Planned Timelines of MVP 4 th EFSA Technical Group on PESTICIDES IUCLID Meeting 17-18 June 2020 Francois Le Goff / Zsolt Gabor European Chemicals Agency Minimum Viable Product (MVP) The requirements of the MVP are delivered via two software


  1. Planned Timelines of MVP 4 th EFSA Technical Group on PESTICIDES – IUCLID Meeting 17-18 June 2020 Francois Le Goff / Zsolt Gabor European Chemicals Agency

  2. Minimum Viable Product (MVP) The requirements of the MVP are delivered via two software • systems IUCLID • ECHA Cloud Services (ECHACS) • MVP can be viewed as two parallel deliverable streams • Authority focused features and requirements • Industry focused features and requirements • Both streams being worked on in parallel (contracts for development work • started by ECHA) Early access to IUCLID features are provided via IUCLID Beta • instances of ECHACS Early access to ECHACS features will be provided via “test-flows” • in production system 2

  3. Additional changes • will be implemented as EU_PPP specific IUCLID format changes documents OHT changes submitted to the OECD (OHT • group) for consultation until end of July IUCLID documents changes submitted to • the OECD (IUCLID group) for consultation until 3 rd of July Second consultation to start on the 3 rd of • July if possible Alpha version of IUCLID 6.5 to be available in July • Availability in the Beta Cloud Service in September • 3

  4. IUCLID Feature Timelines 1/2 Feature Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr Validation assistant rules B P and configuration Improved annotations B P (bulk export, transfer) Light dossier export B P Web UI improvements B P P Filtering of confidential B P information Indicate latest dossier B P B – Beta; P - Production 4

  5. IUCLID Feature Timelines 2/2 Feature Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr PDF creation for the entire dossier (including B P components) Search for entities and B P for document selection Reports (e.g. DAR, conf. B P claims, notified studies) Improved API P Documentation B – Beta; P - Production 5

  6. ECHACS Feature Timelines Feature Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr Support of large instances in the Cloud T P Services EFSA instance and access T/P by Authority Submission Portal T P Authority view of T P submissions Improving submission of T P large dossiers Routing PPP dossiers to EFSA Authority IUCLID T P instance T – Test; P - Production 6

  7. Thank you!

  8. IUCLID Features Format changes to support PPP data requirements • Web UI Improvements • E.g.: reorder repeatable blocks; improve rich-text field • Validation Assistant • PPP specific rules • Annotations • Exchange of annotations on dossiers • Transfer of annotations to a more recent version of a dossier • Filtering of confidential information • Light Update Dossier • Indicate Latest Dossier Version • Full Dossier PDF Generation • Search improvements • Reports • DAR, RAR, Confidentiality claims report, Notification of Studies report (for manual validation checks) • API documentation improvements • Improved REST API and IUCEF API documentation for 3rd party system-integration • 8

  9. ECHACS Features Authority and Public IUCLID instances for EFSA • Large DB support • Special access control • Submission Portal • Support of PPP submission types (validation, data-extraction) • PPP specific submission report • Submitting large dossiers • E.g.: Possible timeout issue, resuming upload, transferring the file first and importing in the • background Routing PPP dossiers to EFSA Authority IUCLID large instance • Authority view of submissions • Access to failed submissions (that weren’t sent to EFSA instances) • List of pesticides submissions accessible by EFSA • API for Event log integration • 3 rd party systems can be informed of what is happening / been submitted etc. • 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.