Planning Projects: Highlights In Process, Under Review, and Under - - PowerPoint PPT Presentation
Planning Projects: Highlights In Process, Under Review, and Under - - PowerPoint PPT Presentation
Planning & Community Development Department Planning Projects: Highlights In Process, Under Review, and Under Construction. Transportation Advisory Commission October 23, 2014 Overview of Planning Process Planning & Community
Planning & Community Development Department
Overview of Planning Process
PPR Entitlement Design Review Building Permit
2 PPR
- Interdepartmental
Review
- Meeting with
Applicant
- City Council
Entitlement
- CEQA Clearance
- Public Hearing
- Conditions of
Approval
Design Review
- CEQA Clearance
- Public Hearings
- Conditions of
Approval
Building Permit
- Review for
Compliance
- Permit Issuance
- Building Inspections
Planning & Community Development Department
Overview of Planning Process
- Predevelopment Plan Review
- Preliminary Consultation
- Entitlements
> Conditional Use Permit, Variance, etc. > Master Plan > Planned Development > Design Review
- Building Permit
3
Planning & Community Development Department
Overview of Planning Process
4 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- Purpose
> Achieve better projects through early consultation; > Inform applicants of regulations and procedures; > Avoid significant investment in project without preliminary City review; > Identify issues that may arise during review of the projects; and > Inform the Council and public of proposed projects.
- Projects of communitywide significance.
» Greater than 50,000 s.f. with one discretionary action; or » 50 or more housing units; or » Any other project determined by the Director to be of major importance to the City.
5
Planning & Community Development Department
Predevelopment Plan Review (PPR)
6 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- In process:
> 123 & 127 Hurlbut St. (multi-family)
- 29 units.
7
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
8
123 & 127 Hurlbut St.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
9
123 & 127 Hurlbut St.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
10 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- In process:
> 55 E. Fillmore St. (Huntington Rehabilitation)
- Construct four-story rehabilitation hospital with 90 beds
» 40 skilled nursing facility; » 40 rehabilitation; and » 10 assisted living.
- To be presented to City Council (date TBD).
11
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
12
55 E. Fillmore St.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
13
55 E. Fillmore St.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
14 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- In process:
> 245 S. Los Robles Ave. (multi-family)
- 58 units.
- To be presented to City Council (date TBD).
15
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
16
245 S. Los Robles Ave.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
17
245 S. Los Robles Ave.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
18 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- In process:
> 2490 Mohawk St. (multi-family)
- 18 units.
19
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
20
2490 Mohawk St.
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
21
2490 Mohawk St.
East (Altadena) elevation North (Mohawk) elevation
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
22 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
- Mixed-Use Project:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
23
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
24
130-140 N. Fair Oaks Ave.
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
25 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
- Julia Morgan Building/Kimpton Hotel:
> 78 N. Marengo Avenue > Project Description:
- Construction of a four-to-six-story addition (88,740 s.f.) with a
total of 180 guest rooms.
26
Planning & Community Development Department
Predevelopment Plan Review (PPR)
27
Julia Morgan Building/Kimpton Hotel
Looking northeast at Marengo & Union
Planning & Community Development Department
Predevelopment Plan Review (PPR)
28
Julia Morgan Building/Kimpton Hotel
Looking southwest at Garfield & Holly
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
29 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
- Urban Housing Project
> 262 N. Los Robles Ave., 410 E. Corson St. & 251-303
- N. Oakland Ave.
- Demolish 172 units in six buildings;
- Construct five-to-seven-story, multi-family residential project:
» 432 units
- Subterranean parking for 736 cars.
30
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
31
Urban Housing Project
North (Corson) elevation West (Los Robles) elevation
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
32 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
- St. Luke Medical Center:
> 2632 E. Washington Blvd. > Project Description:
- Occupy former hospital with medical offices;
- Demolish “Annex Building” and a one-story office building; and
- Construct of three-story, 280-space, parking structure.
33
Planning & Community Development Department
Predevelopment Plan Review (PPR)
34
- St. Luke Medical Center
Planning & Community Development Department
Predevelopment Plan Review (PPR)
35
- St. Luke Medical Center
Planning & Community Development Department
PPR Completed; Entitlement Not Submitted
36 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- Urban Housing Project
> 170 N. Halstead Ave.
- Demolish three manufacturing buildings totaling 5,200 s.f.;
- Construct five-story, multi-family residential project:
» 24 units
- Surface parking for 30 cars.
37
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
38
170 N. Halstead Ave.
West (Halstead) elevation
Planning & Community Development Department
Entitlement Phase
- Major Projects:
> Non-residential project, or non-residential portion of a mixed-use project, that exceeds 25,000 square feet of gross floor area. > Residential project with 25 or more units.
39
Planning & Community Development Department
Entitlement in Process (Major Project)
40 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Major Projects
- Shriners for Children Medical Center:
> 909-915 S. Fair Oaks Avenue > Project Description:
- Construction of a three-story, 74,800 s.f., medical office
building (ambulatory surgery center, medical clinic, and medical offices) over three levels of subterranean parking.
» Facility would be used for out-patient (i.e. same day) medical
- services. In-patient (i.e. over-night) medical services would be
provided by Shriners medical staff at Huntington Hospital.
> Status:
- Environmental review complete.
- Hearing Officer (November 5).
41
Planning & Community Development Department
Predevelopment Plan Review (PPR)
42
Shriners for Children Medical Center
Looking southwest at Colorado & Los Robles
Planning & Community Development Department
Entitlement in Process (Major Project)
43 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Major Projects
- Paseo Colorado Redevelopment Project:
> Project Description:
- Demolition of 160,000 s.f. former Macy’s/adjacent tenant
spaces along Colorado Blvd.;
- Construction/operation of 6-story hotel (179-rooms):
- Construction of 6-story mixed-use building:
» 25,000 s.f. of ground-floor retail/restaurant space; and » 71 for-sale residential units on 2nd-6th floors.
> Status:
- Approved by Planning Commission (September 10).
- Appealed to City Council (November 17).
44
Planning & Community Development Department
Predevelopment Plan Review (PPR)
- PPR Completed, not yet submitted for entitlement:
> 130-140 N. Fair Oaks Ave.
- Demolition of two commercial buildings totaling 16,178 s.f.
- Construct seven-story, 49,000 square foot, mixed-use building
with 39 residential units over two parking levels.
45
Paseo Colorado Redevelopment Project
N Los Robles Ave E Green St E Colorado Bl N Marengo Ave
Planning & Community Development Department
Predevelopment Plan Review (PPR)
46
Paseo Colorado Redevelopment Project
Looking southwest at Colorado & Los Robles
Planning & Community Development Department
Predevelopment Plan Review (PPR)
47
Paseo Colorado Redevelopment Project
Looking northwest at Green & Los Robles
Planning & Community Development Department
Entitlement in Process (Major Project)
48 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Major Projects
- Urban Housing Project:
> 277 N. Molino Ave.
- Demolition of two two-story buildings, including Pasadena
Church of Religious Science, and surface parking lot.
- Construct six-story, 75-foot, urban housing building with 105
units over one level of at-grade parking and one level of subterranean parking.
» 159 parking spaces.
> Status:
- Environmental review underway.
49
Planning & Community Development Department
Predevelopment Plan Review (PPR)
50
277 N. Molino Ave.
Looking southwest at Corson & El Molino
Planning & Community Development Department
Entitlement Phase (in process)
- Planned Developments
> Intended for large sites (>2 acres) where a particular mix of uses is desired, as well as high quality appearance, land use compatibility, or special sensitivity to neighborhood character; > Ensure orderly and thorough procedures to result in quality urban design.
51
Planning & Community Development Department
Planned Development
52 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Planned Developments
> Desiderio (655 Westminster St.)
- Former Desiderio Army Reserve Center to be converted to
Desiderio Neighborhood Park and Desiderio Homes.
» Nine single-family detached bungalows in a courtyard formation. » Includes demolition of historic Desiderio Hall.
- Upcoming hearings:
» Planning Commission (September 10) » Recommended approval. » City Council (October 27)
53
Planning & Community Development Department
Predevelopment Plan Review (PPR)
54
Desiderio
Looking southwest at Colorado & Los Robles
Planning & Community Development Department
Planned Development
55 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Planned Developments
> Lincoln/Parsons (100 W. Walnut St.)
- 620,000 s.f. of office uses:
» Includes 30,000 s.f. of ancillary retail uses.
- 10,000 s.f. of restaurant uses; and
- 475 residential units:
» Includes 12 work/live units.
- Status:
» Environmental Impact Report: » Responses to comments underway. » Planning Commission: » November 2014.
56
Planning & Community Development Department
Predevelopment Plan Review (PPR)
57
Lincoln/Parsons
Planning & Community Development Department
Planned Development
58 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Planned Developments
> Hill-Colorado Hotel Projects (1336 & 1347 E. Colorado Blvd.)
- Construction of eight-story 375 room hotel and 35,000 s.f. of
commercial on northern property; and
- Construction of a four-story 150 room hotel on southern
property.
- Status:
» Environmental review in progress: » Environmental Impact Report.
59
Planning & Community Development Department
Predevelopment Plan Review (PPR)
60
Hill-Colorado Hotel Projects
Planning & Community Development Department
Predevelopment Plan Review (PPR)
61
Hill-Colorado Hotel Projects
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Establish procedure for public or semi-public and open space uses to reduce processing time and uncertainty by consolidating several Conditional Use Permit hearings over an extended period of time.
62
Planning & Community Development Department
Master Plans
63 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Hillsides Home for Children (940 Avenue 64)
- Demolish 6,000 s.f. recreation facility and swimming pool; and
- Construct multi-purpose building with 52 parking spaces in the
lower level.
» No change in enrollment or staff.
- Status:
» Environmental review in progress. » Initial Study & Mitigated Negative Declaration.
64
Planning & Community Development Department
Predevelopment Plan Review (PPR)
65
Hillsides Home for Children
Planning & Community Development Department
Predevelopment Plan Review (PPR)
66
Hillsides Home for Children
Planning & Community Development Department
Master Plans
67 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Maranatha High School (169 S. St. John Ave.)
- 29,000 s.f. of new administration, classroom, planetarium,
athletic, and greenhouse facilities.
- Hearings:
» Historic Preservation Commission (November 18, 2013). » Design Commission (January 14). » Planning Commission (May 28): » Continued to date uncertain for additional analysis and project modification.
- Upcoming hearings:
» Planning Commission (October 22) » City Council (date TBD)
68
Planning & Community Development Department
Predevelopment Plan Review (PPR)
69
Maranatha High School
Planning & Community Development Department
Master Plans
70 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Huntington Hospital (100 W. California Blvd.)
- Amendment to Master Plan (20 years)
» Reconfigure boundary of Master Plan; » Demolish buildings (240,000 s.f.); » Rehabilitate existing buildings; and » Construct additions and new buildings (190,000 s.f.).
- Status:
» Environmental review in progress: » Environmental Impact Report.
71
Planning & Community Development Department
Predevelopment Plan Review (PPR)
72
Huntington Hospital
Planning & Community Development Department
Master Plans
73 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Fuller Seminary (135 N. Oakland Ave.)
- Amendment to Master Plan
» Amend boundaries to exclude properties sold to private developer and exclude development on those properties. » No new development.
- Modification of Development Agreement.
- Status:
» Application incomplete.
74
Planning & Community Development Department
Master Plans
75 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Villa Esperanza (2116 E. Villa St.)
- Demolish 12 of 13 structures on site (~30,000 s.f.)
- Construct two-story administration building
- Construct two one-story classroom buildings, along with
- utdoor play area and landscaping.
- New buildings will total 42,300 s.f.
- Hearings:
» Design Commission (May 27) » Planning Commission (August 13). » Recommended approval to City Council. » City Council (September 29). » Approved project.
76
Planning & Community Development Department
Predevelopment Plan Review (PPR)
77
Villa Esperanza
Planning & Community Development Department
Master Plans
78 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> Walden School (50-72 S. San Gabriel Blvd.)
- Construction of two-story classroom (12,910 s.f.), along with
several smaller buildings. No increase in enrollment.
- Hearings:
» Planning Commission (March 26) » Continued to date uncertain in order to perform noise study.
- Upcoming hearings:
» Planning Commission (date TBD) » City Council (date TBD)
79
Planning & Community Development Department
Predevelopment Plan Review (PPR)
80
Walden School
Planning & Community Development Department
Master Plans
81 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Master Plans
> La Salle High School (3880 E. Sierra Madre Blvd.)
- Project Description:
» Remove baseball field. » Construct aquatic complex, athletic building, practice gymnasium, and parking lot with 63 parking spaces. » Construct theatre and performing arts complex. » Construct classroom and administrative office addition to main classroom building. » Construct field house on north side of sports field.
- Status:
» Completing Environmental
- Upcoming hearings:
» Planning Commission (date TBD) » City Council (date TBD)
82
Planning & Community Development Department
Predevelopment Plan Review (PPR)
83
La Salle High School
Planning & Community Development Department
Predevelopment Plan Review (PPR)
84
La Salle High School
Planning & Community Development Department
Entitlement Phase
- Design Review:
> Purpose:
- Apply Citywide urban design principles;
- Encourage new structures that show creativity and imagination;
- Avoid nostalgic misrepresentations that may confuse the
relationships among structures over time; and
- Promote the conservation, enhancement, preservation, and
protection of historic resources.
> Process:
- Concept, 50%, and Final, or Consolidated
85
Planning & Community Development Department
Entitlement Phase
86 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase
- Design Review:
> Mixed Use Project (25 W. Walnut St.)
- Construct a 5-story mixed-use project:
» 201 apartments; and » 10,000 s.f. of ground floor retail and.
- Hearings:
» Design Commission (July 22) » Approval of Concept Design Review.
87
Planning & Community Development Department
Predevelopment Plan Review (PPR)
88
25 W. Walnut St.
South (Walnut) elevation
Planning & Community Development Department
Entitlement Phase
89 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Design Review:
> Mixed-Use Project (33-45 W. Green St.)
- Construct a four-story mixed-use building including addition of
three to four stories above the existing building at 33 W. Green Street and ground-level parking for nine cars
» 9 units.
- Hearings:
» Design Commission (July 22) » Approval of Concept Design Review.
90
Planning & Community Development Department
Predevelopment Plan Review (PPR)
91
33-45 W. Green St.
South (Green) elevation
Planning & Community Development Department
Entitlement Phase
92 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase (in process)
- Design Review:
> Green Hotel Apartments (86 S. Fair Oaks Ave.)
- Construction of a six-story mixed-use building:
» 64 residential units; and » 5,000 square feet of commercial space .
- Upcoming Hearing:
» Design Commission (December 8).
93
Planning & Community Development Department
Predevelopment Plan Review (PPR)
94
Green Hotel Apartments
South (Dayton) elevation
Planning & Community Development Department
Predevelopment Plan Review (PPR)
95
Green Hotel Apartments
South (Dayton) elevation
Planning & Community Development Department
Entitlement Phase (in process)
96 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase
- Design Review:
> Crown City Medical Center (550-566 E. Colorado Blvd.)
- Construction of a 112,000 s.f., five-story medical office and
retail building.
» Includes 16,000 s.f. of ground floor retail.
- Hearings:
» Planning Commission (July 7, 2013) » Approval. » Design Commission (July 9, 2014) » Approval of Concept Design Review. » 50% Advisory Review (October 28).
97
Planning & Community Development Department
Predevelopment Plan Review (PPR)
98
Crown City Medical Center
Looking southwest at Colorado & Madison
Planning & Community Development Department
Predevelopment Plan Review (PPR)
99
Crown City Medical Center
Looking southwest at Colorado & Madison
Planning & Community Development Department
Entitlement Phase
100 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Entitlement Phase
- Design Review:
> Multi-Family Project (60-80 S. Vinedo Ave.)
- Construct one-to-three-story multi-family project:
» 26 units.
- Hearings:
» Design Commission (July 22) » Approval of Concept Design Review.
101
Planning & Community Development Department
Predevelopment Plan Review (PPR)
102
60-80 S. Vinedo Ave.
Planning & Community Development Department
Building Permit Submitted
103 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Building Permit Submittal
- All-Saints Church
> Demolition:
- Scott Hall (used for Sunday school/day care); and
- Office trailer.
> Interior remodel:
- Regas House and Rectory buildings;
> Construction:
- Three building complex (~39,000 s.f.);
» Offices, conference rooms, forum building, and youth programs.
- One level of subterranean parking (120 cars) and storage,
- ffices, and mechanical equipment;
104
Planning & Community Development Department
Predevelopment Plan Review (PPR)
105
All-Saints Church
West (Euclid) elevation
Planning & Community Development Department
Predevelopment Plan Review (PPR)
106
All-Saints Church
North (Walnut) elevation
Planning & Community Development Department
Building Permit Submitted
107 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Building Permit Submittal
- 700 E. Walnut Street
> Five-story mixed use building:
- 82 condominiums;
- 6,350 s.f. of ground floor retail; and
- One level of subterranean parking with 143 parking spaces.
108
Planning & Community Development Department
Predevelopment Plan Review (PPR)
109
700 E. Walnut Street
Looking southeast at Walnut & El Molino
Planning & Community Development Department
Building Permit Submitted
110 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Building Permit Submittal
- 770 E. Walnut Street
> Five-story mixed use building:
- 91 apartments;
- 6,100 s.f. of ground floor retail; and
- One level of subterranean parking with 139 parking spaces.
111
Planning & Community Development Department
Predevelopment Plan Review (PPR)
112
770 E. Walnut Street
Looking southwest at Walnut & Hudson
Planning & Community Development Department
Building Permit Submitted
113 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Building Permit Submittal
- Hampton Inn & Suites
> Demolish existing 54-room ‘Vagabond Inn’; and > Construct five-story, 80-room hotel.
114
Planning & Community Development Department
Predevelopment Plan Review (PPR)
115
Hampton Inn & Suites
Looking northeast at Colorado & Michigan
Planning & Community Development Department
Building Permit Submitted
116 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Building Permit Submittal
- Allen-Walnut Mixed Use
> Construction of two buildings over one level of subterranean parking.
- 131 apartment units; and
- 5,000 s.f. of retail/restaurant space.
117
Planning & Community Development Department
Predevelopment Plan Review (PPR)
118
Allen-Walnut Mixed Use
Looking northwest at Walnut & Allen
Planning & Community Development Department
Under Construction
119 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Building Permit Submittal
- Marriott Extended Stay Hotel
> Five-story hotel with 144 rooms.
120
Planning & Community Development Department
Predevelopment Plan Review (PPR)
121
Marriott Extended Stay Hotel
Looking northwest at Walnut & Fair Oaks
Planning & Community Development Department
Under Construction
122 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Under Construction
- Office Building
> 680 E. Colorado Boulevard
- Five-stories.
- 160,000 s.f. office building.
» Includes 14,000 s.f. of ground-floor retail.
123
Planning & Community Development Department
Predevelopment Plan Review (PPR)
124
680 E. Colorado Blvd.
Looking southeast at Colorado & El Molino
Planning & Community Development Department
Predevelopment Plan Review (PPR)
125
680 E. Colorado Blvd.
Looking southeast at Colorado & El Molino
Planning & Community Development Department
Under Construction
126 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Under Construction
- Mixed Use Project
> 680 E. Union Street (‘Union Village’):
- Four to five-stories.
- 118 residential units.
- 10,000 s.f. of ground floor commercial space.
- Includes 14,000 s.f. of ground-floor retail.
- 229 subterranean parking spaces.
127
Planning & Community Development Department
Predevelopment Plan Review (PPR)
128
686 E. Union Blvd.
Looking southeast at Union & El Molino
Planning & Community Development Department
Predevelopment Plan Review (PPR)
129
686 E. Union Blvd.
West (El Molino) elevation
Planning & Community Development Department
Under Construction
130 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Under Construction
- Mixed Use Project
> 880 E. Colorado Boulevard
- Phase 1: Renovation and re-use of the Constance Hotel
building and historic one-story buildings with hotel, restaurant, and retail uses; and construction of an above-grade parking garage with 125 spaces.
- Phase 2: Construction of a rear addition to the hotel including
five residential units; and construction of a new office building with restaurant and retail uses and a subterranean parking garage with 320 spaces.
131
Planning & Community Development Department
Predevelopment Plan Review (PPR)
132
880 E. Colorado Blvd.
North (Colorado) elevation
Planning & Community Development Department
Under Construction
133 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Under Construction
- Urban Housing Project
> 3330 E. Foothill Boulevard
- Four-stories
- 212 apartments
- One level of subterranean parking.
134
Planning & Community Development Department
Predevelopment Plan Review (PPR)
135
3330 E. Foothill Blvd.
Looking southeast at Foothill & Sierra Madre Villa
Planning & Community Development Department
Overview of Planning Process
136 Predevelopment Plan Review PPR Completed; Entitlement Not Submitted Entitlement in Process (Major Project) Planned Development Master Plan Design Review Under Construction Building Permit Submitted
Planning & Community Development Department
Summary of Cases in Process
- Predevelopment Plan Review (4)
- Planned Developments (3)
- Master Plans (7)
- Use Permits (45)
- Variances (11)
- Design Review (54)
> Certificates of Appropriateness. > Signage. > New Construction.
137