PASSIVE HOUSE: Building Inherent Value Owner/Developer: Homeowners Rehab FINCH CAMBRIDGE 98 affordable family units Opening April 1 2020 Surge in Interest in Passive House in MA Fall 2018: Mass CEC Passive House Design Incentives


slide-1
SLIDE 1

PASSIVE HOUSE: Building Inherent Value

slide-2
SLIDE 2

FINCH CAMBRIDGE

  • Owner/Developer: Homeowners Rehab
  • 98 affordable family units
  • Opening April 1 2020
slide-3
SLIDE 3
  • Fall 2018: Mass CEC Passive House Design Incentives
  • 8 Passive House Affordable Projects (543 units)
  • Summer 2019: MassSave Passive House Incentives:
  • 540 units (28 Buildings) Have Applied Many

communities requiring or heavily encouraging Passive House as part of special permit process

  • Municipal Policy Shifts:
  • Toward Net Zero and/or All-Electric

Surge in Interest in Passive House in MA

slide-4
SLIDE 4

Passive House Performance

slide-5
SLIDE 5

What Does Successful Execution Require?

Builder as Partner: Attention to the CRAFT of building

slide-6
SLIDE 6

Communication/Collaboration

slide-7
SLIDE 7

Graphic Communication

slide-8
SLIDE 8

Graphic Communication

slide-9
SLIDE 9

Field Communication

The right amount of information at the right time

slide-10
SLIDE 10

Craft – Envelope Airtightness Continuity

Caio’s Team rocking the Air Barrier

slide-11
SLIDE 11

Not Approved Approved

Craft – Envelope Airtightness Continuity

slide-12
SLIDE 12

Craft – Envelope Thermal Continuity

slide-13
SLIDE 13

Sequence

slide-14
SLIDE 14

Craft – Interior Compartmentalization

Not Approved Approved

slide-15
SLIDE 15

Craft: Pipe/Penetration Airtightness

Ian Russell - Plumber First Try – Not Approved Second Try –Approved

slide-16
SLIDE 16

Craft: Pipe/Penetration Insulation

slide-17
SLIDE 17

Testing/Verification

slide-18
SLIDE 18

T he r mal Imaging – Pr e / Post C.I.

slide-19
SLIDE 19

Commissioning/Monitoring

Architect: ICON Architecture MEP/FP: Petersen Engineering GC: NEI General Contracting – (CPHC added to team) Energy Modeler & CPHC : Linnean Solutions PH Verifier: JSR Adaptive Energy Solutions Sustainability Consultant: New Ecology Envelope Consultant: Building Enclosure Associates Commissioning Agent: Sustainable Engineering Solutions

You are not alone – we are a team