NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME - - PowerPoint PPT Presentation
NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME - - PowerPoint PPT Presentation
NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME Mid-Atlantic Regional Conference 10 OCT 07 Overview Deployment Overview Deployment Timeline Mission Organization Locations Deployment Highlights
Overview
- Deployment Overview
– Deployment Timeline – Mission – Organization – Locations
- Deployment Highlights
Deployment Summary:
- Advanced Party Deploys: 26 Jul 05
- Iraq MEF Support: 15 Aug 05 to 25 Nov 05
- CFLCC Support: 18 Nov 05 to 28 Feb 06
- Delayed Party Re-deploys: 28 Feb 06
20 6 16 2 19 5 21 7 17 3 19 5 15 1 18 4 20 6
Feb-06 Jan-06 Dec-05 Nov-05 Oct-05 Sep-05 Aug-05 Jul-05 Jun-05
Timeline for Deployment
CSE Training Iraq MEF Support CFLCC Support
Mission
– On 26 July 05, NMCB THREE will deploy a responsive, flexible general engineering / construction force with Convoy Security Element (CSE) capabilities. – Provide general engineering support to II MEF (FWD), ARCENT CFLCC, and JTF HOA.
COMMAND MASTER CHIEF STAFF Safety Officer Military Advisor CMAA OPS LCDR Stasick SUPPLY ADMIN TRAINING COMM OPS STAFF S3C – Ops Chief – S3E Engineering Off S3QC - – Quality Control S3A – Asst Ops SPECIAL STAFF X1 - Chaplain X2 - Dental X3 - Legal X4 - Medical CO XO CHARLIE COMPANY INTEL / WEAPONS MLO
Organization
BRAVO COMPANY ALFA COMPANY HQ COMPANY DETAILS MOBILITY COMPANY
Deployment Locations
Det PAPA Gulfport Det GTMO Det Andros Det Rota Det Souda Bay Kosovo IA Iraq Mainbody
CFLCC
- Camp Arifjan (MB)
- Camp Buehring
- Camp Virginia
- Ali Al Saleem
- Kuwait Naval Base
- K-Crossing
- Navistar
- Camp Victory
- Ash Shuaybah
Det Bahrain ABO/KAAOT OILPLAT Qatar IA Det Seychelles
Det Horn of Africa
- Camp Lemonier, Djibouti
- Adangalina, Djibouti
- Tadjura, Djibouti
- Nairobi, Kenya
- Manda Bay Kenya
- Harer, Ethiopia
- Hurso, Ethiopia
- Gode, Ethiopia
3 3
3 3 3 3 3 3 3 3 3 3
Iraq Deployment Highlights
- Camp Fallujah
– MHG Camp Maintenance – Pump House O & M – Election Support
- Ramadi \ Taquaddum
– Hardened Galley’s – SWA Hut Construction – Iraqi Security Force Camp – Timber Tower – Camp Maintenance
- Kalsu
– Electrical Upgrades – Dust Abatement Motor – Force Protection Improvements – Super SWA Huts in the RDF – MHG Camp Maintenance
- Al Asad
– Hardened Galley (CG) – Runway Joint Repair – ISF Camp Support – Coalition Forces FOB Construction
CENTCOM Laydown
3 U nite d S ta te s F lee t Fo rc e s U n ite d S ta te s Flee t F o rc e s O p e ra tio na l R ea d in e ss E ffe c tiv e n es s P rim a cy O p e ra tion a l R ea d in e ss E ffe c tiv e n es s P rim a cy
Al Asad NMCB 3 DET NMCB 22
Al Taqaddum
30 NCR DET NMCB 4 DET NMCB 22 DET
Al Fallujah
30 NCR NMCB 3 NMCB 22 DET
Korean Village
NMCB 22 DET
HOA (Djibouti)
NMCB 3 DET
Bahrain
NMCB 3 DET
Ar Ramadi
NMCB 3 DET NMCB 22 DET
Al Qaim
NMCB 22 DET
Rawah
NMCB 3 DET NMCB 22 DET Corregidor NMCB 3 DET
II MEF CJSOTF CJSOTF HOA HOA NAVCENT NAVCENT
30 NCR DET NMCB 3 DET NMCB 21 DET
Haditha
NMCB 22 DET Command Element
Kuwait
22NCR FWD NMCB 3 NMCB 21 DET
HOA (Ethiopia)
NMCB 3 DET
HOA (Kenya)
NMCB 3 DET Kalsu NMCB 3 DET
Hardened DFAC
Drainage Improvements Water Well, Camp Rawah
MEF Construction
Electrical Upgrades Runway Repairs, Al Asad Bridge Repair, Habbiniyah Timber Tower, Ar Ramadi SWAHut, TQ Comm Tower, Al Asad
ISF Base Camp
Convoy Security Teams
Camp Maintenance / Force Protection
KUWAIT IT CAN’T GET ANY BETTER THAN THIS!
Mission in Kuwait
- Setup Mainbody Site at Camp Arifjan
- Setup two Detail Camps
– Camp Virginia – Camp Buehring
- Completed 58 projects and over 22,596 mandays of
construction at 11 different locations
- 19 Projects partially completed and turned over to
NMCB SEVEN
- Active/Reserve integration
- Joint operations
Camp Virginia
- Manholes For Fiber Optic Cables
- Construct Base Roads
- PEB Sunshades
KCIA / APOD
- Bus and Convoy Route Upgrade
Ali Al Salem/Camp Moreell/Army LSA
- ECP Sun Shade
- USO Tent Improvements
- ATOC Briefing Room
Arifjan
- POL Fuel Transfer Yard PEB
- Concrete Loading Ramp
- Drainage Improvements
- Construct Secure Room
- TNOSC Pad Expansion
Camp Victory
- PX Construction
SPOD
- Construct Height Check Arch
- Redeployment Yard ICODE Prep
Navistar
- Southbound Lane Improvements
- South Immigration Lot Improvements
Camp Buehring
- ASP Site Prep
- ASR Dallas Improvements
- Erect 4 LAMS
- Erect 5 Sunshade PEBs
KNB
- Staging Yard improvements
- Concrete Loading Ramp
K Crossing
UNCLASSIFIED UNCLASSIFIED
Udairi Range
- South Road Repairs
- Road Maintenance
Kuwait Project Locations
Camp Arifjan
Ali Al Salem ECP Sunshade
Camp Virginia Utility Projects
Camp Virginia ECP Drainage/Road Repair
Camp Buehring LAMS
K-Crossing
- 2KM long border crossing
- Over 3,000 manday project
- 70,000 metric tons of asphalt
- 1,800 cubic meters of concrete
- Completed 38% of project
Det HOA
- Completed over 8,200 mandays of work at
8 different det sites stretched across three countries
- Drilled three water wells and repaired
another
- Rapid response to Nairobi building
collapse
- Completed a design/build boat ramp in
Kenya
Ea r t hwor k 14 % FOB S uppor t 2 % M i nor P r oj e c t s 8 % For c e P r ot e c t ion 2 % Ca mp S e t - up 15 % Ca mp M a i nt e na nc e 17 % P l umbi ng 3 % Wa t e r We l l s 3 % I nt e r i or Finish 7 % El e c t r ic a l 1% Fa br i c S t r uc t ur e s 1% M a sonr y S t r uc t ur e s 5 % Conc r e t e & P a v ing 5 % Wood S t r uc t ur e s 12 % M e t a l S t r uc t ur e s 5 %
Work Breakdown
Deployment Summary
- 112 Projects Completed
- 64,218 MD’s Completed
- Personnel Deployed to Iraq and Kuwait