physics plans and machines in germany
play

Physics Plans and Machines in Germany Major Collaborations and - PowerPoint PPT Presentation

Physics Plans and Machines in Germany Major Collaborations and places in Germany: BMW: J ulich, Wuppertal CLS: Berlin, Mainz, M unster, Zeuthen ETMC: Berlin, Hamburg, M unster, Zeuthen QCDSF: Berlin, Hamburg, Leipzig, M


  1. Physics Plans and Machines in Germany Major Collaborations and places in Germany: • BMW: J¨ ulich, Wuppertal • CLS: Berlin, Mainz, M¨ unster, Zeuthen • ETMC: Berlin, Hamburg, M¨ unster, Zeuthen • QCDSF: Berlin, Hamburg, Leipzig, M¨ unchen, Regensburg, Zeuthen • RBG: Darmstadt, Bielefeld

  2. Physics • BMW: – Thermodynamics (Wuppertal and Budapest) – T=0 Physics (Budapest-Marseille-Wuppertal) • CLS – K-, charm- and B-physics – fundamental parameters – Muon anomalous magnetic moment – Hadron form factors • QCDSF and ETMC: very similar and broad physics plans, e.g. – Structure functions, form factors and generalised parton distribution functions of baryons and mesons – Distribution Amplitudes of baryons and mesons – Disconnect contributions – Muon anomalous magnetic moment – Resonances – Hadron mass spectrum, decay constants, quark masses, running coupling • RBC-Bielefeld-GSI: – Non-zero temperature and density – Equation of State

  3. Some results from Germany 2000 O X * 1500 S * X M[MeV] D S L 1000 N K* r experiment 500 K width QCD p 0 2.4 3/2 φ RGI r 0 2.2 3/2 F B s m B s 1/2 / C B s r 0 2 3/2 F PS m PS 1/2 / C PS r 0 1.8 1.6 1.4 1.2 1 0.8 0.6 0 0.05 0.1 0.15 0.2 0.25 0.3 1/(r 0 m PS )

  4. Simulation Plans Action: Symanzik improved gauge BMW stout improved N f = 2 + 1 staggered and (clover) Wilson Parameters a � 0.065fm, m π � 190 MeV QCDSF Action: N f = 2 NP-Clover m π = 138MeV, a ≈ 0 . 075 fm, V = 64 3 96 Parameters: Plan: N f = 2 + 1 SLiNC m π = 230MeV, a = 0 . 08 fm, V = 64 3 96 , SU(3) point Parameters: Configurations: all ensembles uploaded Action: N f = 2 + 1 + 1 , maximally tmQCD, Iwasaki gauge ETMC Parameters: a = 0 . 05 − 0 . 10 fm, L ≈ 3 . 0 fm, 150 < m π < 400 MeV Configurations: all ensembles uploaded CLS Action: N f = 2 , NP O(a)-improved Parameters: a = 0 . 04 − 0 . 08 fm, L � 4 . 0 fm, m π � 200 MeV Action: asqtad and p4 RBG Parameters: N τ = 6 , 8 , 12 , m π ≈ 150 MeV and m π ≈ 220 MeV

  5. Supercomputer Infrastructure • NIC 72 racks of BG/P System at FZ-J¨ ulich 1 Petaflops • 4416 Nehalem processor Cluster computer: 208 Teraflops • Altix System at LRZ Munic 62 Teraflops • SGI Altix ICE 8200 at HLRN (Berlin, Hannover) 241 Teraflops • QPACE 4+4 Racks in J¨ ulich und Wuppertal 2000 PowerXCell 8i nodes 200 TFlops • University machines, e.g. University of Mainz: 280 nodes Dual Quadcore AMD Barcelona + Infiniband, 21 TFlops

  6. ILDG Enthusiasm Collaboration ILDG BMW open CLS open ETMC YES QCDSF YES RBG open

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend