nova experiment status all experimenter s meeting
play

NOvA Experiment Status All Experimenters Meeting Jaroslav Zalesak, - PowerPoint PPT Presentation

NOvA Experiment Status All Experimenters Meeting Jaroslav Zalesak, FNAL/Institute of Physics, Prague Jun 6, 2016 Op Operation ons s Su Summary q BEAM: Waiting for 700kW with 6+6 slip stacking and antineutrino run. q NearDet: No


  1. NOvA Experiment Status All Experimenter’s Meeting Jaroslav Zalesak, FNAL/Institute of Physics, Prague Jun 6, 2016

  2. Op Operation ons s – Su Summary q BEAM: — Waiting for 700kW with 6+6 slip stacking and antineutrino run. q NearDet: — No issues during last 2 weeks. — Preparing for the maintenance and planning of noise lowering to make the RHC data taking as much effective as possible. q FarDet: — A water leak! — Short timing issue (glitch in TDU). — Thunder storm season ongoing, a power glitch occurred. q Collaboration: week @ Argonne, asked for box opening for the Second analysis results, preparing for summer conferences. — Discussion about beam summer shutdown tasks. 2 Jaroslav Zalesak - NOvA Phone Meeting 6/6/16

  3. FD: : Water L Leak Ø Forgotten brass fitting (on APD water hose) caused the water leak May 27 at 8pm. Ø 7.5 h down time to isolate, search and unplugged damaged electronics parts, Ø And of course recovery the detector. Ø Down times for replicating (12 FEBs + 2 APDs) and take new DSO scans and HV settings. 3 Jaroslav Zalesak -AEM 6/6/16

  4. FD: : Data t taking U Uptime Power glitch WATER LEAK TDU/TCR Repairs of Timing issue damaged No beam parts Maintenance Ø 92.4%, 98.8% (4w 96.9%) Ø The main issue was the water leak Fri/Sat and its recovery. Ø Other down times for replacing damaged parts, we were 6h with one diblock excluded. Ø And the thunder storm season caused one short power glitch on Sun. 4 Jaroslav Zalesak -AEM 6/6/16

  5. FD: : POTs d delivered/recorded 93.2 % 100% 100 % 99.2 % Ø 4week average 97.9%, last weeks we took 13.22 of 13.33 and 13.56 of 14.55 e18 POTs. Ø Since second analysis cut-off we took 60+e18 POTs more. Ø Big beam losses correspond to the water leak and power glitch at Ash River site. 5 Jaroslav Zalesak -AEM 6/6/16

  6. FD: : Accumulated POTs – al all year ars Ø FY2014: 280/326 e18 POTs (86%) + FY2015: 298.5/312.5 *) e18 POTs (95.5%) [253days] Ø FY2016: 346.2/359.2 e18 POTs (96.1%) [210 days] *) Including 20.8e18 POTs horn-off data and 2.6e18 non-nominal horn current data. Ø Total beam exposure of FD reached 0.998 e21 POTs (not weighted). 6 Jaroslav Zalesak -AEM 6/6/16

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.