(PE C) S FO R A LL YO UR INSPEC TIO N NEED S DACON INSPE CT ION - - PowerPoint PPT Presentation

pe c
SMART_READER_LITE
LIVE PREVIEW

(PE C) S FO R A LL YO UR INSPEC TIO N NEED S DACON INSPE CT ION - - PowerPoint PPT Presentation

PUL SE D E DDY IO N SERVIC ES DAC O N INSEPEC T CURRE NT (PE C) S FO R A LL YO UR INSPEC TIO N NEED S DACON INSPE CT ION SE RVICE Who we ar e Co nve ntio na l a nd Oil a nd Ga s, Re fine ry, Ove r 400 pe rso nne l T ha ila nd he


slide-1
SLIDE 1

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

DAC O N INSEPEC T IO N SERVIC ES

PUL SE D E DDY CURRE NT

(PE C)

slide-2
SLIDE 2

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

Who we ar e

Co nve ntio na l a nd Adva nc e d NDT a nd Inspe c tio n Se rvic e s Oil a nd Ga s, Re fine ry, Pe tro c he mic a l, He a vy Industry, Mining Ove r 400 pe rso nne l inc luding mo re tha n 300 inspe c to rs T ha ila nd he a dq ua rte rs with Inte rna tio na l e xpe rtise sinc e 1979

slide-3
SLIDE 3

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

T hic kne ss re a ding s thro ug h c o a ting s a nd insula tio n E le c tro ma g ne tic te c hniq ue fo r me a suring the thic kne ss o f ste e l o b je c ts suc h a s pipe a nd ve sse ls E ddy Curre nt se nso r is pla c e d o n to p o f the the rma l insula tio n Ma g ne tic fie ld g e ne ra te d in the ma te ria l By me a suring the dura tio n fo r e ddy c urre nt to “de c a y” a re fe re nc e to the thic kne ss o f the ma te ria l c a n b e ma de .

slide-4
SLIDE 4

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Pr inc iple

slide-5
SLIDE 5

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

  • Ma g ne tic pulse se nt o ut
  • E

ddy Curre nts g e ne ra te d in the (pe rme a b le ) ma te ria l

  • E

ddy c urre nts g e ne ra te a ma g ne tic fie ld o f the ir o wn, a ffe c ting the re c e ive r c o il

slide-6
SLIDE 6

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT 2 3

PE C signal

1

  • While pe ne tra ting the ma te ria l the e ddy c urre nts g e t we a ke r a nd de c a y
  • Whe n the E

ddy c urre nts hit the b a c k wa ll a sudde n dro p in E ddy c urre nt stre ng th ta ke s pla c e

  • T

he time o f b e twe e n the first pulse a nd whe n this sudde n dro p o ff ta ke s pla c e is a me a sure fo r the thic kne ss o f the ma te ria l

slide-7
SLIDE 7

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Applic a tio ns:

  • CUI
  • I

nsula te d Piping

  • I

nsula te d Ve sse ls

  • I

nsula te d T a nks

  • Hig h te mp a pplic a tio ns
  • Surfa c e s c o ve re d b y ma rine g ro wth
  • Offsho re rise rs
  • Ca isso ns
  • Po rt struc ture s, ste e l she e t piling
  • Ship hulls
  • Co mpo site wra p re pa ire d a re a s
  • Be hind c o nc re te fire pro o fing
  • Sphe re le g s
  • Ve sse l skirts
  • Bo ile rs
  • Co nc re te c o a te d pipe s
  • Po we r pla nt piping (F

lo w Ac c e le ra te d Co rro sio n, F AC)

slide-8
SLIDE 8

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Applic a tio n e xa mple : Sphe re le g s

slide-9
SLIDE 9

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Applic a tio n e xa mple : CUI

  • Piping
  • T

a nks

  • Ve sse ls
slide-10
SLIDE 10

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Applic a tio n e xa mple : Offsho re Rise rs/ Ca isso ns

slide-11
SLIDE 11

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Applic a tio n e xa mple : Sub se a a pplic a tio ns

slide-12
SLIDE 12

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Ca pa b ilitie s

  • Hig h te mpe ra ture no c o nc e rn (-100 to 550 De g re e s C)
  • 3-35 mm thic kne ss
  • Pipe dia me te r 3” to fla t
  • L

ift o ff ra ng e 0-200 mm (up to 200 mm insula tio n

  • Ac c ura c y +/ - 10%
  • Me a sure thro ug h Aluminum a nd SS she e ting
  • Re sults hig hly re pe a ta b le , suita b le fo r c o rro sio n mo nito ring
slide-13
SLIDE 13

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Disadvantage s

  • Can only be use d on fe r

r

  • - magne tic mate r

ials

  • Me asur

e s var iations in wall thic kne ss within an obje c t, not absolute thic kne ss

  • Can’t me asur

e thr

  • ugh galvanize d she e te d insulation
  • Small isolate d c or

r

  • sion pits c an be misse d.
  • Me asur

e s the ave r age wall thic kne ss ove r the footpr int of the pr

  • be
  • De pe nds on size of pr
  • be and amount of lift off
slide-14
SLIDE 14

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Re po rting

slide-15
SLIDE 15

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

PUL SE D E DDY CURRE NT

Re por ting

slide-16
SLIDE 16

DACON INSPE CT ION SE RVICE S

FO R A LL YO UR INSPEC TIO N NEED S

How Can We He lp?

Contac t

E ma il : info @ d a c o n-inspe c tio n.c o m Pho ne : +66 (0) 33 012 484-7

www.dac on- inspe c tion.c om