overview Video Play the video


  1. 1/22/2019 KAPS Ryan Daugherty- Asset Protection Specialist 1 Power Delivery 2 3 1

  2. 1/22/2019 Power Delivery 4 Transmission Asset Protection Territories - MW 5 Transmission Asset Protection Overview Video  Play the video  Transmission Asset Protection Video 6 2

  3. 1/22/2019 FAQ’s  Why is it so important to protect our transmission right of ways?  Why now?  Just down the road there is an encroachment in your right of way?  I didn’t find an easement during our title search? 7 2003 blackout 50 million people, $6 billion … and one tree  On Thursday, Aug. 14, 2003, a massive power outage began on the New York state power grid shortly after 4 p.m. It would cascade to become the most widespread blackout in North American history. At its peak, it affected 50 million people across much of the northeastern United States and most of southern Ontario. 8 Aug. 13, 2003 (the preceding day) 9:03 pm, Aug. 14, 2003 (the height of the blackout) 9 3

  4. 1/22/2019 10 Transmission Asset Protection Guidelines Overview 10 Transmission Asset Protection Wire Zones 11 Make Safety a Priority During Land Clearing/Logging!  Duke Energy does not permit:  Felling trees that will break minimum separation  Logging decks  Loading equipment  Stockpiling timber  Fuel tanks/Flammable material  Unauthorized roads or equipment crossings within its right of ways. 12 4

  5. 1/22/2019 How can we help?  Provide permits to cross rights of way  Check clearances  Top trees that will break minimum separation. 13 Liability  Large Manufacturing Plants  Claim lost revenues  Property Damage  Equipment  Your life 14 15 5

  6. 1/22/2019 16 17 18 6

  7. 1/22/2019 19 During Construction Dont’s 20 Dangerous Excavation 21 7

  8. 1/22/2019 Vendor Caused Interruption  If you or your crew causes an interruption:  Move quickly away from the accident scene  Do not re-enter the accident scene until ECC has been notified  ECC will try to re-energize the line  Leave all vehicles, tools and personal items in the accident scene  Do not attempt to extinguish fires  Do secure the area to prevent the public from entering the accident scene, but always stay a safe distance from the downed power line. 22 23 Duke Energy Portal Public Information  Duke Energy Portal Public Information  How We Manage Right of Ways  Navigate to “What Can You Do In A Right Of Way?”  Guidelines and Restrictions (you will get the one based on the region you are signed into)  Brochures  Look Up and Live  Farmer Safety Brochure  Logging Safety Brochure  Shared Use Path/Trail Guidelines 24 8

  9. 1/22/2019 25 26 27 9

  10. 1/22/2019 28 10

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend