Oteley Road South, Shrewsbury Phase 1 Infrastructure Works 21 st June 2016 www.farrans.com Contents Scope of Works along Oteley Road Proposed Traffic Management Programme of Works Phase 1 Farrans Community Liaison


  1. Oteley Road South, Shrewsbury – Phase 1 Infrastructure Works 21 st June 2016 www.farrans.com

  2. Contents • Scope of Works along Oteley Road • Proposed Traffic Management • Programme of Works – Phase 1 • Farrans Community Liaison www.farrans.com

  3. Scope of Works - Phase 1 • Two new access junctions to Oteley Road • On site earthworks, including Sustainable Urban Drainage ponds • Approx. 1500m of foul water sewer from Shrewsbury Town FC to proposed site entrance • Approx. 500m of surface water drainage sewer from Sutton Grange to proposed site entrance • New service connections including BT, electricity and gas www.farrans.com

  4. Foul and Surface Water Sewers Surface Water Drainage Sewer Foul Water Sewer www.farrans.com

  5. Proposed Traffic Management • Oteley Road will be closed to west bound traffic from the junction of Wenlock Road to entrance of the Shrewsbury Town Football Club. • A diversion route which will be clearly signposted will be via the A458, A5 and the A5112 Hereford Road. • Local access for residents will be maintained. • Traffic Management due to be set up on the evening of the 20 th June www.farrans.com

  6. Proposed Traffic Management www.farrans.com

  7. Proposed Traffic Management Proposed Diversion Route www.farrans.com

  8. Programme of Works • 20 th June – 18 th July: Lane closure for sewer installation along Oteley Road. • 18 th July – 5 th September: No traffic management on Oteley Road , works within grass verge installing ducting for services will continue with no effect on traffic flow • 5 th Sept – 3 rd Oct: Traffic management using temporary traffic lights to complete sewer installation www.farrans.com

  9. Farrans Community Liaison • We will complete this work as efficiently and swiftly as possible to minimise disruption. We apologise in advance for any inconvenience caused and would like to thank you for your patience and understanding. • Working hours will be as follows: • Within Oteley Road: Monday – Saturday 7am – 11pm, Sunday 9am – 11pm • Within the development site: Monday-Friday 7:30am-6pm, Saturday 8am-1pm • Farrans 24 hour Help Line: 02890 393 636 ( quote project number 38004 ) www.farrans.com

  10. Questions? www.farrans.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.