MIROVTSI wind power plant LOCATION Novi Pazar municipality, Shumen region; 50km West of the Black Sea coast and Port Varna (East and West); Close to the Hemus highway; Closest Urban areas: Mirovci population


slide-1
SLIDE 1

MIROVTSI

wind power plant

slide-2
SLIDE 2

LOCATION

  • Closest Urban areas:

Mirovci – population – 495; altitude – 384 m;

Bedjene - population – 34; altitude – 371 m;

Preselka – population – 255; altitude – 312 m;

  • Novi Pazar municipality, Shumen region;
  • 50km West of the Black Sea coast and

Port Varna (East and West);

  • Close to the “Hemus” highway;
slide-3
SLIDE 3

MAST’S PERIODS OVERLAPPING

26.02.2007

2008 2009 2007 Koriten

10.2007 10.2008

Dobrin

13.04.2009 Bedjene

Dobrin 70m Bedjene 60m Koriten 60m

slide-4
SLIDE 4

BEDJENE CORRECTED WITH KORITEN & DOBRIN

Weibull frequency the median wind speed is 6.7 m/s the mean wind speed is 5.9 m/s

slide-5
SLIDE 5

WIND RESOURCE MAP

  • The map depicts wind speed potential at

a height of 120m

  • The data used is taken from the

3 meteo masts

  • Map’s resolution of 200/200m grid
  • Resource map prepared using EMD

WindPro 2.7 modeling software and then visualized using a GIS application.

slide-6
SLIDE 6

Areas to be excluded

  • Forests
  • Lakes and rivers
  • Lowlands
  • Villages
  • Airplane platform at Bedjene village

Required distances from

  • Villages – 500 m
  • Roads – hub height + rotor radius
  • Power lines – hub height + rotor

radius

  • Gas pipelines – 250 m
  • Lakes, rivers etc. – 150 m
  • Other WTGs – 3 to 5; 5 to 7 times

rotor diameter

RESTRICTIONS

slide-7
SLIDE 7

EIA ASPECTS

  • The

project’s location is

  • utside

protected areas and Natura 2000

  • Field observations have been conducted
  • n bird migration routes and habitats:

Spring migration 2009 – done by Bulgarian Society of Bird protection

Autumn migration 2009 – done by Bulgarian Society of Bird protection

  • Report on behalf of the Bulgarian Society
  • f Bird protection has been carried out

about the bird migration in the area.

slide-8
SLIDE 8
  • Additional

field

  • bservation

done by international experts by RSK Carter Ecological and Turnstone Ecology

  • Field observations have been conducted
  • n bird migration routes, nesting birds and

habitats:

Autumn migration 2010

Nesting birds

Wintering birds

  • Report on behalf of the RSK Carter

Ecological and Turnstone Ecology has been carried out about the bird migration in the area.

EIA ASPECTS

slide-9
SLIDE 9
  • Bat observation was concluded in parallel

with Autumn migration at several

  • bservation points, including transects.
  • Report on behalf of the BG BIOMASS Ltd

has been carried out and provided to the authorities.

EIA ASPECTS

slide-10
SLIDE 10

PERMITTING PROCESS – FROM THE BEGGINING

  • About 1400 land plots - purchased
  • 1 plot for substation - purchased
  • 75 project plots - purchased
  • 75 detailed urban plans - prepared
  • 75 coordinate register point - prepared
  • Application for adoption of a site and road design ( Regional Directorate of Agriculture) - filed
  • Announcement for investment intention to all responsible authorities in the Municipality Novi Pazar - filed
  • Announcement for investment intention to Regional Inspectorate of Environment and water Shumen - filed
  • Statement for necessity of Ecological Assessment (EA) - received
  • Plan for monitoring - approved
  • Letters for public consultations - sent
slide-11
SLIDE 11
  • Preliminary report for bird and bat migration - received
  • Bird monitoring (three seasons) - held
  • Request for issuing of statement for grid connection - filed
  • Positive statement for grid connection by NEK (200 MW project capacity) - received
  • EA to the local RIЕW - submitted
  • Preliminary contract for grid connection (200 MW project capacity) - received
  • Detail Urban Plan – Plot plan for internal electrical grid and internal roads (for 75 wind turbines) - prepared
  • Prior consent of passage right on municipal roads for an internal cable line in connection with a Detailed

Urban Plan-Plot Plan (PUP PP) - received

PERMITTING PROCESS – FROM THE BEGGINING

slide-12
SLIDE 12
  • In 2008 wind park “MIROVCI” was started as a JV company between KAN an a strategic foreign

investor.

  • In 2013 due to some political and legislation changes the project was split up and partially sold.
  • All projects permits and more than 650 dka purchased land remain KAN’s ownership.
  • At this stage wind park “MIROVCI” wind power plant project capacity is about 100 MW
  • (22 wind turbines, 4.5MW capacity each) and a possibility for 40 additional MW (9 additional

turbines, 4.5MW each).

  • Construction permit (for foundation construction) received for 22 plots.

PERMITTING PROCESS – CURRENT STATUS

slide-13
SLIDE 13

CURRENT STAGE WIND PARK MIROVTSI

slide-14
SLIDE 14
  • Very good wind conditions
  • Availability for grid connection
  • Available road and port access
  • No protected areas and Natura 2000 places

in the region

  • Detailed and long term bird and bat
  • bservations done by two of the most

important Bulgarian nature conservation non profit organizations

  • No conflict issued wind turbines
  • Advanced project development
  • Provided land rights
  • Good contacts with governmental and local

authorities

INVESTMENT ADVANTAGES

slide-15
SLIDE 15

CONTACT

For more information or direct contact:

Velizar Kiriakov