Our company was established in 2002 We developing concepts and - - PowerPoint PPT Presentation
Our company was established in 2002 We developing concepts and - - PowerPoint PPT Presentation
Our company was established in 2002 We developing concepts and advise Designing Estimating cost Instaling & programing We service From conception to implementation Fire alarm system SAP Voice alarm system DSO
- We developing concepts and advise
- Designing
- Estimating cost
- Instaling & programing
- We service
Our company was established in 2002
From conception to implementation
- Fire alarm system SAP
- Voice alarm system DSO
- Gravitional smoke removal system
- Ventilation control system
- Extinguishing control sytem
- Fireproof systems of installation transition
- Immunization of buildings construction
- Telecommunication instalations LAN, CCTV,
SSWiN+KD and other applicable in public buildings
- Esser – IQ8 Control
- Bosch Security System (SAP FPA 5000,
DSO Praesideo, Plena)
- ADI International – SAP Algorinet, DSO Sinaps
- Siemens – Synova, Algorex
- ADT – SAP Zettler, DSO Audix
- GE Interlogix – FAP
- Polon Alfa - SAP Polon seria 4000
- D+H i Mercor
- Ambient System – Schrack, Venas
Buildings safety
QUALIFICATIONS AND TRAINING
REALIZED INVESTMENTS
PGE ARENA GDAŃSK POLAND STADIUM ON EURO 2012
design and construction of a comprehensive fire protection - fire alarm system SAP, Voice Alarm System DSO, smoke ventilation systems and staircases gravity control
Hotel "D" ARKA-MEGA Kolobrzeg Poland
Hotel used as the headquarters of the Danish football team during championship Euro 2012
REFERENCE
I hereby give reference letter JANROM company based in Gdansk Brylantowa Street 2-3. Company Janrom performed for our low-current systems, fire protection systems - fire alarm, voice alarm system and burglar alarm system. These installations have been performed at the Old Brewery Kosciuszko Street in Poznan. The Company has complied with its scope was exemplary despite numerous changes in decision-making on the part of the investor and documentation discrepancies. The Company has prepared a fire alarm system to the building management together with BMS and BMS contractor led to the
- verall acceptance of works.
CD i DN in Szczecin
Bosch FPA 500 + control, LAN, CCTV, automatic.
PAZIM Sp. z o.o. Plac Rodła 8, 70-419 Szczecin
We prepared project and assembly fire resistant seals and installation transition on the border of fire zones to the order of main contractor ERBUD S.A. Szczecin ul. Mostnika 22.
Doll Theater „PLECIUGA” Szczecin, Plac Teatralny 1
We prepared executive project and implemented : SAP, CCTV, SSWiN and LAN with telephone exchange. We also made hardening of building steel construction by fire retardant paint and fire-resistant seal of transitions and joints at the borders zones of fire commissioned by main contractor ERBUD S.A. Szczecin, ul. Mostnika 22. Despite of difficulties during investor reception( by ECE SA Warszawa) Our company completed work without fault.
ARKADA Office Poznań, Obornicka Street 229 –
We prepared executive project and electromagnetic installation (transformer station, switching SN 15kV, switching NN, automatic SZR) and all low voltage installations (fire alarm system, CCTV, structural network, anti-theft system). Commissioned by main contractor ERBUD S.A. Poznań department.
Shopping Gallery CH TURZYN Szczecin
Museum of Technology Szczecin
fire alarm system Esser, CCTV, LAN, system intrusion and other
Shopping Gallery PIAST Szczecin
gravity smoke extraction in the roof
Petrobaltic Gdańsk
Fire Alarm System Bosch FPA 5000 + automatic control
- HORIZON Gdańsk Przymorze apartment - design and
construction of fire-resistant sealing system passages fire zones on the border on behalf of the main contractor EKOLAN SA Gdynia, ul. Wielkokacka 2nd
Covered market „Pod Wieżą” in Słupsk
Project, assembly and starting the notification system of the fire with assembly of gates and fire- fighting door steered by anti-fire system , smoke removal system and acoustic alarm system
Jantar Gallery in Słupsk
FAS Esser i VAS Bosch Preasideo
help in execution
Paulinum Palace in Jelenia Góra
FAS Sagitta 100 + automatic control
Apollo Residence
in Karpacz
FAS Sagitta 100 + automatic control
Hotel Rejs w Ustce
FAS Bosch FPA 5000 + automatic control Alma Market Sopot ul. Sikorskiego 8-10 – SAP Polon
4000; projekt i wykonanie uszczelnień
- gnioodpornych przejść instalacyjnych na
granicy stref pożarowych na zlecenie głównego wykonawcy IXO Serwis 47-200, Kędzierzyn - Koźle, Piastowska 40.
Regional Hospital in Slupsk fireproof sealing sanitary
Sanatorium Centre Klimczok
Ustronie Morskie FAS Bosch FPA 5000
Aquapark FALA
Łodź FAS Bosch FPA 5000 + gravity smoke extraction
State Higher Vocational School Elbląg
FAS Polon Alfa + gravity smoke extraction
Sanatorium Centre Natura Tour Radość Ustka
- design and implementation of a comprehensive
fire protection - fire alarm system FAS Bosch FPA5000, VAS Voice Alarm System.Bosch
Hotel „Wodnik” Łeba
FAS Polon 4000 - design and implementation of a comprehensive fire protection
Northern Shipyard Gdańsk D+H Smoke Control
Seaport customs clearance in Elblag - making comprehensive fire protection systems. and CCTV, burglar alarm system and access control systems - installation and commissioning
Elementary School Gym Lidzbark Warminski Fire hardening steel structure
We train and improve
- urselves
We train and improve
- urselves