Maturing to Tangible Impact Assessment (IA) on Small-scale Construction Projects Bharat Gordhan IAIA 2019 Conference #IAIA19 Thursday, 02 May 2019 Agenda Introduction Environmental Legislation Evolution Environmental Culture on a


slide-1
SLIDE 1

Maturing to Tangible Impact Assessment (IA)

  • n Small-scale

Construction Projects

Bharat Gordhan

Thursday, 02 May 2019 IAIA 2019 Conference #IAIA19

slide-2
SLIDE 2
  • Introduction
  • Environmental Legislation Evolution
  • Environmental Culture on a Construction Site
  • Impact Assessment during Construction
  • Conclusion
  • Questions

2 Maturing to Tangible IA on Construction Projects #IAIA19

Agenda

slide-3
SLIDE 3

Sediment Pollution

Sediment pollution costs $16bn in environmental damage annually and is the most common pollutant affecting watercourses.

  • EPA, USA, 2018 Factsheet

In Australia – the effect of sediment on the Great Barrier Reef… $8.2 bn as clean up costs

3 Maturing to Tangible IA on Construction Projects

slide-4
SLIDE 4

Environmental Legislative Evolution

slide-5
SLIDE 5

Environmental Legislations

5 Maturing to Tangible IA on Construction Projects #IAIA19

Universal Principles:

  • Stakeholder Consultation
  • Impact Identification
  • Impact Assessment
  • Mitigation Measures

NSW, Australia Environmental Planning and Assessment Act, 1979 (Act No. 203 of 1979) (“EPA Act”) South Africa National Environmental Management Act, 1998 (Act No. 107 of 1998) (“NEMA”)

slide-6
SLIDE 6

Small-scale Road Project

6 Maturing to Tangible IA on Construction Projects #IAIA19

NSW, Australia

  • Roads & Maritime Services

(RMS)

  • Environmental team within RMS

does environmental assessment “fullest extent possible” (using EIS / REF)

  • RMS is a determining authority,

as delegated by the EPA Act sharing responsibility

  • Does not overburden the EPA

South Africa

  • South African National Roads

Agency Limited (SANRAL)

  • Independent Consultant

appointed for BA / EIA

  • SANRAL cannot make

environmental decisions as responsibility and jurisdiction with DEA

slide-7
SLIDE 7

What are the results of such an evolution?

7 Maturing to Tangible IA on Construction Projects #IAIA19

Shared determining authority model One environmental authority model

  • Focus on infrastructure delivery while considering environmental matters
  • Responsible and capable environmental team
  • Unsuccessful if subjected to corruption and sub-standard assessment
slide-8
SLIDE 8

Environmental Culture on a Construction Site

slide-9
SLIDE 9

Large-scale Project Small-scale Project

Type of culture to be tolerated and encouraged with a focus on:

  • Communication
  • Safety standards
  • Methodology of construction
  • Contractual obligations
  • Project team
  • Environmental risks

Type of culture to be tolerated and encouraged with a focus on:

  • Communication
  • Safety standards
  • Methodology of construction
  • Contractual obligations
  • Project team
  • Environmental risks

9

slide-10
SLIDE 10

Low Environmental Risk → High Environmental Impact

10 Maturing to Tangible IA on Construction Projects

slide-11
SLIDE 11

Impact Assessment During Construction

11 Maturing to Tangible IA on Construction Projects

slide-12
SLIDE 12

Significance = (Duration + Extent + Intensity) × Probability

slide-13
SLIDE 13

Erosion and Sediment Control Plans

13 Maturing to Tangible IA on Construction Projects

slide-14
SLIDE 14
  • 1. As the ‘one environmental authority model’ in South Africa

evolves and matures, could elements from the ‘shared determining authority model’ of NSW be considered?

  • 2. Environmental representative to advise on small-scale

construction projects to help the PM / Engineer manage environmental risks.

  • 3. ESCP for tangible and prompt environmental risk management,

even on small-scale construction projects.

14 Maturing to Tangible IA on Construction Projects

What can YOU consider?