MIROVTSI wind power plant LOCATION Novi Pazar municipality, Shumen - - PowerPoint PPT Presentation
MIROVTSI wind power plant LOCATION Novi Pazar municipality, Shumen - - PowerPoint PPT Presentation
MIROVTSI wind power plant LOCATION Novi Pazar municipality, Shumen region; 50km West of the Black Sea coast and Port Varna (East and West); Close to the Hemus highway; Closest Urban areas: Mirovci population
LOCATION
- Closest Urban areas:
✓
Mirovci – population – 495; altitude – 384 m;
✓
Bedjene - population – 34; altitude – 371 m;
✓
Preselka – population – 255; altitude – 312 m;
- Novi Pazar municipality, Shumen region;
- 50km West of the Black Sea coast and
Port Varna (East and West);
- Close to the “Hemus” highway;
MAST’S PERIODS OVERLAPPING
26.02.2007
2008 2009 2007 Koriten
10.2007 10.2008
Dobrin
13.04.2009 Bedjene
Dobrin 70m Bedjene 60m Koriten 60m
BEDJENE CORRECTED WITH KORITEN & DOBRIN
Weibull frequency the median wind speed is 6.7 m/s the mean wind speed is 5.9 m/s
WIND RESOURCE MAP
- The map depicts wind speed potential at
a height of 120m
- The data used is taken from the
3 meteo masts
- Map’s resolution of 200/200m grid
- Resource map prepared using EMD
WindPro 2.7 modeling software and then visualized using a GIS application.
Areas to be excluded
- Forests
- Lakes and rivers
- Lowlands
- Villages
- Airplane platform at Bedjene village
Required distances from
- Villages – 500 m
- Roads – hub height + rotor radius
- Power lines – hub height + rotor
radius
- Gas pipelines – 250 m
- Lakes, rivers etc. – 150 m
- Other WTGs – 3 to 5; 5 to 7 times
rotor diameter
RESTRICTIONS
EIA ASPECTS
- The
project’s location is
- utside
protected areas and Natura 2000
- Field observations have been conducted
- n bird migration routes and habitats:
✓
Spring migration 2009 – done by Bulgarian Society of Bird protection
✓
Autumn migration 2009 – done by Bulgarian Society of Bird protection
- Report on behalf of the Bulgarian Society
- f Bird protection has been carried out
about the bird migration in the area.
- Additional
field
- bservation
done by international experts by RSK Carter Ecological and Turnstone Ecology
- Field observations have been conducted
- n bird migration routes, nesting birds and
habitats:
✓
Autumn migration 2010
✓
Nesting birds
✓
Wintering birds
- Report on behalf of the RSK Carter
Ecological and Turnstone Ecology has been carried out about the bird migration in the area.
EIA ASPECTS
- Bat observation was concluded in parallel
with Autumn migration at several
- bservation points, including transects.
- Report on behalf of the BG BIOMASS Ltd
has been carried out and provided to the authorities.
EIA ASPECTS
PERMITTING PROCESS – FROM THE BEGGINING
- About 1400 land plots - purchased
- 1 plot for substation - purchased
- 75 project plots - purchased
- 75 detailed urban plans - prepared
- 75 coordinate register point - prepared
- Application for adoption of a site and road design ( Regional Directorate of Agriculture) - filed
- Announcement for investment intention to all responsible authorities in the Municipality Novi Pazar - filed
- Announcement for investment intention to Regional Inspectorate of Environment and water Shumen - filed
- Statement for necessity of Ecological Assessment (EA) - received
- Plan for monitoring - approved
- Letters for public consultations - sent
- Preliminary report for bird and bat migration - received
- Bird monitoring (three seasons) - held
- Request for issuing of statement for grid connection - filed
- Positive statement for grid connection by NEK (200 MW project capacity) - received
- EA to the local RIЕW - submitted
- Preliminary contract for grid connection (200 MW project capacity) - received
- Detail Urban Plan – Plot plan for internal electrical grid and internal roads (for 75 wind turbines) - prepared
- Prior consent of passage right on municipal roads for an internal cable line in connection with a Detailed
Urban Plan-Plot Plan (PUP PP) - received
PERMITTING PROCESS – FROM THE BEGGINING
- In 2008 wind park “MIROVCI” was started as a JV company between KAN an a strategic foreign
investor.
- In 2013 due to some political and legislation changes the project was split up and partially sold.
- All projects permits and more than 650 dka purchased land remain KAN’s ownership.
- At this stage wind park “MIROVCI” wind power plant project capacity is about 100 MW
- (22 wind turbines, 4.5MW capacity each) and a possibility for 40 additional MW (9 additional
turbines, 4.5MW each).
- Construction permit (for foundation construction) received for 22 plots.
PERMITTING PROCESS – CURRENT STATUS
CURRENT STAGE WIND PARK MIROVTSI
- Very good wind conditions
- Availability for grid connection
- Available road and port access
- No protected areas and Natura 2000 places
in the region
- Detailed and long term bird and bat
- bservations done by two of the most
important Bulgarian nature conservation non profit organizations
- No conflict issued wind turbines
- Advanced project development
- Provided land rights
- Good contacts with governmental and local
authorities
INVESTMENT ADVANTAGES
CONTACT
For more information or direct contact:
Velizar Kiriakov
Manager
KAN Ltd.
47, Petko Todorov str. 9000 Varna, Bulgaria M +359 885 885 666 E kan@kan.bg