MEASURE L BOND UPDATE August 13, 2019 Measure L Overview - PDF document

MEASURE L BOND UPDATE August 13, 2019 Measure L Overview Project Updates Program Schedule Review Measure L Project Updates Cherrywood Elementary School - FIS Completion August 30, 2019 In progress: Elevator


  1. MEASURE L BOND UPDATE August 13, 2019

  2. Measure L – Overview • Project Updates • Program Schedule Review

  3. Measure L – Project Updates Cherrywood Elementary School - FIS • Completion August 30, 2019 • In progress: • Elevator • Ceilings • Painting • Flooring • Finish Plumbing • HVAC • Lighting • Fire Alarm

  4. Measure L – Project Updates Cherrywood FIS – FIS Space Looking Up at FIS

  5. Measure L – Project Updates Cherrywood FIS – FIS Space Looking East- August

  6. Measure L – Project Updates Cherrywood FIS – Kitchen Area - August

  7. Measure L – Project Updates Toyon Elementary School - FIS • Grass installation – Complete • Twinkle Lights – Completion August 16, 2019 Brooktree Elementary School - FIS • Printed ceiling tiles replacement - Complete Morrill • Library desk - Complete Piedmont Parking Lot • In use as of Monday, August 5, 2019 • Progress: • Landscaping • New Driveway Approach

  8. Measure L – Project Updates Morrill Library Desk

  9. Measure L – Project Updates Toyon FIS

  10. Measure L – Project Updates Piedmont Parking Lot

  11. Measure L – Project Updates Additional Projects • Completed Projects • Plumbing Projects • Cherrywood – Hot water line replacement • Backflow preventer's – Complete @ Piedmont and Sierramont • Paving – Laneview - upper pavement replacement at delivery area • Fertigation System • In Progress: • Traffic Gates – BT, CW, NW, SD, VP, and MM • Cafeteria Tables • Portable Restroom Replacement @ Brooktree • Wireless thermostat's at portables

  12. Project Updates Northwood Elementary School – Portable Relocation • Complete: • Driveway and fencing at southwest corner of site along Lakewood Drive

  13. Measure L – Program Schedule Construction Legend Furniture Legend Design Preconstruction Furniture Design DSA Review Construction Quote Pricing Bid Start of School PO Generated Award Punch List Construction Projects 2 0 1 9 2 0 2 0 August September October November December January February March April May June July August September October November December Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week Week 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 5 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 Pie dm ont Parking I m provem ents Che r ry wood FI S/ Modernization Additiona l Proj e cts Tr a ffic Ga te s BT, CW, NW SD, BP, MM NB, PM, SM Ca fe te ria Ta ble Re pla ce m e nt Libra ry She lv ing HVAC Proj e cts Toyon Morrill Plum bing Pr oj e cts Cherrywood - Water line replacem ent Backflow Preventer - Piedm ont Backflow Preventer - Morrill Por ta ble Re str oom Re pla ce m e nt @ Brook tr e e Pe r im e te r Fe ncing Cherrywood Laneview Noble Ruskin Sierram ont Pa v ing - La ne v ie w Upper delivery Area S Staff Parking Lot Wir e le ss The r m osta t @ Porta ble s Ma in Ala r m Se cur ity Pa ne l Re pla ce m e nt Fe r tiga tion Sy ste m - Mor rill Lunch Sha de Str ucture s Noble Ruskin Morrill Furniture Projects FI S Furniture - Cherrywood

  14. Thank You

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.