Op Oper eration
- nal
Ch Challe allenges to EW EW e effecti ectiven enes ess
Air Mshl Daljit Singh PVSM AVSM VM (Retd) Indian Air Force
Op Oper eration onal Ch Challe allenges to EW EW e effecti - - PowerPoint PPT Presentation
Op Oper eration onal Ch Challe allenges to EW EW e effecti ectiven enes ess Air Mshl Daljit Singh PVSM AVSM VM (Retd) Indian Air Force Sequence Flashback Technological Advances Present Scenario Current Developments
Air Mshl Daljit Singh PVSM AVSM VM (Retd) Indian Air Force
Neptune
Germany- Night fighters, AAA
4/2/20 3
ECCM followed.
ARM
inducted
Jammer
10 times.
4 4/2/20
5
SAM 6,Schilka & SA 7
time
tactics
Schilka to develop tactics.
4/2/20
campaign
COMJAM deployed
6
4/2/20
7 4/2/20
8 4/2/20
10
Bottom line Modular, Scalable, open system architecture. Upgraded Datalinks. Multispectral Capability
4/2/20
ASSM(ER),SCALP/ STORM SHADOW SPICE
11 4/2/20
array of arrows
12 4/2/20
4/2/20 14
band EW systems .
Architecture
forecast $30 Billion between 2018-2028.
indigenization and Collaborative Production
judicious operational concepts.
15
4/2/20