Oteley Road South, Shrewsbury Phase 1 Infrastructure Works 21 st June 2016 www.farrans.com Contents Scope of Works along Oteley Road Proposed Traffic Management Programme of Works Phase 1 Farrans Community Liaison


slide-1
SLIDE 1

www.farrans.com

Oteley Road South, Shrewsbury – Phase 1 Infrastructure Works

21st June 2016

slide-2
SLIDE 2

www.farrans.com

Contents

  • Scope of Works along Oteley Road
  • Proposed Traffic Management
  • Programme of Works – Phase 1
  • Farrans Community Liaison
slide-3
SLIDE 3

www.farrans.com

Scope of Works - Phase 1

  • Two new access junctions to Oteley Road
  • On site earthworks, including Sustainable Urban Drainage ponds
  • Approx. 1500m of foul water sewer from Shrewsbury Town FC to

proposed site entrance

  • Approx. 500m of surface water drainage sewer from Sutton Grange

to proposed site entrance

  • New service connections including BT, electricity and gas
slide-4
SLIDE 4

www.farrans.com

Foul and Surface Water Sewers

Surface Water Drainage Sewer Foul Water Sewer

slide-5
SLIDE 5

www.farrans.com

Proposed Traffic Management

  • Oteley Road will be closed to west bound traffic from the junction of

Wenlock Road to entrance of the Shrewsbury Town Football Club.

  • A diversion route which will be clearly signposted will be via the

A458, A5 and the A5112 Hereford Road.

  • Local access for residents will be maintained.
  • Traffic Management due to be set up on the evening of the 20th

June

slide-6
SLIDE 6

www.farrans.com

Proposed Traffic Management

slide-7
SLIDE 7

www.farrans.com

Proposed Traffic Management

Proposed Diversion Route

slide-8
SLIDE 8

www.farrans.com

Programme of Works

  • 20th June – 18th July: Lane closure for sewer installation along

Oteley Road.

  • 18th July – 5th September: No traffic management on Oteley

Road, works within grass verge installing ducting for services will continue with no effect on traffic flow

  • 5th Sept – 3rd Oct: Traffic management using temporary traffic lights

to complete sewer installation

slide-9
SLIDE 9

www.farrans.com

Farrans Community Liaison

  • We will complete this work as efficiently and swiftly as possible to minimise
  • disruption. We apologise in advance for any inconvenience caused and

would like to thank you for your patience and understanding.

  • Working hours will be as follows:
  • Within Oteley Road: Monday–Saturday 7am– 11pm, Sunday 9am–

11pm

  • Within the development site: Monday-Friday 7:30am-6pm, Saturday

8am-1pm

  • Farrans 24 hour Help Line: 02890 393 636 (quote project number 38004)