NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME - - PowerPoint PPT Presentation

nmcb ops officer perspective
SMART_READER_LITE
LIVE PREVIEW

NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME - - PowerPoint PPT Presentation

NMCB Ops Officer Perspective Iraq/Kuwait Deployment Brief to: SAME Mid-Atlantic Regional Conference 10 OCT 07 Overview Deployment Overview Deployment Timeline Mission Organization Locations Deployment Highlights


slide-1
SLIDE 1

NMCB Ops Officer Perspective

Iraq/Kuwait Deployment

Brief to: SAME Mid-Atlantic Regional Conference 10 OCT 07

slide-2
SLIDE 2

Overview

  • Deployment Overview

– Deployment Timeline – Mission – Organization – Locations

  • Deployment Highlights
slide-3
SLIDE 3

Deployment Summary:

  • Advanced Party Deploys: 26 Jul 05
  • Iraq MEF Support: 15 Aug 05 to 25 Nov 05
  • CFLCC Support: 18 Nov 05 to 28 Feb 06
  • Delayed Party Re-deploys: 28 Feb 06

20 6 16 2 19 5 21 7 17 3 19 5 15 1 18 4 20 6

Feb-06 Jan-06 Dec-05 Nov-05 Oct-05 Sep-05 Aug-05 Jul-05 Jun-05

Timeline for Deployment

CSE Training Iraq MEF Support CFLCC Support

slide-4
SLIDE 4

Mission

– On 26 July 05, NMCB THREE will deploy a responsive, flexible general engineering / construction force with Convoy Security Element (CSE) capabilities. – Provide general engineering support to II MEF (FWD), ARCENT CFLCC, and JTF HOA.

slide-5
SLIDE 5

COMMAND MASTER CHIEF STAFF Safety Officer Military Advisor CMAA OPS LCDR Stasick SUPPLY ADMIN TRAINING COMM OPS STAFF S3C – Ops Chief – S3E Engineering Off S3QC - – Quality Control S3A – Asst Ops SPECIAL STAFF X1 - Chaplain X2 - Dental X3 - Legal X4 - Medical CO XO CHARLIE COMPANY INTEL / WEAPONS MLO

Organization

BRAVO COMPANY ALFA COMPANY HQ COMPANY DETAILS MOBILITY COMPANY

slide-6
SLIDE 6

Deployment Locations

Det PAPA Gulfport Det GTMO Det Andros Det Rota Det Souda Bay Kosovo IA Iraq Mainbody

CFLCC

  • Camp Arifjan (MB)
  • Camp Buehring
  • Camp Virginia
  • Ali Al Saleem
  • Kuwait Naval Base
  • K-Crossing
  • Navistar
  • Camp Victory
  • Ash Shuaybah

Det Bahrain ABO/KAAOT OILPLAT Qatar IA Det Seychelles

Det Horn of Africa

  • Camp Lemonier, Djibouti
  • Adangalina, Djibouti
  • Tadjura, Djibouti
  • Nairobi, Kenya
  • Manda Bay Kenya
  • Harer, Ethiopia
  • Hurso, Ethiopia
  • Gode, Ethiopia

3 3

3 3 3 3 3 3 3 3 3 3

slide-7
SLIDE 7

Iraq Deployment Highlights

  • Camp Fallujah

– MHG Camp Maintenance – Pump House O & M – Election Support

  • Ramadi \ Taquaddum

– Hardened Galley’s – SWA Hut Construction – Iraqi Security Force Camp – Timber Tower – Camp Maintenance

  • Kalsu

– Electrical Upgrades – Dust Abatement Motor – Force Protection Improvements – Super SWA Huts in the RDF – MHG Camp Maintenance

  • Al Asad

– Hardened Galley (CG) – Runway Joint Repair – ISF Camp Support – Coalition Forces FOB Construction

slide-8
SLIDE 8

CENTCOM Laydown

3 U nite d S ta te s F lee t Fo rc e s U n ite d S ta te s Flee t F o rc e s O p e ra tio na l R ea d in e ss E ffe c tiv e n es s P rim a cy O p e ra tion a l R ea d in e ss E ffe c tiv e n es s P rim a cy

Al Asad NMCB 3 DET NMCB 22

Al Taqaddum

30 NCR DET NMCB 4 DET NMCB 22 DET

Al Fallujah

30 NCR NMCB 3 NMCB 22 DET

Korean Village

NMCB 22 DET

HOA (Djibouti)

NMCB 3 DET

Bahrain

NMCB 3 DET

Ar Ramadi

NMCB 3 DET NMCB 22 DET

Al Qaim

NMCB 22 DET

Rawah

NMCB 3 DET NMCB 22 DET Corregidor NMCB 3 DET

II MEF CJSOTF CJSOTF HOA HOA NAVCENT NAVCENT

30 NCR DET NMCB 3 DET NMCB 21 DET

Haditha

NMCB 22 DET Command Element

Kuwait

22NCR FWD NMCB 3 NMCB 21 DET

HOA (Ethiopia)

NMCB 3 DET

HOA (Kenya)

NMCB 3 DET Kalsu NMCB 3 DET

slide-9
SLIDE 9

Hardened DFAC

slide-10
SLIDE 10

Drainage Improvements Water Well, Camp Rawah

MEF Construction

Electrical Upgrades Runway Repairs, Al Asad Bridge Repair, Habbiniyah Timber Tower, Ar Ramadi SWAHut, TQ Comm Tower, Al Asad

slide-11
SLIDE 11

ISF Base Camp

slide-12
SLIDE 12

Convoy Security Teams

slide-13
SLIDE 13

Camp Maintenance / Force Protection

slide-14
SLIDE 14

KUWAIT IT CAN’T GET ANY BETTER THAN THIS!

slide-15
SLIDE 15

Mission in Kuwait

  • Setup Mainbody Site at Camp Arifjan
  • Setup two Detail Camps

– Camp Virginia – Camp Buehring

  • Completed 58 projects and over 22,596 mandays of

construction at 11 different locations

  • 19 Projects partially completed and turned over to

NMCB SEVEN

  • Active/Reserve integration
  • Joint operations
slide-16
SLIDE 16

Camp Virginia

  • Manholes For Fiber Optic Cables
  • Construct Base Roads
  • PEB Sunshades

KCIA / APOD

  • Bus and Convoy Route Upgrade

Ali Al Salem/Camp Moreell/Army LSA

  • ECP Sun Shade
  • USO Tent Improvements
  • ATOC Briefing Room

Arifjan

  • POL Fuel Transfer Yard PEB
  • Concrete Loading Ramp
  • Drainage Improvements
  • Construct Secure Room
  • TNOSC Pad Expansion

Camp Victory

  • PX Construction

SPOD

  • Construct Height Check Arch
  • Redeployment Yard ICODE Prep

Navistar

  • Southbound Lane Improvements
  • South Immigration Lot Improvements

Camp Buehring

  • ASP Site Prep
  • ASR Dallas Improvements
  • Erect 4 LAMS
  • Erect 5 Sunshade PEBs

KNB

  • Staging Yard improvements
  • Concrete Loading Ramp

K Crossing

UNCLASSIFIED UNCLASSIFIED

Udairi Range

  • South Road Repairs
  • Road Maintenance

Kuwait Project Locations

slide-17
SLIDE 17

Camp Arifjan

slide-18
SLIDE 18

Ali Al Salem ECP Sunshade

slide-19
SLIDE 19

Camp Virginia Utility Projects

slide-20
SLIDE 20

Camp Virginia ECP Drainage/Road Repair

slide-21
SLIDE 21

Camp Buehring LAMS

slide-22
SLIDE 22

K-Crossing

  • 2KM long border crossing
  • Over 3,000 manday project
  • 70,000 metric tons of asphalt
  • 1,800 cubic meters of concrete
  • Completed 38% of project
slide-23
SLIDE 23

Det HOA

  • Completed over 8,200 mandays of work at

8 different det sites stretched across three countries

  • Drilled three water wells and repaired

another

  • Rapid response to Nairobi building

collapse

  • Completed a design/build boat ramp in

Kenya

slide-24
SLIDE 24

Ea r t hwor k 14 % FOB S uppor t 2 % M i nor P r oj e c t s 8 % For c e P r ot e c t ion 2 % Ca mp S e t - up 15 % Ca mp M a i nt e na nc e 17 % P l umbi ng 3 % Wa t e r We l l s 3 % I nt e r i or Finish 7 % El e c t r ic a l 1% Fa br i c S t r uc t ur e s 1% M a sonr y S t r uc t ur e s 5 % Conc r e t e & P a v ing 5 % Wood S t r uc t ur e s 12 % M e t a l S t r uc t ur e s 5 %

Work Breakdown

slide-25
SLIDE 25

Deployment Summary

  • 112 Projects Completed
  • 64,218 MD’s Completed
  • Personnel Deployed to Iraq and Kuwait

– 570 Personnel in Iraq – 877 Personnel in Kuwait (NMCB 21 and 63rd CSE) – 6 CSEs completing over 26,000 miles and 200 missions in Iraq

slide-26
SLIDE 26

QUESTIONS?