TSX: ME TSX: ME
1
Moneta Porcupine Mines Advanced Gold Exploration East of Timmins, - - PowerPoint PPT Presentation
Moneta Porcupine Mines Advanced Gold Exploration East of Timmins, Ontario August 2008 TSX: ME 1 TSX: ME TSX: ME Forward-looking Statements This presentation contains forward-looking statements. All statements, other than statements of
TSX: ME TSX: ME
1
TSX: ME
2
This presentation contains forward-looking statements. All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding exploration results, potential mineralization, future plans and
reflect the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects
among other things, uncertainties relating to the availability and costs of financing needed in the future, changes in commodity prices, changes in equity markets, changes to regulations affecting the Company's activities, the uncertainties involved in interpreting exploration results and other geological data and the other risks involved in the mineral exploration
applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.
TSX: ME
3
Key Asset: The Golden Highway Project (“GHP”)
3.3M tonnes @ 6.0 g/t Au (624,500oz historical resource)
2.1M tonnes @ 2.1 g/t Au (154,000oz NI 43-101 resource)
High grade intersections (27.75m @ 9.68 g/t)
Good Address
Greenstone Belt
Infrastructure/Support: all properties have access to highway & power Expanding NI 43-101 gold resources
TSX: ME
4
TSX: ME
5
TSX: ME
6
TSX: ME
7
– 70 million oz. produced along Destor from 26 mines – Goldcorp is the major producer on the Destor today
– Porcupine Camp (Timmins) – Golden Highway – Kirkland Lake to the south
– Hollinger (19.3M oz) – McIntyre (10.8M oz) – Dome (15.8M oz) – Pamour (8.0M oz)
– Lakeshore Gold, St Andrew Goldfields, Appollo Gold, Valgold, Moneta
TSX: ME
8
M atheson Tim iskam ing sedim ents locally w ith banded iron form ation M ajor faults M ines and Resources M ineralization trends (5) B LA CK F O X PRO JE CT
(form er G lim m er M ine, 209,926 oz @ o.173 oz/t) O pen pit: m inea ble 0.7 78 M t @ 8.91 g/t; indicate d 2.356 M t @ 3.27 g/t; inferred 6.26 M t @ 4 .00 g/t U nderground: indicated 1.004 M t @ 9.6 6 g/t; inferred 1.228 M t @ 9.71 g/t S cope d for 1,500 tpd, fin al feasibility underway R OS S M INE
(995,832 oz @ 0.148 oz/t)(7) H O L LO W A Y M INE
b ough t from N ewm ont, re-developm e nt u nderway, production to d ate 881 ,963 oz @ 0.16 2 oz/t; m easured 0.728 M t @ 7.0 g/t, indicated 3.29 4 M t @ 7 .5 g/t, inferre d 1.15 4 M t @ 7.3 g/t
G O LD CO RP
form er S AS O ption
(8) H O L T-M cDE RM O T T M INE
(Hollow ay No. 3 sha ft) p roduction to da te 1,322,332 oz @ 0.162 oz/t, bough t from Newm ont (acq uired fro m B arrick), red evelop m ent unde rwa y, exp loration potential
H W Y 11ONTARIO Q U E B E C
km 10
PFZ
H W Y 101A PO LLO G O LD ST A N D R EW G O LDFIELDS
S hares issued 208.5M Capitalizatio n C$ 125 .1 M @ $0.60 5 2 wee k trading range C$ 0 .47 - 1.65
M O N ETA PO R C U PINE M INES
5 6 7 8
S hare s issued 156.2M Capitalizatio n C$ 93 .7 M @ $0.60 5 2 wee k tra ding range C$ 0 .40 - 0.89 S hare s issued 98.5M C apitalization C $ 22 .7 M @ $0.23 5 2 wee k tra ding range C$ 0 .09 - 0.28
D PFZ
D ata taken from governm ent and corporate sources including w ebsites and annual reports w ith no guarentee for accuracy given; Decem ber 2007. M arket data from January 11, 2008.(6) S O U TH W EST Z O NE
B arrick 1 997 historical resou rce 624,500 oz @ 0.1 74 o z/t * M ICH A U D PROJECT A crex vested at 50% on '55' and W estern Zones W IN DJAM M E R JV a cquired from Newm ont, 2 zone s, curre ntly being e valuated * M eixn er R ep ort SE DA R Ap ril 21, 2005
D P F Z
D PFZ
D estor-Porcupine Fault Zone Pipestone Fault Zone
PFZ
N EW M O NT B A R R ICK VALG O LD
H islop Pit/ New Kelore JON PO L M INE
TSX: ME
9
– Covers ~ 12.5 km of the Destor and two major splays (Pipestone and Arrow)
– Located in Michaud and surrounding townships
– Southern Corridor: altered Timiskaming sediments – Northern Corridor: Mafic volcanics
holes on Moneta properties and 1,200 drill holes overall
TSX: ME
10
TSX: ME
11
– Barrick developed historical inferred resource of 624,500 ounces – 3M tonnes averaging 6 g/t with 3-4 g/t cutoff – Barrick was seeking high-grade mill feed for Holt-McDermott Mill
– Mineralized intersections at 1,000m
TSX: ME
12
– 4.4 million shares issued (4.4%) with 12-month hold period – Moneta is operator – 22 leased claim units – No underlying encumbrances or royalties
– Windjammer South – Windjammer North
TSX: ME
13
– 154,000oz (2.1M tonnes @ 2.1 g/t Au) – Summer drill program near completion to expand NI 43-101 resource
– Defined to 350m depth by 23 Noranda drill holes and confirmed by 3 Moneta drill holes in 2007 – Single hole mineralized past 1,000m depth
TSX: ME
14
– Twin Creeks Zone, Last Chance Zone, and Landing Zone
– Defined by 21 Noranda drill holes – Altered mafic volcanics similar to Holloway Mine 20 km away – Quartz vein intercepts typical of Timmins camp
– Potential to expand deposit in all directions & at depth
TSX: ME
15
– 65 claim units (~ 10% of the Golden Highway Project)
– Identified by 26 drill holes – On strike west from Southwest Zone – 350m mineralized strike length defined to depth of 350m – Highlights from 8-hole program from 2008: 27.75m @ 9.68 g/t
– Western Zone – Dyment3
TSX: ME
16
Focus on Golden Highway Project
estimate (completed)
resource estimates
– Windjammer South (in progress) – Between Windjammer South and Southwest Zone (in progress)
Prepare Southwest Zone for NI 43-101 resource estimate (in progress) Develop bulk tonnage deposit model
– Comparables: Detour Lake; Osisko
Update 3D geological modeling to identify future drill targets
TSX: ME
17
President & Director
London, United Kingdom
CEO & Director
Toronto, Ontario
Director
London, United Kingdom
Director
Toronto, Ontario
Director
Timmins, Ontario
Director
Brinkworth, United Kingdom
Consulting Exploration Manager
Timmins, Ontario
Corporate Counsel
Timmins, Ontario
TSX: ME
18
Stock exchange listings TSX: ME Xetra/Frankfurt/Berlin: MOP Share price range (52 week) 0.09 – 0.28 Shares outstanding 99.5 million Options outstanding 9.95 million at average price of $0.14 Warrants outstanding 1.3 million at $0.21 to December 26, 2008 Ownership by insiders 16.5 million Cash on Hand $1.7 million (June 30, 2008)
TSX: ME
19
Moneta Porcupine Mines Inc. 65 Third Avenue, Timmins, Ontario, P4N 1C2 www.monetaporcupine.com info@monetaporcupine.com Ian C Peres, CEO & Director Rod Whyte, President & Director 416.579.3040 +44.207.736.2212 Iperes@monetaporcupine.com rodwhyte@btinternet.com