Mechanical Completion and Commissioning Services by MCCS INTERNATIONAL
www.mccsinternational.com
MCCS-GN-PS-002 03
on Mechanical Completion and Commissioning Services by MCCS - - PowerPoint PPT Presentation
A Presentation on Mechanical Completion and Commissioning Services by MCCS INTERNATIONAL www.mccsinternational.com MCCS-GN-PS-002 03 PRESENTATION BREAKDOWN MCCS INTERNATIONAL A brief Introduction on MCCS International ( MCCS )
www.mccsinternational.com
MCCS-GN-PS-002 03
► Mechanical Completion and Commissioning Services Ltd. Formed in 1994 To fill a niche market in the area of Mechanical Completion and Commissioning ► M.C.C.S. Worldwide Ltd. Formed 2000 in the UK ► M.C.C.S. Worldwide Sdn Bhd Formed 2001 Kuala Lumpur Malaysia and renamed to M.C.C.S. International Sdn Bhd 2007 ► Branch Offices in UK, Spain and South Korea What makes M.C.C.S. unique? M.C.C.S. comprises a team of people who have specialised in this difficult area for over 23 years. The principle spin off from this team approach is “The Wheel is not Reinvented” Maximise cost benefits M.C.C.S. involvement should be sought during the early planning and design phase of a project. Within schedule and under budget M.C.C.S. team has an enviable record of achieving its tasks within schedule and under budget.
MCCSI-KL-GN-OC-001 R01
CHAIRMAN
MANAGING DIRECTOR GENERAL MANAGER
PRE-COMMISSIONING & COMMISSIONING MANAGER PRE-COMMISSIONING MANAGER N2/He LEAK TESTING FLANGE MANAGEMENT HYDROTEST MACHINING COMMISSIONING MANAGER MULTI DISCIPLINE COMMISSIONING & MAINTENANCE PLANNING COMPLETION SYSTEM ENGINEERING HSE MANAGER FINANCE DEPARTMENT HUMAN RESOURCE (HR) DOCUMENT CONTROL CENTER (DCC) PROJECT OPERATION BUSINESS DEVELOPMENT PROPOSAL ENGINEERING PROJECT SITE SUPPORT WAREHOUSE (WMS) ADMIN DEPARTMENT QMS
COMPANY SECRETARY
Engineering Procurement Construction Commissioning Operation & Maintenance
Basic Eng. Detailed Eng.
Procurement P Construction
Pre-comm. - Preparation Pre-comm.-Execution
Commissioning - Preparation
Equipment Population Precom - Preparation
Com - Preparation Punch List A Punch List B Com - Execution Punch list C
STARTUP
Execution RFC
By Sub System
MECH COMP RFSU
By Sub System
RFHO
OPERATIONS
The required preparation for:
Including: ➢ Identification of Systems and Sub Systems ➢ Loading of all technical information into software database ➢ Provision of check lists and test sheets ➢ Creation of level 1 to level 4 plans including networks (CPN) and critical paths ➢ Provision of pre commissioning procedures ➢ Provision of commissioning procedures ➢ Agreement on punch list control and management methods ➢ Compiling RFC/RFSU/RFHO dossiers based on systems and sub-systems
Engineering Procurement Construction Commissioning Operation & Maintenance
MCCS has the capability to ensure systems are clean prior to start up. This includes: ➢ Camera internal inspections ➢ Chemical Cleaning ➢ High velocity flushing ➢ Lube oil systems flushing and Analysis. ➢ Steam blowing ➢ Air Blowing ➢ Drying
Engineering Procurement Construction Commissioning Operation & Maintenance
MCCS will provide joint and connection integrity which will ensure a Leak Free start up of the plant. This will be by :
Breach Lock Exchangers
PRE-ENGINEERING: ➢ joint register ➢ preparation of work packs ➢ data sheets ➢ data records ➢ joint completion certificate (jcc) ➢ Exchanger work pack preparation. (MCCS and Sealing and Bolting Technolgies LLC have joined forces in providing the engineering and on site expertise for the breach lock exchangers and other specialist heat exchangers) PREPARATION AND INSPECTION: ➢ line walking ➢ flange alignment, surface and cleanliness ➢ fasteners materials and cleanliness ➢ gasket materials and cleanliness
Following the Flange Management and the Cleaning processes MCCS has the in house requirements to perform sensitive leak testing as a form of verification prior to start up. This also ensures the complete plant is inerted safely prior to start up.
PHASE ACTIVITIES MILESTONE
PRE-COMMISSIONING CONFORMITY CHECKS STATIC TESTING N2/He LEAK TESTING (MC & RFC) MECHANICAL COMPLETION
Engineering Procurement Construction Commissioning Operation & Maintenance
❑ PRE-COMMISSIONING EXECUTION PHASE (MULTIDISCIPLINE) ✓ Visual inspection of Equipment ( Instruments, Motors, Cables...).Quality of installation Compliance with Project Specifications , Safety rules, codes,... ✓« Cold Testing » : Calibration of Instruments, Machinery alignment , Setting of safety valves,...(De-energised Tests) ✓Chemical Cleaning & Lube Oil Flushing
One Dossier Per Sub-System
Combined RFC Certificate
PHASE ACTIVITIES MILESTONE
COMMISSIONING READY FOR START-UP (RFSU) ENERGISATION DYNAMIC TESTS EQUIPMENT RUNNING-IN PRESTART-UP ACTIVITIES
Engineering Procurement Construction Commissioning Operation & Maintenance
❑ COMMISSIONING EXECUTION PHASE ✓ Electrical motors coupled runs , instrument loop testing , electrical breakers operation ....... ✓Running-in and on-line tests of plant utilities, and main process equipment in closed loop (wherever applicable) ✓Piping and Vessels N2/He Leak Testing (Mainly Hydro-carbon Systems) ✓ Start-Up Assistance ✓Company / Client Assistance and support following successful Start Up.
One Dossier Per Sub-System
Provision of a team to assist in routine, preventive & shutdown maintenance including : ➢ Electrical ➢ Telecoms ➢ Instruments ➢ Mechanical (Fixed and Rotating)
Engineering Procurement Construction Commissioning Operation & Maintenance
Preservation and Maintenance of the equipment and systems can be managed and performed by MCCS during the project duration from Equipment delivery through to the start up of each
systems and procedures. This would include the preparation planning and provision of all hand tools and equipment, engineers & technicians (electrical, instrument, mechanical and piping)by MCCS Consumables can be provided by MCCS or Client depending on Client preference.
➢ Improving completion of remaining 1,500 + subsystems ➢ Dedicated team focused on Completion / Turnover process ➢ Free up area based teams to improve performance guiding their PC’s ➢ Construction completion on more predictable schedule and documentation ➢ Form support Team to expedite systems from bulk construction to full completion and turnover ➢ Mission statement for Support Team ➢ Drive subsystems/systems across the Completion finish line ➢ Complete any and all work not done or documented by PC’s ➢ Support precommissioning and then commissioning /operations after completion