Author 19.03.2018 Mod 644 20 th March 2018 Modification Requirements Energy allocation can be improved in three distinct areas: 1. Introduction of three End User Categories for what was EUC01B/EUC02B: i. EUC01P/EUC02P For prepayment


slide-1
SLIDE 1

Mod 644

20th March 2018

19.03.2018 Author

slide-2
SLIDE 2

Modification Requirements

Energy allocation can be improved in three distinct areas:

  • 1. Introduction of three End User Categories for what was EUC01B/EUC02B:
  • i. EUC01P/EUC02P – For prepayment heating load
  • ii. EUC01I/EUC02I – For Market Sector Code of Industrial & Commercial (I&C) heating load
  • iii. EUC01B/EUC02B – All remaining MPRs
  • 2. Expand the data items included in the CWV to improve the WCF applied to all EUCs

(including the newly proposed ones) which would require amendments to Section H 5.1.1

  • 3. To create wider parameters for the DAF and/or the WCF where the CWV and the SNCWV

are >[1]% tolerance

19.03.2018 2

slide-3
SLIDE 3

EUC Splits – Pre-payment Data

  • Data supplied as part of RG631 has supported previous analysis that pre-payment customers

had flatter profiles that standard residential customers

19.03.2018 3

slide-4
SLIDE 4

EUC Splits

19.03.2018 4

slide-5
SLIDE 5

EUC Cont

19.03.2018 5

slide-6
SLIDE 6

I&C Small Sites

19.03.2018 6

100 200 300 400 500 600 700 800 17/03/2006 29/03/2006 10/04/2006 22/04/2006 04/05/2006 16/05/2006 28/05/2006 09/06/2006 21/06/2006 03/07/2006 15/07/2006 27/07/2006 08/08/2006 20/08/2006 01/09/2006 13/09/2006 25/09/2006 07/10/2006 19/10/2006 31/10/2006 12/11/2006 24/11/2006 06/12/2006 18/12/2006 30/12/2006 11/01/2007 23/01/2007 04/02/2007 16/02/2007 28/02/2007 12/03/2007 Domestic Allocation Actual I&C Allocation

Large Domestics in Band 2 I&C in Band 1

slide-7
SLIDE 7

Modification Requirements

  • 1. Introduction of three End User Categories for what was EUC01B/EUC02B:
  • i. EUC01P/EUC02P – For prepayment heating load
  • ii. EUC01I/EUC02I – For Market Sector Code of Industrial & Commercial (I&C) heating

load

  • iii. EUC01B/EUC02B – All remaining MPRs
  • Evidence is clear that there will be benefits from extra EUCs
  • DESC is planning the EUC development, BUT will need data

19.03.2018 7

slide-8
SLIDE 8

Modification Requirements

Energy allocation can be improved in three distinct areas:

  • 1. Introduction of three End User Categories for what was EUC01B/EUC02B:
  • i. EUC01P/EUC02P – For prepayment heating load
  • ii. EUC01I/EUC02I – For Market Sector Code of Industrial & Commercial (I&C) heating load
  • iii. EUC01B/EUC02B – All remaining MPRs
  • 2. Expand the data items included in the CWV to improve the WCF applied to all EUCs

(including the newly proposed ones) which would require amendments to Section H 5.1.1

  • 3. To create wider parameters for the DAF and/or the WCF where the CWV and the SNCWV

are >[1]% tolerance

19.03.2018 8

slide-9
SLIDE 9

WCF changes

  • We have run some analysis on links between UIG volumes and WCF
  • UIG is highly correlated to WCF and CWV confirming our view that a large proportion of UIG

is due to the algorithm not flexing sufficiently for temperature movement

  • Our analysis shows that UIG is correlated to WCF lag 2 and CWV
  • We also ran a number of regressions and the standard parameters of the algorithm are

improved if you also include CWV or SNCWV in addition to the WCF value

  • Our belief is we can improve the algorithm by adding an additional two elements – a two day

lag to WCF and an increased weighting on CWV

  • HOWEVER we are limited to only our data, which is not pure UIG
  • We need help to analyse at an industry level and also to compare to sample data

19.03.2018 9

slide-10
SLIDE 10

Modification Requirements

Energy allocation can be improved in three distinct areas:

  • 1. Introduction of three End User Categories for what was EUC01B/EUC02B:
  • i. EUC01P/EUC02P – For prepayment heating load
  • ii. EUC01I/EUC02I – For Market Sector Code of Industrial & Commercial (I&C) heating load
  • iii. EUC01B/EUC02B – All remaining MPRs
  • 2. Expand the data items included in the CWV to improve the WCF applied to all EUCs

(including the newly proposed ones) which would require amendments to Section H 5.1.1

  • 3. To create wider parameters for the DAF and/or the WCF where the CWV and the SNCWV

are >[1]% tolerance