Pike Place Market, PC 1 North June 28, 2012 Guiding Principles To guide design and future development of PC1N site and participate constructively as a stakeholder in the city's Waterfront Concept Designs, the PDA Council has adopted a set of


slide-1
SLIDE 1

Pike Place Market, PC‐1 North

June 28, 2012

slide-2
SLIDE 2

2

Guiding Principles

Guiding Principles

  • Pedestrian Access and

Neighborhood Connectivity

  • Vehicle Access
  • PC1N Priority Uses
  • Character and Identity
  • Views
  • 24/7 –

365 Activation

  • Financial Viability
  • Preservation and

Sustainability

To guide design and future development of PC1N site and participate constructively as a stakeholder in the city's Waterfront Concept Designs, the PDA Council has adopted a set of Guiding Principles for PC1N and adjacent areas west extending to Alaskan Way and the Waterfront

slide-3
SLIDE 3

3

PC1-N Priority Uses

1.

  • 1. Parking

Parking –loss of 130 spaces from surface lots and need to preserve as many of the existing 81 spaces as possible. 2.

  • 2. Storage

Storage –Cold storage and dry storage is chronically in short supply. Key component in retention and recruitment of farmers, crafters, restaurants and businesses.

  • 3. Commercial/Residen
  • 3. Commercial/Residential Acti

tial Activation tion –Financial support for development and maintenance of PC1N could include commercial and/or residential activation along the edges. activating space along Western, new space facing the Waterfront and integrating with the Desimone bridge consistent with historic plans and concepts. 4.

  • 4. Soci

Social Ser al Servi vices ces – Many social services in the Market have adequate space to support their mission including the Senior Center, Pre-School and Childcare and Medical Clinic. The Foodbank, while operating successfully, faces ongoing challenges with access and space. Could improve access to the Foodbank and consider possible relocation and expansion.

  • 5. Programs
  • 5. Programs

–Provide opportunities to expand and support components of core programs including farming, education and busking will greatly aid in the successful activation of new public space created between the Market and the Waterfront.

slide-4
SLIDE 4

4

PC1‐N General Building Program

  • Support and enhance the Market’s core mission, functions and character, consistent with

historical uses for PC1N and adjacent areas as part of Central Waterfront redevelopment

  • Improve Market pedestrian connections to and from the Central Waterfront through the

PC1N site

  • Develop the PC1N site to its maximum potential for serving core Market mission and

functions

  • Remain consistent with Market Historic Commission Guidelines
  • Include the following general uses:
  • Retail
  • Residential
  • Replacement parking
  • Storage
  • Social Services
  • Public Space
  • Circulation and Pedestrian Passage

December 15 December 15th

th, 2011

, 2011 RESOLUTION 11- RESOLUTION 11- 102 102: : PC1-North Preliminary Building Program

slide-5
SLIDE 5

5

PC1‐N Site Analysis

slide-6
SLIDE 6

6

slide-7
SLIDE 7

7

slide-8
SLIDE 8

8

Next Steps – Summer 2012

  • Identify Preferred Design Option and Direction
  • Establish Market/Community Stakeholder group to assist with refinement of

Preferred Design Option

  • Continue to refine PC1‐N Design working with Stakeholders and Waterfront

Partners

  • Continue Development of Plans and Program with Miller Hull as lead Architects for

the Market and PC1N

  • Finalize Negotiation of MOU with the City
  • Outline partner responsibilities
  • Establish rough cost estimates/Financing scenarios and options
  • Timeline and phasing
  • Ownership of PC‐1 North
slide-9
SLIDE 9

9

Next Steps ‐ Key Dates

  • July 26, 2012

‐ Select Preferred Design Option and review draft financial plan

  • July 12, 2012
  • final Waterfront Framework presented City of Seattle and City Council on
  • August 2012

‐ Review final draft financial plan

  • Early – Mid September 2012

– City council approval of MOU

  • September 27, 2012

– Approve next phase of Miller Hull work including final design development – plan and construction documents.

  • Fall 2012

‐ Begin process for selecting General Contractor

  • 2013

– Finalize designs, develop plans and construction documents

  • Mid ‐

2014 ‐ Mobilize for construction Phase 1 – Parking Replacement

slide-10
SLIDE 10

Options Summary

D

slide-11
SLIDE 11

Option A Summary

slide-12
SLIDE 12

Option B Summary

slide-13
SLIDE 13

Option C Summary

slide-14
SLIDE 14

Option D Summary

slide-15
SLIDE 15

Option BB – Massing Limitations

slide-16
SLIDE 16

Option BB – Massing Limitations

slide-17
SLIDE 17

Option BB – Massing Limitations

slide-18
SLIDE 18

Option BB – Massing Limitations

slide-19
SLIDE 19

Option BB – Massing Limitations

slide-20
SLIDE 20

Option BB – Massing Limitations

slide-21
SLIDE 21

Option BB – Massing Limitations

slide-22
SLIDE 22

Option BB – Massing Limitations

slide-23
SLIDE 23

Option BB – Massing Limitations

slide-24
SLIDE 24

Option BB – Massing Limitations

slide-25
SLIDE 25

Option BB ‐ Birdseye looking South

slide-26
SLIDE 26

Option BB– Summary

slide-27
SLIDE 27

Option BB – Massing Limitations

slide-28
SLIDE 28

Option BB+ ‐ Birdseye looking South

slide-29
SLIDE 29

Option BB+ plans and area

slide-30
SLIDE 30

Options

Option BB Option BB+

slide-31
SLIDE 31

View from Desimone Bridge Stair Landing

Proposed 13,700 sf of Public View from Desimone Bridge Terrace. Additional 12,400 sf of lower terrace Public View Area. 26,100 sf Total Existing stair landing (64 sf) View

slide-32
SLIDE 32

Virginia St. Pavilion View

Option BB Option BB+

slide-33
SLIDE 33
slide-34
SLIDE 34

Option BB – Cooling tower stack relocation

slide-35
SLIDE 35

Terrace Case Studies

slide-36
SLIDE 36

Terrace Case Studies

slide-37
SLIDE 37

Terrace Case Studies

slide-38
SLIDE 38

Terrace Case Studies

slide-39
SLIDE 39

Terrace Case Studies

slide-40
SLIDE 40

Terrace Case Studies

slide-41
SLIDE 41

Terrace Case Studies

slide-42
SLIDE 42

Terrace Case Studies

slide-43
SLIDE 43

Terrace Case Studies