Mobility Maintenance, Emergency & District Coordination

Coordinating & communicating restrictions during maintenance work activities, emergency declarations & other activities affecting the state highway system.

ODOT Statewide Mobility Program
slide-2
SLIDE 2

Agenda

  • Why restriction coordination is critical.
  • Understanding restriction notification requirements.
  • Communicating mobility impacts during emergency

events.

  • Resources
slide-3
SLIDE 3

Why Restriction Coordination Is Critical To Work Zone Safety & Mobility

slide-4
SLIDE 4

ODOT G Guidin iding g Pri rincipl iple f for r Work Zone ne S Safety

“Our work zone safety goal is zer ero f fatal ataliti ties an and in inju juries, including ODOT employees, contractors, public safety professionals and the traveling public while efficiently moving people and goods.”

4
slide-5
SLIDE 5

BIG S STUFF

Mobility Coordination helps prevent

from m showing up up when & en & wher ere t e they s should ldn’t

slide-6
SLIDE 6

Why Mobility Coordination is Critical

6

Exam ample le

Manufact ctured hom home s stuck ck in in a wor

  • rk zon

k zone

slide-7
SLIDE 7

Why Mobility Coordination is Critical

7

Ano nother exam xample in in Tenn nnessee…

slide-8
SLIDE 8

Why Mobility Coordination is Critical

8

And nd in K in Kansas as…

slide-9
SLIDE 9

Why Mobility Coordination is Critical

9

And nd in C in Canad anada…

slide-10
SLIDE 10

Mobility Coordination is vital to Oregon’s economy

Annua ual W Weig ight M Mile T e Taxes es, R , Regis istratio ion & n & Fees p es paid id b by m motor c carrier iers: s: Approximately ly $361 m mil illion, o

  • r abo

bout 2 29% o

  • f t

the S e State H Hig ighway F Fund und

(Source: 2019-21 ODOT Ways & Means presentation)

In In 2016, r roug ughly 240 m millio ion t n tons o

  • f freig

eight valued ued a at $270 b billi llion moved ed w within, t n, to, and from O Oregon v n via t truck, r , rail il, a , air, p , pip ipel eline, a ne, and m marine m ine modes es.

(Source: ODOT 2018 State of the System report)

In In 2019, t , the C e Commer erce & e & Complia ianc nce O e OD Permit its U Unit I Issued ued: 61, 1,02 022 2 Annu nnual ove ver-dimens ensio ion p n permit its (allo llows f s for u unlimi mited t trips) 67,35 358 8 Sing ingle-Trip ove ver-dim imensio ension P n Permit its (inc includ udes superlo loads)

10
slide-11
SLIDE 11

Mobility Coordination is vital to Oregon’s economy

Distri rict ct Office ces a als lso p pla lay a a role le i in n helpi lping ng co coordina nate superl rload movements ts t throu

  • ugh O

h Oregon

11
slide-12
SLIDE 12

Maintenance Mobility Restriction Notification Requirements

slide-13
SLIDE 13

Restriction Notification Requirements

13

The he M Mob

  • bility T

Team s spr preads the the n news ws about t planned ed r restr triction ictions

TripCheck Commercial Vehicle Information Advisories OTL Road Restrictions List Over-Dimension Permit Analysts Letters to Annual Permit holders GovDelivery advisories Commerce & Compliance Division Oregon.gov Web site

1 2 3 4 5 6

slide-14
SLIDE 14

Restriction Notification Requirements

14

RE REQUI UIRE REMENTS F FOR R R ROUT UTINE & PLANN NNED W ED WORK

  • Activities & their impacts to

traffic must be considered prior to starting the work.

  • Restriction requirements

depend the Three A ee Activit ity Categ egories ies identified in the Maintenance Mobility Requirements Document.

  • Restriction notifications

require at least 14 or 28 days (depending on the Activity).

slide-15
SLIDE 15

Restriction Notification Requirements

15

Act ctivity 1 1 Requirements:

For rout utine a and nd pla lanned work, no notification is s not requir ired if f all o

  • f

f the followin ing g ar are met:

1. 1. For i int nters rstate & & multi-lane d e div ivid ided ed h hig ighways: If, after moving barriers/equipment, the minimum horizontal clear distance is 22 feet. 2. Fo For two wo-lane or a all ll other i indi dividu dual h highways: If, after moving barriers/equipment, the minimum horizontal clear distance is 19 feet. 3. Able to accommodate all unannounced loads by waving them through the work zone.* 4. No lane shifts/lane closures under structures

(which could result in a vertical clearance reduction, or weight restriction on certain bridges)

5. No ramp closures. 6. No weight restrictions.

*”Waved through” defined on next slide
slide-16
SLIDE 16

Restriction Notification Requirements

16

“Waved t through” h” means… s…

“for width, length, or weight the work equipment and traffic control devices can be moved (and there is an understanding that it would be) if a permitted vehicle comes to the work zone to provide the required clear distance or the required clear distance was still
  • available. This may result in a slight delay to the oversized load or
to traffic behind the load. IT IS OKAY TO HAVE A SMALL DELAY AS LONG AS YOU CAN GET THE LOAD THROUGH THE WORK ZONE.”

Mi Minim imum width requi uirement nts for waving ng t throug ugh:

22 feet of clear distance on the interstates & 19 feet clear distance on other highways. Contact the Mobility Team if you are unable to meet this requirement, as an exception may be granted on restricted routes.

slide-17
SLIDE 17

Restriction Notification Requirements

17

Activ ivity ity 2 2 Requir irements

At least 14 day notice required before the restriction begins

  • Ap

Applies to

  • wor
  • rk a

acti tivity ty tha that t rest stricts sing ngle le-trip o

  • ver-dime

mens nsion p n perm rmits. .

  • For
  • r shor

short term wor

  • rk tha

that wi t will l last f st for

  • r

the w work cre crew’s ’s f full ull work s shift on n a dail aily bas basis f for a a per eriod o

  • f tim

ime n not exceedi ding 3 g 3 continuous day ays.

slide-18
SLIDE 18

Restriction Notification Requirements

18

Why hy 14 d 4 days ys?

Singl ngle-Trip O p Over er-Dim imension sion Permit Q it Queue

  • STPs are good for one or multiple trips in a 10-day timeframe,

and are issued up to 4 days in advance.

  • They are route-specific, and carriers are not allowed to deviate.
  • CCD Over-Dimension Permit Analysts process a queue of STPs.

14 days are needed to “clear” the queue of permits affected by a restriction.

  • The Mobility

Team cannot accept less than 14 day notice, unless it’s an emergency.

slide-19
SLIDE 19

Restriction Notification Requirements

19

Activ ivity ity 3 3 Requir irements

At least 28 day notice required before the restriction begins

  • Applie

ies to work t that at im impac acts an annual al o

  • ver

er- dimens nsion p n permi mits (see provided hand out).

  • In g

n gene neral ( (depe pending o

  • n

n the lo load a and nd route) ) an annual als al allow l load ads u up to 14 fee eet wide.

slide-20
SLIDE 20

Restriction Notification Requirements

20

Why hy 28 d 28 days ys?

Annual O l Over er-dim imensio sion P Permit H it Holder N Notif tific icatio ation

  • Annual permit holders are allowed unlimited trips. We

generally do not know exactly when or where those trips will take place.

  • The Mobility Team needs enough time (28 days) to

review the restriction and issue trucking advisories and notification letters. For example:

slide-21
SLIDE 21 21

Hori rizontal C l Cle learance nce & & Lo Load Restri rict ctions

The Mobility Team applies a buffer to the available horizontal width to determine the load restriction through the work zone:

The buffer space depends on if the work zone is on a tangent and/or curve.

Temporary Horizontal Restrictions

slide-22
SLIDE 22 22

 Size & weight restrictions.  Overhead obstructions  Safe turning movements & off tracking.  Emergency services response times.  Can hazardous material loads use the route?  Are there other projects on the proposed detour that will restrict traffic?  Are other projects using the existing route as a detour?

Detours

Issu ssues t to C

  • Check:

A detour s shoul uld b be provided for f r full clo ull closures. .

Conta tact t t the M Mobil ilit ity T Team am early ly to e ensure ure t the detour c ur can h n hand ndle all traf affic ic usi using the route t to b be closed, includ uding ng frei eight & & over er-dim imensio sion u units. its.

slide-23
SLIDE 23

Highway Restriction Notification Form

(ODOT Form# 734-2357)

23
  • Used to submit restriction notifications electronically

to the Mobility Team.

  • Submitted by District Managers or their designees
  • Available at:
https://www.oregontruckingonline.com/cf/MCAD/pubMetaEntry/restriction/
slide-24
SLIDE 24

Updating Restrictions

24

Up Updat date the restric ictio ion n notice ice i if necessary.

  • If work is delayed (e.g. weather), update the

restriction to reflect the new start time/date.

  • We want to avoid showing a restriction is in effect,

when work is actually not taking place.

slide-25
SLIDE 25

Lifting Restrictions

25

Don’t f forget t to

  • Restriction notices must be lifted as soon as the

related work is complete.

  • The Mobility Team cannot lift a restriction, unless

requested by the person who submitted or reviewed the form.

  • Unless lifted, a restriction will remain published

and the trucking industry/public will not be aware.

L I F T I F T

your r restric ictio ions ns

slide-26
SLIDE 26

Utilities & Railroads

26

Notifica cation i is not required f for a activi vity ty that t

  • ccu

ccurs u unde der U Utility pe permits a and d railroad d rel elat ated ed w work.

However, the Mobil ility ity Team r m recomme mmends provid idin ing n notic tice to ensure work zone safety by preventing oversize loads from entering the work zones.

slide-27
SLIDE 27

Maintenance Projects

For l longer d durat ation ion m main aintenan ance p proje

  • jects,

ts, s staf aff a are enc ncouraged to use use a a TMP MP, W Work Z Zone D Decis ision Tree a and M Mobil ility ity Consid sideration tions s Checklist b ist before submittin itting r restr stric ictio tion n notic tices. s.

27

As part o

  • f the

e commitmen ent t to safety a and projec ect i integrity, ODOT m makes es t the T e Transportation M Managem emen ent Pl Plan ( (TMP) P) a a required por

  • rtion of
  • f all

ll O ODOT h highway c construction

  • n c

con

  • ntracts

withi hin Stat ate hi highw hway right ht of way. ODOT OT maint ntena nanc nce

  • per

eration

  • ns a

and per ermitted ed w work are e en encour uraged ed t to us use e a TMP, but but i it is not a a r req equi uiremen ent.

  • ODOT

T TMP Project L Level l Guidanc nce M Manua ual

slide-28
SLIDE 28

Communicating Mobility Impacts During Emergency Events

slide-29
SLIDE 29 29

Emergen ency cy De Decl clar aratio ions

  • Mobil

ilit ity r requir irem ement ents a are e waiv ived ed during emergency events requiring immediate & temporary traffic controls.

  • District managers may require

restrictions as necessary to protect safety & convenience

  • f travelling public.
  • District managers have the

authority under declared emergencies to waive hours of service requirements & authorize conditional approvals on alternate routes.

Mobility Impacts During Emergency Events

slide-30
SLIDE 30 30

Comm mmun unica cating R Restri rict ctions i in n an n Eme merg rgenc ncy

District managers

  • r their designees

communicate highway restrictions and/or closures caused by the emergency to the Mobility Team.

Mobility Impacts During Emergency Events

When practical, use the online Highway Restriction Notice Form:

https://www.oregontruckingonline.com/cf/MCAD/pubMetaEntry/restriction/
slide-31
SLIDE 31

Resources

slide-32
SLIDE 32

Resources

32

Highway Restriction Notice Form User Guide

Provides guidance on how to complete the online Highway Restriction Notice Form 734-2357. Available at:

https: s://www www.ore regon.g .gov/ v/ODOT/MC MCT/Documents/ s/HRNF NF-UserGu Guide.pdf f
slide-33
SLIDE 33

Resources

33

Highway Restriction Notice Form Tutorial Videos

Links to video tutorials are provided in each section of the Highway Restriction Notice Form: Links to the videos are also provided on the Statewide Traffic Mobility internal SharePoint site:

http://transac act.o .odot.s .state.o .or.u .us/mc/Mobility/ y/SitePage ages/Ho Home.a .aspx
slide-34
SLIDE 34

Resources

34

Mobility Team & Region Mobility Liaisons

Contact the Mobility Team or your Region Mobility Liaison for help. Contact information available at: Mobility internal SharePoint site:

http://transac act.o .odot.s .state.o .or.u .us/mc/Mobility/ y/SitePage ages/Ho Home.a .aspx

Mobility external website:

https: s://www www.ore regon.g .gov/ v/ODOT/MC MCT/Pages/ s/Statewi wideTra rafficMobi bility.a .aspx x
slide-35
SLIDE 35

Thank you!

35

Bill G ll Gross Mobil bilit ity T Train ainin ing Coordinat ator William.p.gross