MIROVTSI wind power plant LOCATION Novi Pazar municipality, Shumen - PowerPoint PPT Presentation

MIROVTSI wind power plant LOCATION Novi Pazar municipality, Shumen region; 50km West of the Black Sea coast and Port Varna (East and West); Close to the Hemus highway; Closest Urban areas: Mirovci population


  1. MIROVTSI wind power plant

  2. LOCATION Novi Pazar municipality, Shumen region; • 50km West of the Black Sea coast and • Port Varna (East and West); Close to the “Hemus” highway; • Closest Urban areas: • Mirovci – population – 495; ✓ altitude – 384 m; Bedjene - population – 34; ✓ altitude – 371 m; Preselka – population – 255; ✓ altitude – 312 m;

  3. MAST’S PERIODS OVERLAPPING 13.04.2009 Bedjene Dobrin 10.2007 10.2008 26.02.2007 Koriten 2007 2008 2009 Koriten 60m Dobrin 70m Bedjene 60m

  4. BEDJENE CORRECTED WITH KORITEN & DOBRIN Weibull frequency the median wind speed is 6.7 m/s the mean wind speed is 5.9 m/s

  5. WIND RESOURCE MAP • The map depicts wind speed potential at a height of 120m • The data used is taken from the 3 meteo masts • Map’s resolution of 200/200m grid • Resource map prepared using EMD WindPro 2.7 modeling software and then visualized using a GIS application.

  6. RESTRICTIONS Areas to be excluded • Forests Lakes and rivers • • Lowlands • Villages • Airplane platform at Bedjene village Required distances from Villages – 500 m • • Roads – hub height + rotor radius • Power lines – hub height + rotor radius • Gas pipelines – 250 m Lakes, rivers etc. – 150 m • • Other WTGs – 3 to 5; 5 to 7 times rotor diameter

  7. EIA ASPECTS The project’s location is outside • protected areas and Natura 2000 Field observations have been conducted • on bird migration routes and habitats: Spring migration 2009 – done by ✓ Bulgarian Society of Bird protection Autumn migration 2009 – done by ✓ Bulgarian Society of Bird protection Report on behalf of the Bulgarian Society • of Bird protection has been carried out about the bird migration in the area.

  8. EIA ASPECTS Additional field observation done by • international experts by RSK Carter Ecological and Turnstone Ecology Field observations have been conducted • on bird migration routes, nesting birds and habitats: Autumn migration 2010 ✓ Nesting birds ✓ Wintering birds ✓ Report on behalf of the RSK Carter • Ecological and Turnstone Ecology has been carried out about the bird migration in the area.

  9. EIA ASPECTS Bat observation was concluded in parallel • with Autumn migration at several observation points, including transects. Report on behalf of the BG BIOMASS Ltd • has been carried out and provided to the authorities.

  10. PERMITTING PROCESS – FROM THE BEGGINING • About 1400 land plots - purchased • 1 plot for substation - purchased • 75 project plots - purchased • 75 detailed urban plans - prepared • 75 coordinate register point - prepared • Application for adoption of a site and road design ( Regional Directorate of Agriculture) - filed • Announcement for investment intention to all responsible authorities in the Municipality Novi Pazar - filed • Announcement for investment intention to Regional Inspectorate of Environment and water Shumen - filed • Statement for necessity of Ecological Assessment (EA) - received • Plan for monitoring - approved • Letters for public consultations - sent

  11. PERMITTING PROCESS – FROM THE BEGGINING • Preliminary report for bird and bat migration - received • Bird monitoring (three seasons) - held Request for issuing of statement for grid connection - filed • • Positive statement for grid connection by NEK (200 MW project capacity) - received • EA to the local RI Е W - submitted • Preliminary contract for grid connection (200 MW project capacity) - received • Detail Urban Plan – Plot plan for internal electrical grid and internal roads (for 75 wind turbines) - prepared • Prior consent of passage right on municipal roads for an internal cable line in connection with a Detailed Urban Plan-Plot Plan (PUP PP) - received

  12. PERMITTING PROCESS – CURRENT STATUS • In 2008 wind park “MIROVCI” was started as a JV company between KAN an a strategic foreign investor. • In 2013 due to some political and legislation changes the project was split up and partially sold. • All projects permits and more than 650 dka purchased land remain KAN’s ownership. • At this stage wind park “MIROVCI” wind power plant project capacity is about 100 MW • (22 wind turbines, 4.5MW capacity each) and a possibility for 40 additional MW (9 additional turbines, 4.5MW each). • Construction permit (for foundation construction) received for 22 plots.

  13. CURRENT STAGE WIND PARK MIROVTSI

  14. INVESTMENT ADVANTAGES • Very good wind conditions • Availability for grid connection • Available road and port access • No protected areas and Natura 2000 places in the region • Detailed and long term bird and bat observations done by two of the most important Bulgarian nature conservation non profit organizations • No conflict issued wind turbines • Advanced project development • Provided land rights • Good contacts with governmental and local authorities

  15. CONTACT For more information or direct contact: Velizar Kiriakov Manager KAN Ltd. 47, Petko Todorov str. 9000 Varna, Bulgaria M +359 885 885 666 E kan@kan.bg

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.