1
NI Chamber Energy Forum 2016/2017 Inclusive value chain redesign
Ton van Keken SVP Operations EMEA
NI Chamber Energy Forum 2016/2017 Inclusive value chain redesign - - PowerPoint PPT Presentation
NI Chamber Energy Forum 2016/2017 Inclusive value chain redesign Ton van Keken SVP Operations EMEA 1 Inventor of modular carpet Nasdaq listed Sales $1,1 billion Employees 3.800 6 Factories on 4 continents One day people
1
Ton van Keken SVP Operations EMEA
Ray Anderson Oprichter, Interface
Journey to Zero: The seven fronts
ELIMINATE WASTE BENIGN EMISSIONS RENEWABLE ENERGY CLOSING THE LOOP RESOURCE EFFICIENT TRANSPORTATION SENSITISING STAKEHOLDERS REDESIGN COMMERCE
68% 9% 8% 8% 7%
Raw Materials Interface Manufacturing Use & Maintenance End of Life Interface Transportation
68% 9% 8% 8% 7%
Raw Materials Interface Manufacturing Use & Maintenance End of Life Interface Transportation
11
Normal carpet tile 3 - 4% Average wastage Broadloom 12% Random carpet tile 1 - 2%
14
Social hubs-sorting:
ReEntry Hub Veenendaal, the Netherlands Greenstream Recycling, Wales
Insert background Image here
Fishing nets to carpet
Aquafil’s yarn is made with 50% pre-consumer and 50% post-consumer recycled material
63% bio-based yarn
24
recycling
FACTORIES TO ZERO
PEOPLE PRODUCTS TO ZERO SUPPLIERS TO ZERO
Pathways to 2020 - What’s Left to Be Done
27
92% 84% 45% 91% 87% NOW
Zero non renewable energy Zero process water in manufacturing Zero waste will leave our factories
Factories to Zero 3 Goals
28
Energy: sustainability and costs
Year Electricity SPZ Electricity CAV Electricity total Gas SPZ Gas CAV Gas total 2015 9.040.656 kWh 1.625.998 kWh 10.666.654 kWh 1.420.908 m² 92.778 m² 1.513.686 m² Electricity SPZ Costs Electricity CAV Costs Electricity total costs Gas SPZ Costs Gas CAV Costs Gas total costs Total energy cost 813.659 € 146.340 € 959.999 € 554.154 € 36.183 € 590.338 € 1.550.336 €
SPZ: Plant in Scherpenzeel, The Netherlands Cav: Plant in Craigavon , NI
Our new Pre-coat process consumes 50% less gas per m2
32
By recovering rejected heat and reusing it in our factory heating cycle allowed us?
Heat Recovery From The Compressed Air System
Project CEA-EU-0017 New GA55kw VSD Atlas Capco Air compressor Installed Recover Heat From Compressor & Duct into factory
compressor into the factory which creates an invisible warm air curtain reducing the factory's heating costs
2016 Savings Up To Wk32
Frequent open & close
5°c 20°c
35
92% 84% 45% 91% 87% NOW
Factories to Zero Renewable Energy Leadership
CLINT Reversible Heat Pump Air / Water System 570 Kwh Heating Energy & 490 Kwh Cooling Energy
37
dropping to -20 oC & rising to 50 oC Our electricity is 100% renewable therefore the heat pumps have no impact on the environment. The heat which the heat pump extract`s from the air, is constantly being renewed naturally
Annual Energy Efficiency Gain
Current Natural Gas Heating Total Kwh 1,046,259 Kwh Gas cost per kwh 0.05 Natural Gas cost GBP £52,300.00 Green Electricity Heat Pump Total Kwh 331,793 Kwh Cost per kwh 0.10 Total Green Electricity Cost : £33,179.00 Positives Kwh % reduction 46% GBP £ Gain £19,000 Please *note projected costs are based on current market share prices*
Carpet Die cut Tiles 6 cuts + waste Carpet Ultra Sonic cut Tiles 1 cut + waste
‘window waste’ with ultra sonic cutting ‘window waste’ with die cutting
Zero Virgin Materials Zero Chemicals of Concern Zero Carbon Footprint
Supplies to Zero We Can’t Do This Alone
42
92% 84% 45% 91% NOW
Zero carbon footprint Zero virgin raw materials
Products to Zero 4 Goals
Zero chemicals
Reuse/ReEntry in every market
Technology-led carbon reductions in carpet