Our needs constantly changing . The Human spirit always on the move - - PowerPoint PPT Presentation

our needs constantly changing
SMART_READER_LITE
LIVE PREVIEW

Our needs constantly changing . The Human spirit always on the move - - PowerPoint PPT Presentation

Time is changing Our needs constantly changing . The Human spirit always on the move Tradition ways are good but not for build houses New Ideas To serve humanity New ideas for countrys vision CONTENTS THINK GREEN page


slide-1
SLIDE 1
slide-2
SLIDE 2

Time is changing … Our needs constantly changing …. The Human spirit always on the move Tradition ways are good …but not for build houses New Ideas …To serve humanity New ideas for country’s vision

slide-3
SLIDE 3

THINK GREEN page Introduction to Betolock System 3 Patents from WIPO Betolock System principals Implementation Stages Advantages & Examples Projects in Europe /Greece What we can build

CONTENTS

slide-4
SLIDE 4

INTRODUCTION

slide-5
SLIDE 5

The PREFABRICATION SYSTEM from EUROPE / GREECE -Called B.P.S – has a CERTIFICATE that issued directly from the GOVERNMENT AUTHORITY that named INDUSTRIAL PROPERTY ORGANIZATION (O.P.I), based in GREECE. The B.P.S took a DIPLOMA from O.P.I of 3 PATENTS about:

  • 1. Precast Buildings from concrete - PATENT Number: ……6326

With International Classification: E04B 1/04, E04B 2/00, EO4B 1/41 (Volume 3 / Section E -Fixed Constructions-E04 Buildings) This Diploma of Patent is valid till: 09-06-2027

  • 2. Ceiling slabs of prefabricated concrete buildings- PATENT Number :….6262

With International Classification: B28B 7/16, B28B 23/02 (Volume 1 / Section B -Performing Operations -B28 Working Cement) This Diploma of Patent is valid till: 09-06-2027

  • 3. Method and system of building construction- PATENT Number: ….6313

With International Classification: E04B 1/48 (Volume 3 / Section E -Fixed Constructions-E04 Buildings) This Diploma of Patent is valid till: 24-03-2025 These 3 PATENTS / the B.P. System, receive also a CERTIFICATE OF ASSESSMENT From the EUROPEAN QUALITY ASSESSMENT HELLAS , that has established And applies a QUALITY MANAGEMENT SYSTEM which is in conformance with ELOT EN ISO 9001:2000 The certificate of Conformity Number: 2082, first issued on :26 March 2007

A SYSTEM FROM EUROPE/GREECE

slide-6
SLIDE 6

PROCEDURE FOR INTERNATIONAL PATENT -P.T.C and W.I.P.O For international patent filing based on the International Cooperation Treaty, known as P.C.T (Patent Cooperation Treaty), by depositing a single application, the depositor may request the grant of a patent in any of the Member States of the above-mentioned treaty. *(W.I.P.O-World Intellectual Property Organization). Following GCC -MENA Countries & Dates that join WIPO:

  • Saudi Arabia -is a Member since May ,03 2013
  • UAE -is a Member since March ,10 1999
  • Jordan -is a Member since June ,09 2017
  • Kuwait -is a Member since September ,09 2016
  • Bahrain -is a Member since March ,18 2007 -Article 64(5).
  • Qatar -is a Member since August 03,2011
  • Oman -is a Member since October 26,2001
  • Morocco- is a Member since October 08, 1999
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14
slide-15
SLIDE 15

STUDYING A HOUSE HANDOVER TO OWNER

slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
  • B.P.S Holds 3 World Patents, which make it unique against other systems.
  • Full supported with its computer software for preparation of elements.
  • Can support whatever Architecture designs (Design Flexibility).
  • Doesn’t need A Factory. Everything is done on the site.
  • Doesn’t need transports which means less time and money to spend.
  • No cracks, no visible joints, no gaps. Nothing can pass after locked it.
  • After the project finished you load everything, and moved away.
  • The technology that we use allow us to provide Green Buildings.
  • No needing for any Scaffolding system during erection.
  • The ending result leaves the House ready for start finishes.
  • Minimize garbage’s to the volume of one skip per house.
  • It’s completely under Earthquake protection (Eurocode 8).
  • Can support any Structural study from Engineering office.
  • The M / E elements are embedded during concrete casting.
  • Perfectly isolated according to the SASO requirement’s.
  • Supporting Basement construction for garage purpose.
  • Construction of Swimming Pool also can be supported.

A SUMMARY-WHY WE ARE DIFFERENT

slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22
slide-23
SLIDE 23
slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33

WHAT BUIDLINGS WE CAN SUPPORT

slide-34
SLIDE 34
slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39

THANK YOU

‘Time is changing … Our needs constantly changing …. The Human spirit always on the move Tradition ways are good …but not for build houses’

New Ideas …To serve humanity New ideas for country’s vision