mclc family limited partnership property dri 532 m4
play

MCLC FAMILY LIMITED PARTNERSHIP PROPERTY DRI 532-M4 PROJECT LOCUS: - PowerPoint PPT Presentation

MCLC FAMILY LIMITED PARTNERSHIP PROPERTY DRI 532-M4 PROJECT LOCUS: TISBURY PROPERTY ORIENTATION 5.43 ACRES WAREHOUSING, RETAIL, PACKAGE DISTRIBUTION STATIONARY AND ROLLING STORAGE GREENERY, PAVED AND UNPAVED SURFACES


  1. MCLC FAMILY LIMITED PARTNERSHIP PROPERTY DRI 532-M4

  2. PROJECT LOCUS: TISBURY

  3. PROPERTY ORIENTATION ● 5.43 ACRES ● WAREHOUSING, RETAIL, PACKAGE DISTRIBUTION ● STATIONARY AND ROLLING STORAGE ● GREENERY, PAVED AND UNPAVED SURFACES

  4. PROJECT GOALS ● FINALIZE CAMPUS PLAN FOR THE PROPERTY ● REDUCE CURRENT AND FUTURE IMPACTS WHILE ALLOWING SITE USAGE TO CONTINUE

  5. EXISTING BUILDINGS AND STRUCTURES ● TWO STORY STORAGE AND OFFICE BUILDING ○ CARROLL’S MOVING AND STORAGE, CASH AND CARRY - 15,560 SF ● ONE STORY MODULAR PACKAGE DISTRIBUTION CENTER ○ UPS (THEIR FACILITY WAS UPDATED AS DRI 532 M3 IN 2018) - 803 SF ● ROLLING AND STATIONARY STORAGE CONTAINERS ○ LOCATED AT THE WESTERN END OF THE LOT - 20,310 SF

  6. PROPOSED SITE IMPROVEMENTS ● REPLACE AD HOC TRAILER STORAGE AT WESTERN END OF LOT WITH A SELF STORAGE BUILDING FOR ISLAND RESIDENTS ● REDUCE IMPERVIOUS AREAS AND RECLAIM WITH ISLAND APPROPRIATE PLANTINGS ● PROVIDE GRADE RETENTION AND ENHANCEMENT OF EXISTING RETAINAGE ● FENCING REPAIRS AND IMPROVEMENTS ● REDUCTION OF SITE WASTEWATER NITROGEN WITH IA SYSTEM ● ENHANCED STORMWATER MANAGEMENT WITH GREEN STRATEGIES ● PARKING AND STAGING PLAN

  7. FACE OF RETAINING WALL

  8. PARKING OVERLAY EXISTING CONDITIONS

  9. SITE TRAFFIC FLOW

  10. SITE FENCING PLAN

  11. STORMWATER MANAGEMENT

  12. DETAIL: STORMWATER MANAGEMENT

  13. RETAIN AND SUPPLEMENT EXISTING PLANTINGS

  14. PROPOSED NEW SELF STORAGE BUILDING REMOVE TRAILERS REPLACE WITH BUILDING NET REDUCTION IN FOOTPRINT AND IMPERVIOUS SURFACES

  15. GRADE AND NATURAL SCREENING

  16. LOADING DOCK LIGHTING PLAN MAIN ENTRY

  17. PROPOSED BUILDING: FRONT ELEVATION

  18. PROPOSED BUILDING: LEFT ELEVATION

  19. PROPOSED SELF STORAGE BUILDING

  20. INSULATED CONCRETE FORM & STEEL FRAMING

  21. EXAMPLE OF WOODEN CLADDING

  22. WORKFORCE HOUSING OFFER ● WORKFORCE HOUSING TO BE PROVIDED ON LOT 21.4 ● BEGIN WITHIN 36 MONTHS AFTER SUCCESSFUL PROJECT COMPLETION ● POTENTIAL TIE IN TO IA WASTEWATER TREATMENT SYSTEM

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend