NOvA Experiment Status All Experimenters Meeting Jaroslav Zalesak, - - PowerPoint PPT Presentation

nova experiment status all experimenter s meeting
SMART_READER_LITE
LIVE PREVIEW

NOvA Experiment Status All Experimenters Meeting Jaroslav Zalesak, - - PowerPoint PPT Presentation

NOvA Experiment Status All Experimenters Meeting Jaroslav Zalesak, FNAL/Institute of Physics, Prague Jun 6, 2016 Op Operation ons s Su Summary q BEAM: Waiting for 700kW with 6+6 slip stacking and antineutrino run. q NearDet: No


slide-1
SLIDE 1

Jaroslav Zalesak, FNAL/Institute of Physics, Prague Jun 6, 2016

NOvA Experiment Status All Experimenter’s Meeting

slide-2
SLIDE 2

q BEAM:

— Waiting for 700kW with 6+6 slip stacking and antineutrino run.

q NearDet:

— No issues during last 2 weeks. — Preparing for the maintenance and planning of noise lowering

to make the RHC data taking as much effective as possible.

q FarDet:

— A water leak! — Short timing issue (glitch in TDU). — Thunder storm season ongoing, a power glitch occurred.

qCollaboration: week @ Argonne, asked for box opening for the

Second analysis results, preparing for summer conferences.

— Discussion about beam summer shutdown tasks.

6/6/16 Jaroslav Zalesak - NOvA Phone Meeting 2

Op Operation

  • ns

s – Su Summary

slide-3
SLIDE 3

6/6/16 Jaroslav Zalesak -AEM 3

FD: : Water L Leak

Ø Forgotten brass fitting (on APD water hose) caused the water leak May 27 at 8pm. Ø 7.5 h down time to isolate, search and unplugged damaged electronics parts, Ø And of course recovery the detector. Ø Down times for replicating (12 FEBs + 2 APDs) and take new DSO scans and HV settings.

slide-4
SLIDE 4

6/6/16 Jaroslav Zalesak -AEM 4

FD: : Data t taking U Uptime

Ø 92.4%, 98.8% (4w 96.9%) ØThe main issue was the water leak Fri/Sat and its recovery. Ø Other down times for replacing damaged parts, we were 6h with one diblock excluded. Ø And the thunder storm season caused one short power glitch on Sun. No beam Maintenance TDU/TCR Timing issue Repairs of damaged parts WATER LEAK Power glitch

slide-5
SLIDE 5

6/6/16 Jaroslav Zalesak -AEM 5

FD: : POTs d delivered/recorded

Ø 4week average 97.9%, last weeks we took 13.22 of 13.33 and 13.56 of 14.55 e18 POTs. Ø Since second analysis cut-off we took 60+e18 POTs more. Ø Big beam losses correspond to the water leak and power glitch at Ash River site. 100 % 93.2 % 100% 99.2 %

slide-6
SLIDE 6

6/6/16 Jaroslav Zalesak -AEM 6

FD: : Accumulated POTs – al all year ars

Ø FY2014: 280/326 e18 POTs (86%) + FY2015: 298.5/312.5*) e18 POTs (95.5%) [253days] Ø FY2016: 346.2/359.2 e18 POTs (96.1%) [210 days]

*) Including 20.8e18 POTs horn-off data and 2.6e18 non-nominal horn current data.

Ø Total beam exposure of FD reached 0.998 e21 POTs (not weighted).