PAVEMENT PRESERVATION SHRINKING THE FUNDING GAP Objectives Be tte - - PowerPoint PPT Presentation
PAVEMENT PRESERVATION SHRINKING THE FUNDING GAP Objectives Be tte - - PowerPoint PPT Presentation
PAVEMENT PRESERVATION SHRINKING THE FUNDING GAP Objectives Be tte r unde r stand our c ur r e nt funding c halle nge Curre nt T re nds o Shortfa ll o Ide ntify things we c an do now to de c r e ase our funding shor tfall
Objectives
- Be tte r
unde r stand our c ur r e nt funding c halle nge
- Curre nt T
re nds
- Shortfa ll
- Ide ntify things we c an do now to de c r
e ase our funding shor tfall
- Pa ve me nt Pre se rva tion
- T
he 3R’s
- Outside F
unding Sourc e s
- Disc uss our
- ngoing e ffor
ts to c ontinue to impr
- ve
- ur
de c ision making
- Improve me nt History Da ta ba se
Cost History
2017 $70 / Ton 2005 $35 / Ton
Revenue Trend
- T
ypic al Impr
- ve me nt (1 Mile L
- ng, 20’ Wide )
- Mill E
xisting Pa ve me nt ($1.50/ SY)
- 5% Pa ve me nt Are a - Ba se Re pa irs ($200/ CY)
- 0.75” Ho t Mix L
e ve ling Co urse ($70/ T ON)
- 1.25” Surfa c e Co urse ($70/ T
ON)
$130,000 / mile
Cost of a Typical Pavement Improvement Project
Life Expectancy of a Typical Pavement Improvement Project
- Diffic ult to Pr
e dic t with Ce r tainty
- E
xisting Ro a ds - Va ry in Co nditio n
- Diffe re nt I
mpro ve me nt – Va ry in L ife E xpe c ta nc y
- Va rying o pinio ns/ inte rpre ta tio ns o f “fa ile d”
- Industr
y standar ds will give r ange s to e xpe c t
- Ofte n the se will b e ske we d to wa rd who is
pre se nting the da ta
- Combining our
histor ic al knowle dge & industr y standar ds 14 Ye ar s
Annual Projected Cost
$130,000 / Mile / 14 Ye ar s $9,300/ Mile / Ye ar County Syste m – Appr
- ximate ly 162 Mile s
$9,300/ Mile / Ye ar x 162 Mile s = $1,506,600/ Ye ar 1.5 Million / Ye ar Cur r e nt Annual OOP Roadway Budge t = ± $700,000 Annual Shor tfall = $800,000
Township #’s
Townships Township $ / Mile / Year Road Miles $ / Year Allen $8,370 41 $343,170 Bay $8,370 13 $108,810 Benton $8,370 41 $343,170 Carroll $8,370 39 $326,430 Catawba $8,370 13 $108,810 Clay $8,370 44 $368,280 Danbury $8,370 16 $133,920 Erie $8,370 7 $58,590 Harris $8,370 38 $318,060 Portage $8,370 13 $108,810 Put-In-Bay $8,370 13 $108,810 Salem $8,370 35 $292,950
Possible Solutions
- Mo re Mo ne y
- L
e ss Ro a d Mile a g e
- Re alistic Str
ate gie s We Can Contr
- l
- Pa ve me nt Pre se rva tio n
- Outside F
unding
- T
he 3 R’ s
Pavement Preservation
- Pave me nt Pr
e se r vation ac tivitie s e xte nd the se r vic e life of a r
- adway asse t in a c ost e ffe c tive manne r
.
- Most c ommon pre se rva tion tre a tme nts inc lude
- Chip Se a l (Sing le or Double ) ± $3,200 / mile / ye a r (Sing le )
- Ca pe Se a l ± $5,100 / mile / ye a r
- Mic rosurfa c ing ± $6,700 / mile / ye a r
- T
hinla y ± $7,500 / mile / ye a r
Pavement Condition
Pavement Life
Chip Seal As Preservation Tool
- T
ypic al T ar , Chip & F
- g L
ife – 7 Ye ar s
- T
ypic al T ar , Chip & F
- g Cost - $22,000 / Mile
- Applie d at ye ar
12
New Annual Projected Cost
$152,000 / Mile / 19 Ye ar s $8,000/ Mile / Ye ar County Syste m – Appr
- ximate ly 162 Mile s
$8,000/ Mile / Ye ar x 162 Mile s = $1,296,000/ Ye ar 1.3 Million / Ye ar Cur r e nt Annual OOP Roadway Budge t = ± $700,000 Annual Shor tfall = $600,000 $800,000
Outside Funding (OPWC/Issue II)
- Annual F
unding Pr
- gr
am (August)
- L
- c al Pr
- je c ts (T
- wnships, County E
ngine e r s, Munic ipalitie s, Sanitar y E ngine e r ’s, E tc .)
- Pr
- je c ts ar
e r anke d ac c or ding to a sc or ing syste m
- We work with the townships to put the m in the be st situa tion to re c e ive
funding .
- T
his is a r e oc c ur r ing, pr e dic table funding sour c e
- T
ypic al awar de d pr
- je c t would r
e c e ive up to 50% Gr ant F unding
Issue II Impact
- L
e ts assume we r e c e ive funding e ve r y othe r ye ar and ar e awar de d $300,000 on ave r age $150,000 / Ye ar $800,000 Annual Shor tfall = $450,000 $600,000
What else can we do???
- F
- c us on the 3 R’s.
- T
he Rig ht T re a tme nt
- On the Rig ht Roa d
- At the Rig ht T
ime
- As your
e ngine e r you r e ly he avily on our advic e
- Wha t a re we doing to c ontinue to try a nd ma ke the be st de c isions we
c a n?
- We wa nt to be on the hig h e nd of the life e xpe c ta nc y ra ng e
Road Improvement History
- We have r
e c or ds of the paving histor y on e ve r y r
- ad
- Wha t wa s done
- How long it la ste d
- How muc h it c ost a t the time of c onstruc tion
- We have 12 ye ar
s of pave me nt c ondition r ating data
- How do we utilize this infor
mation???
Conclusion
- F
- c us on e xte nding the life pave me nts
- Be pr
- ac tive in your
pur suit of outside funding
- We will c ontinue to wor
k to impr
- ve our
de c ision making T he se things toge the r c an make a diffe r e nc e