PAVEMENT PRESERVATION SHRINKING THE FUNDING GAP Objectives Be tte - - PowerPoint PPT Presentation

PAVEMENT PRESERVATION SHRINKING THE FUNDING GAP Objectives Be tte r unde r stand our c ur r e nt funding c halle nge Curre nt T re nds o Shortfa ll o Ide ntify things we c an do now to de c r e ase our funding shor tfall


slide-1
SLIDE 1

PAVEMENT PRESERVATION

SHRINKING THE FUNDING GAP

slide-2
SLIDE 2

Objectives

  • Be tte r

unde r stand our c ur r e nt funding c halle nge

  • Curre nt T

re nds

  • Shortfa ll
  • Ide ntify things we c an do now to de c r

e ase our funding shor tfall

  • Pa ve me nt Pre se rva tion
  • T

he 3R’s

  • Outside F

unding Sourc e s

  • Disc uss our
  • ngoing e ffor

ts to c ontinue to impr

  • ve
  • ur

de c ision making

  • Improve me nt History Da ta ba se
slide-3
SLIDE 3

Cost History

2017 $70 / Ton 2005 $35 / Ton

slide-4
SLIDE 4

Revenue Trend

slide-5
SLIDE 5
  • T

ypic al Impr

  • ve me nt (1 Mile L
  • ng, 20’ Wide )
  • Mill E

xisting Pa ve me nt ($1.50/ SY)

  • 5% Pa ve me nt Are a - Ba se Re pa irs ($200/ CY)
  • 0.75” Ho t Mix L

e ve ling Co urse ($70/ T ON)

  • 1.25” Surfa c e Co urse ($70/ T

ON)

$130,000 / mile

Cost of a Typical Pavement Improvement Project

slide-6
SLIDE 6

Life Expectancy of a Typical Pavement Improvement Project

  • Diffic ult to Pr

e dic t with Ce r tainty

  • E

xisting Ro a ds - Va ry in Co nditio n

  • Diffe re nt I

mpro ve me nt – Va ry in L ife E xpe c ta nc y

  • Va rying o pinio ns/ inte rpre ta tio ns o f “fa ile d”
  • Industr

y standar ds will give r ange s to e xpe c t

  • Ofte n the se will b e ske we d to wa rd who is

pre se nting the da ta

  • Combining our

histor ic al knowle dge & industr y standar ds 14 Ye ar s

slide-7
SLIDE 7

Annual Projected Cost

$130,000 / Mile / 14 Ye ar s $9,300/ Mile / Ye ar County Syste m – Appr

  • ximate ly 162 Mile s

$9,300/ Mile / Ye ar x 162 Mile s = $1,506,600/ Ye ar 1.5 Million / Ye ar Cur r e nt Annual OOP Roadway Budge t = ± $700,000 Annual Shor tfall = $800,000

slide-8
SLIDE 8

Township #’s

Townships Township $ / Mile / Year Road Miles $ / Year Allen $8,370 41 $343,170 Bay $8,370 13 $108,810 Benton $8,370 41 $343,170 Carroll $8,370 39 $326,430 Catawba $8,370 13 $108,810 Clay $8,370 44 $368,280 Danbury $8,370 16 $133,920 Erie $8,370 7 $58,590 Harris $8,370 38 $318,060 Portage $8,370 13 $108,810 Put-In-Bay $8,370 13 $108,810 Salem $8,370 35 $292,950

slide-9
SLIDE 9

Possible Solutions

  • Mo re Mo ne y
  • L

e ss Ro a d Mile a g e

  • Re alistic Str

ate gie s We Can Contr

  • l
  • Pa ve me nt Pre se rva tio n
  • Outside F

unding

  • T

he 3 R’ s

slide-10
SLIDE 10

Pavement Preservation

  • Pave me nt Pr

e se r vation ac tivitie s e xte nd the se r vic e life of a r

  • adway asse t in a c ost e ffe c tive manne r

.

  • Most c ommon pre se rva tion tre a tme nts inc lude
  • Chip Se a l (Sing le or Double ) ± $3,200 / mile / ye a r (Sing le )
  • Ca pe Se a l ± $5,100 / mile / ye a r
  • Mic rosurfa c ing ± $6,700 / mile / ye a r
  • T

hinla y ± $7,500 / mile / ye a r

slide-11
SLIDE 11

Pavement Condition

Pavement Life

slide-12
SLIDE 12

Chip Seal As Preservation Tool

  • T

ypic al T ar , Chip & F

  • g L

ife – 7 Ye ar s

  • T

ypic al T ar , Chip & F

  • g Cost - $22,000 / Mile
  • Applie d at ye ar

12

slide-13
SLIDE 13

New Annual Projected Cost

$152,000 / Mile / 19 Ye ar s $8,000/ Mile / Ye ar County Syste m – Appr

  • ximate ly 162 Mile s

$8,000/ Mile / Ye ar x 162 Mile s = $1,296,000/ Ye ar 1.3 Million / Ye ar Cur r e nt Annual OOP Roadway Budge t = ± $700,000 Annual Shor tfall = $600,000 $800,000

slide-14
SLIDE 14

Outside Funding (OPWC/Issue II)

  • Annual F

unding Pr

  • gr

am (August)

  • L
  • c al Pr
  • je c ts (T
  • wnships, County E

ngine e r s, Munic ipalitie s, Sanitar y E ngine e r ’s, E tc .)

  • Pr
  • je c ts ar

e r anke d ac c or ding to a sc or ing syste m

  • We work with the townships to put the m in the be st situa tion to re c e ive

funding .

  • T

his is a r e oc c ur r ing, pr e dic table funding sour c e

  • T

ypic al awar de d pr

  • je c t would r

e c e ive up to 50% Gr ant F unding

slide-15
SLIDE 15

Issue II Impact

  • L

e ts assume we r e c e ive funding e ve r y othe r ye ar and ar e awar de d $300,000 on ave r age $150,000 / Ye ar $800,000 Annual Shor tfall = $450,000 $600,000

slide-16
SLIDE 16

What else can we do???

  • F
  • c us on the 3 R’s.
  • T

he Rig ht T re a tme nt

  • On the Rig ht Roa d
  • At the Rig ht T

ime

  • As your

e ngine e r you r e ly he avily on our advic e

  • Wha t a re we doing to c ontinue to try a nd ma ke the be st de c isions we

c a n?

  • We wa nt to be on the hig h e nd of the life e xpe c ta nc y ra ng e
slide-17
SLIDE 17

Road Improvement History

  • We have r

e c or ds of the paving histor y on e ve r y r

  • ad
  • Wha t wa s done
  • How long it la ste d
  • How muc h it c ost a t the time of c onstruc tion
  • We have 12 ye ar

s of pave me nt c ondition r ating data

  • How do we utilize this infor

mation???

slide-18
SLIDE 18

Conclusion

  • F
  • c us on e xte nding the life pave me nts
  • Be pr
  • ac tive in your

pur suit of outside funding

  • We will c ontinue to wor

k to impr

  • ve our

de c ision making T he se things toge the r c an make a diffe r e nc e

slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21

Thank You

Que stions? Comme nts?