Nottingham/Kirkwood Area Reconstruction Meeting Carol Haddock, P.E., Senior Asst. & Interim Deputy Director AGENDA 1 OVERVIEW OF THE PROJECT 2 NEXT STEPS 3 CONTACT INFORMATION 2 Nottingham/Kirkwood Area Reconstruction Examples of


slide-1
SLIDE 1

Nottingham/Kirkwood Area Reconstruction Meeting

Carol Haddock, P.E., Senior Asst. & Interim Deputy Director

slide-2
SLIDE 2

1

OVERVIEW OF THE PROJECT

2

NEXT STEPS

3

CONTACT INFORMATION

AGENDA

2

slide-3
SLIDE 3

Pavement /Mobility

Nottingham/Kirkwood Area Reconstruction

Examples of Current Conditions

3

Drainage & Mobility Pavement /Drainage

slide-4
SLIDE 4

Improve water and wastewater as needed

Nottingham/Kirkwood Area Reconstruction

Identified Improvement Needs

Pedestrian safety and accessibility Improve storm drainage

4

Improve pavement conditions and mobility Improve existing bike lanes

slide-5
SLIDE 5

Nottingham/Kirkwood Area Reconstruction

M-000247 Project Area : Memorial to Britoak (just south of Katy Fwy)

5

LEGEND

TREE TO REMAIN EXISTING RIGHT-OF-WAY (ROW) 5’ SIDEWALK TREE TO BE REMOVED NEW MEDIAN EXISTING MEDIAN PAVEMENT

KIRKWOOD Memorial Britoak Kimberley

(Intersection)

slide-6
SLIDE 6

Nottingham/Kirkwood Area Reconstruction

Intersection: Kimberley at Kirkwood

6

LEGEND

TREE TO REMAIN EXISTING RIGHT-OF-WAY (ROW) 5’ SIDEWALK TREE TO BE REMOVED NEW MEDIAN REPLACED SIGNAL EXISTING MEDIAN PAVEMENT

slide-7
SLIDE 7

Nottingham/Kirkwood Area Reconstruction

Proposed Cross Section: Kirkwood North of Memorial

7

slide-8
SLIDE 8

Nottingham/Kirkwood Area Reconstruction

Proposed Cross Section: Woodthorpe from Carlingford to West Forest

8

slide-9
SLIDE 9

CURRENT CIP PART I / IN DESIGN PANEL REPLACEMENT PROJECT

Nottingham/Kirkwood Area Reconstruction

Improvements to Existing Bike Lanes

9 MEMORIAL DRIVE BUFFALO BAYOU BRIAR FOREST DRIVE WESTHEIMER ROAD

NOTTINGHAM/KIRKWOOD CIP PROJECT CURRENT CIP PART II

  • Existing bike lane is 2’ in width

and considered substandard

  • Increase comfort level by

introducing a 5’ bike lane and a 3’ buffer

  • Striped/painted bike lane and

buffer allows for street sweeping and maintenance

  • Striped/painted bike lane and

buffer allows for street sweeping and maintenance

  • Substandard facilities are

not considered safe, and will not be restriped along portions of the corridor not programmed with the CIP project we are discussing

  • today. To learn more, please

visit the Houston Bike Plan.

  • When funding is received,

PWE will need to move the curb in this area to update the bike facility KIRKWOOD ROAD

  • 6’ bike lane
  • r 5’bike lane

with a 2’ painted buffer

  • 6’ bike lane or 5’ bike lane

with a 2’ painted buffer

slide-10
SLIDE 10

Nottingham/Kirkwood Area Summary

Improve pavement conditions and mobility Improve storm drainage

10

Sidewalks and ramps to meet ADA Standards Improve existing bike lanes Improve water and wastewater as needed

slide-11
SLIDE 11

2013 Planning (Complete) 2016 Design (Ongoing) 2018 Scheduled Construction 2020 Anticipated Completion

11

Timeline subject to change

Next Steps: Nottingham/Kirkwood Area – Phase I

slide-12
SLIDE 12

ReBuild Houston Goals

Reduce impact of flooding Improve mobility Quality of life

12

slide-13
SLIDE 13

Future Construction Completed Construction Current Construction

www.RebuildHouston.org

13

slide-14
SLIDE 14

We Want Your Input

14

Or email us your comments at: pweplanning@houstontx.gov www.RebuildHouston.org Fill out a comment card tonight

We Want Your

Or email us your comments at: Fill out a comment card tonight

YOUR INPUT BY

July 19, 2016

WILL HELP US STAY ON SCHEDULE