Nigel Taylor SCADA Maintenance Engineer 24 th July 2014 Gather - - PowerPoint PPT Presentation

Nigel Taylor SCADA Maintenance Engineer 24 th July 2014 Gather Transmit Receive Action Data gathered Data transmitted Data logged against OPC Servers from Locks, via GPRS (Mobile the correct site, decode and Pounds, Pumping phone) or


slide-1
SLIDE 1

Nigel Taylor SCADA Maintenance Engineer 24th July 2014

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4

Gather Transmit Receive Action

Data transmitted via GPRS (Mobile phone) or Land line OPC Servers decode and process data. Data logged against the correct site, recorded, displayed and utilised Data gathered from Locks, Pounds, Pumping Stations and Bridges

slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
  • View & Poll sites for

latest information

  • Trend data for 2 or 7

days

  • Can be used with Nokia,

Samsung, Blackberry & I-Phones

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
  • PLC control system upgrade to the Sheffield and

South Yorkshire automated locks Long Sandall Lk Doncaster Lk Sprotborough Lk Mexborough Low Lk Mexborough Top Lk Swinton Lk Kilnhurst Lk Aldwarke Lk Eastwood Lk

slide-12
SLIDE 12
  • Sowerby Bridge Pumping Station control system

upgrade and panel replacement

slide-13
SLIDE 13
  • Oxclose & Rhodesfield Lock Upgrade
slide-14
SLIDE 14
  • Keadby Lock PLC Upgrade
  • Salterhebble Bypass Sluice and Flow Monitoring
  • Lock 1 Broadreach PLC Upgrade
slide-15
SLIDE 15
  • Tees Barrage control system and remote sites

upgrade

slide-16
SLIDE 16
  • Aire & Calder Leeds Branch PLC Upgrades

Lemonroyd Lock Woodlesford Lock

  • Selby Lock
  • Goole Cassion
slide-17
SLIDE 17
  • Integrated Strong Stream Warning System
slide-18
SLIDE 18

Web Page Link

slide-19
SLIDE 19

Thank you for listening Any Questions?