microboone s beam timing improvements
play

MicroBooNEs Beam Timing Improvements 2015-2016: MicroBooNE ( B) - PowerPoint PPT Presentation

Shutdown 2016: MicroBooNEs Beam Timing Improvements 2015-2016: MicroBooNE ( B) took its first year of data using the same triggering signals as MiniBooNE NuMI BNB - TCLK $1D + $1F coincidence for BNB double check with BNB


  1. Shutdown 2016: MicroBooNE’s Beam Timing Improvements • 2015-2016: MicroBooNE ( μ B) took it’s first year of data using the same triggering signals as MiniBooNE NuMI BNB - TCLK $1D + $1F coincidence for BNB ‣ double check with BNB resistive wall monitor (RWM) - $A9 for NuMI MB • 2015: I asked how precisely we knew neutrino arrival. μB - Neutrinos interacting in material upstream of the detector can eject neutrons which enter μ B and mimic important physics signals. MI-12 MI-8 ‣ The main handle on these neutrons will be their late arrival (> MI-10 4-22 ns). • What I learned from folks at AD: MI-60 - TCLK has intrinsic 100 ns jitter. (the above study would be impossible) - Also learned that $1F may unwittingly get bumped by 1.2 μ s! ( μ B miss 75% of BNB spill! and not know!) - Also learned that NuMI has a RWM too… Tia Miceli - postdoc NMSU

  2. Shutdown 2016: MicroBooNE’s Beam Timing Improvements • Replace μ B’s NuMI trigger TCLK $A9 to MIBS $74 - Thanks to M. Kucera for installing MIBS At MicroBooNE mezzanine in μ B’s I.R.M. $1D + $1F • Replace μ B’s BNB trigger TCLK $1D + $1F 100 ns from TCLK to BES gated w/ $1D! - Thanks to B. Pellico for solution with Tawzer and CAMAC 055. - Thanks to G. Vogel and crew for set-up in MI-12. BES + $1D - Thanks to G. Brown for orchestrating fiber- path to μ B. • Deliver NuMI RWM to μ B. Much more precise triggering for MicroBooNE! - Thanks to P. Adamson for aiding. - Thanks to G. Brown for orchestrating the fiber-path. • Simplified BNB RWM path to μ B. Tia Miceli - postdoc NMSU

  3. Shutdown 2016: MicroBooNE’s Beam Timing Improvements • A huge THANK YOU to External Beams, Proton Source, and Controls Departments for making this improvement possible! - Help from C. Moore, T. Kobilarcik, and M. Backfish have enabled MicroBooNE to precisely determine beam timing. - These improvements are needed for ‣ Understanding beam-induced neutron backgrounds - Neutral Current Elastic cross-section measurements ‣ Kaon decay at rest from NuMI dump ‣ Capability to reduce cosmogenic backgrounds by tightening trigger window. • Improves triggering and timing for μ B, and the entire Short Baseline Neutrino Program Tia Miceli - postdoc NMSU

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.