MCLC FAMILY LIMITED PARTNERSHIP PROPERTY DRI 532-M4 PROJECT LOCUS: TISBURY PROPERTY ORIENTATION 5.43 ACRES WAREHOUSING, RETAIL, PACKAGE DISTRIBUTION STATIONARY AND ROLLING STORAGE GREENERY, PAVED AND UNPAVED SURFACES
SLIDE 2
SLIDE 3
PROPERTY ORIENTATION
- 5.43 ACRES
- WAREHOUSING, RETAIL, PACKAGE DISTRIBUTION
- STATIONARY AND ROLLING STORAGE
- GREENERY, PAVED AND UNPAVED SURFACES
SLIDE 4
PROJECT GOALS
- FINALIZE CAMPUS PLAN FOR THE PROPERTY
- REDUCE CURRENT AND FUTURE IMPACTS WHILE ALLOWING SITE
USAGE TO CONTINUE
SLIDE 5
EXISTING BUILDINGS AND STRUCTURES
- TWO STORY STORAGE AND OFFICE BUILDING
○ CARROLL’S MOVING AND STORAGE, CASH AND CARRY - 15,560 SF
- ONE STORY MODULAR PACKAGE DISTRIBUTION CENTER
○ UPS (THEIR FACILITY WAS UPDATED AS DRI 532 M3 IN 2018) - 803 SF
- ROLLING AND STATIONARY STORAGE CONTAINERS
○ LOCATED AT THE WESTERN END OF THE LOT - 20,310 SF
SLIDE 6
PROPOSED SITE IMPROVEMENTS
- REPLACE AD HOC TRAILER STORAGE AT WESTERN END OF LOT WITH
A SELF STORAGE BUILDING FOR ISLAND RESIDENTS
- REDUCE IMPERVIOUS AREAS AND RECLAIM WITH ISLAND
APPROPRIATE PLANTINGS
- PROVIDE GRADE RETENTION AND ENHANCEMENT OF EXISTING
RETAINAGE
- FENCING REPAIRS AND IMPROVEMENTS
- REDUCTION OF SITE WASTEWATER NITROGEN WITH IA SYSTEM
- ENHANCED STORMWATER MANAGEMENT WITH GREEN STRATEGIES
- PARKING AND STAGING PLAN
SLIDE 7
SLIDE 8
SLIDE 9
FACE OF RETAINING WALL
SLIDE 10
PARKING OVERLAY EXISTING CONDITIONS
SLIDE 11
SLIDE 12
SITE TRAFFIC FLOW
SLIDE 13
SITE FENCING PLAN
SLIDE 14
STORMWATER MANAGEMENT
SLIDE 15
DETAIL: STORMWATER MANAGEMENT
SLIDE 16
RETAIN AND SUPPLEMENT EXISTING PLANTINGS
SLIDE 17
SLIDE 18
REMOVE TRAILERS REPLACE WITH BUILDING NET REDUCTION IN FOOTPRINT AND IMPERVIOUS SURFACES
PROPOSED NEW SELF STORAGE BUILDING
SLIDE 19
GRADE AND NATURAL SCREENING
SLIDE 20
LIGHTING PLAN
LOADING DOCK MAIN ENTRY
SLIDE 21
PROPOSED BUILDING: FRONT ELEVATION
SLIDE 22
PROPOSED BUILDING: LEFT ELEVATION
SLIDE 23
PROPOSED SELF STORAGE BUILDING
SLIDE 24
INSULATED CONCRETE FORM & STEEL FRAMING
SLIDE 25
SLIDE 26
SLIDE 27
EXAMPLE OF WOODEN CLADDING
SLIDE 28
WORKFORCE HOUSING OFFER
- WORKFORCE HOUSING TO BE PROVIDED ON LOT 21.4
- BEGIN WITHIN 36 MONTHS AFTER SUCCESSFUL PROJECT COMPLETION
- POTENTIAL TIE IN TO IA WASTEWATER TREATMENT SYSTEM