November 2018 Fontana sulfide gossan FORWARD LOOKING STATEMENTS - - PowerPoint PPT Presentation
November 2018 Fontana sulfide gossan FORWARD LOOKING STATEMENTS - - PowerPoint PPT Presentation
November 2018 Fontana sulfide gossan FORWARD LOOKING STATEMENTS Certain information contained in this presentation constitutes forward looking statements, which include without limitation, statements relating to the market conditions for gold,
2
Certain information contained in this presentation constitutes forward looking statements, which include without limitation, statements relating to the market conditions for gold, the activities and results of gold and other resource companies, results relating to Tres-Or’s properties and planned exploration programs. Forward-looking statements are based on the reasonable opinions and estimates of the management of Tres-Or and are subject to a variety of risks, uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved in the exploration and development of the mineral properties, uncertainties involved in the interpretation of drill results and
- ther geological data, fluctuating commodity prices, unforeseen permitting requirements, changes in the environmental laws or
regulations, the possibility of project cost overruns or unanticipated costs and expenses, weather conditions, aboriginal land claims, the availability of contractors for equipment and services, the availability of future financing and general business and economic
- conditions. Such statements are also based on a number of assumptions which may prove to be incorrect including assumptions
about general business and economic conditions, public information including pertaining to other issuers, being accurate, the timing and receipt of regulatory approvals for projects and operations, the availability of financing, the ability to secure equipment and labour, and Tres-Or’s ongoing relationship with third parties. The foregoing factors, risks and assumptions are not exhaustive. Events
- r circumstances could cause actual events or results to differ materially form those estimated or projected and expressed in, or
implied by, these forward–looking statements. Accordingly, readers should not place undue reliance on forward-looking statements. These forward statements are as of the date they are made and Tres-Or disclaims any obligation to update any forward-looking statements, except as required by law.
FORWARD LOOKING STATEMENTS
3
Noranda > 18M oz. LaRonde > 8M oz. Malartic > 10M oz. Val d’Or > 20M oz.
Fontana Gold Project
TRES-OR RESOURCES – FONTANA GOLD PROJECT
Fontana $500,000 drill program ready to extend high-grade intersections
in
Zone 27
(e.g. 114 g/t Au over 0.9 m; 58.4 g/t Au over 1.8 m)
and
Hooper-Bunkhouse
(e.g. 17.5 g/t Au over 38.1 m and 17.1 g/t Au over 13.7 m)
4 TRES-OR RESOURCES – FONTANA GOLD PROJECT
5 TRES-OR RESOURCES – FONTANA GOLD PROJECT
Fontana $500,000 drill program ready to extend high-grade intersections
in
Zone 27
(e.g. 114 g/t Au over 0.9 m; 58.4 g/t Au over 1.8 m)
and
Hooper-Bunkhouse
(e.g. 17.5 g/t Au over 38.1 m and 17.1 g/t Au over 13.7 m)
15
“A” “B”
NE NE SW SW
“A” “B”
Schematic section
interpreted >0.2 g/t Au shell (light blue) and >10.0 g/t Au shell (red).
Hooper- Bunkhouse Zone 27
Fontana Zone 27: #1 Priority target for $500,000 drill program – winter 2019
Extend and demonstrate continuity between high-grade intervals (red circles)
8
Hooper – Bunkhouse Fontana Hooper-Bunkhouse zone: Tres-Or’s 4 hole drill program winter 2017
9 FONTANA GOLD - HOOPER ZONE DRILL CORE
10 FONTANA GOLD – BUNKHOUSE ZONE DRILL CORE
11 FONTANA GOLD – BULK SAMPLES
12
Bunkhouse Fontana shear
Hooper Toughie
Laddie
shaft
Voxels >0.5 g/t Au Map view
N
500 m
>0.5 g/t < 1.0 g/t Au Volume = 16 million m3
3D voxel model – Fontana all drill holes
- pen at depth and on Bunkhouse (NE)
and Fontana (NW) trends
13
Bunkhouse
Fontana shear
Map view Voxels > 1.0 Au
Hooper Toughie
shaft
N
500 m
> 1.0 g/t Au < 5.0 g/t Au Volume = 11 million m3
3D voxel model – Fontana all drill holes
- pen at depth and on Bunkhouse (NE)
and Fontana (NW) trends
Bunkhouse
Fontana shear
Hooper Toughie
shaft
(no bulk samples)
N
500 m
Voxels > 5.0 g/t Au Map view
> 5.0 g/t Au Volume = 1.7 million m3
3D voxel model – Fontana all drill holes
- pen at depth and on Bunkhouse (NE)
and Fontana (NW) trends
14
Fontana 3D voxel model - based on assays from 300+ drill holes
(most drill holes only partially sampled)
3D model – all voxels
>0.5 g/t Au Cross section SW to NE
SW NE
(330º)
Voxel 3D model cross sections
3D model – all voxels
>1.0 g/t Au Cross section SW to NE
SW NE
(330º)
Fontana 3D voxel model - based on assays from 300+ drill holes
(most drill holes only partially sampled)
Voxel 3D model cross sections
3D model – all voxels
>2.0 g/t Au Cross section SW to NE
SW NE
(330º)
Voxel 3D model cross sections
3D model – all voxels
>5.0 g/t Au Cross section SW to NE
SW NE
(330º)
Fontana 3D voxel model - based on assays from 300+ drill holes
(most drill holes only partially sampled)
Voxel 3D model cross sections
16
Tres-Or’s Guigues Kimberlite pipe:
- Mineral chemistry comparable to De
Beers’ world class Victor Diamond Mine
- Never been tested by modern
microdiamond methods
- Substantial size (5 to 7+ hectares)
- Very good access and infrastructure
- Tres-Or has a long-term working relations
with the Timiskaming First Nations
20 DIAMOND ASSETS – ADDITIONAL SHAREHOLDER VALUE
Tres-Or is preparing to complete 5 drill holes for the first microdiamond tests covering all phases of the Guigues Kimberlite pipe The Company is actively pursuing potential opportunities to spin out its Diamond Assets to create additional shareholder value
21 INDUSTRY COMPARABLES
Tres-Or’s current valuation is lower than other explorers active in the province
$3 $5 $14 $34 $36 $43 $14 $27 $38 $68 $69 $110
MARKET CAPITALIZATION (C$M)
Tres-Or vs. Other Explorers Active in Quebec - Market Capitalization (C$M)
Projects without Mineral Resources Projects with Mineral Resources
22 KEY TAKEAWAYS
- 8700 hectare property in the heart of the prolific Abitibi gold camp
- Advanced project, significantly de-risked with +300 core holes drilled and 22,000 tonne bulk
sample completed Past work demonstrates potential for high grades as well as open cut mining Number of prospects/targets generated after consolidation and analysis of extensive historic database Undervalued in relation to peers - potential to create value as newly defined targets are tested with upcoming drilling program
- Quebec – top tier mining friendly jurisdiction
- Infrastructure: Paved highway, hydro power and mining communities of Rouyn and Val d’Or