Matimba ACC Fan Guards Project Clarification Meeting Presented By: Francois Nel Date:2020/07/23 Overview 6 x Units 48 x Fans per unit 30ft fans 288 fans in total 45m elevation 2 Single fan 250 kW motor and gearbox 8 x bladed fan 1 x


slide-1
SLIDE 1

Presented By: Francois Nel Date:2020/07/23

Matimba ACC Fan Guards Project Clarification Meeting

slide-2
SLIDE 2

Overview

2

6 x Units 48 x Fans per unit 30ft fans 288 fans in total 45m elevation

slide-3
SLIDE 3

Single fan

3

250 kW motor and gearbox 8 x bladed fan 1 x blade = 95 kg

slide-4
SLIDE 4

Fan Gap

4

Existing fan grid Existing 600mm (Vertical) gap though which blades are falling.

slide-5
SLIDE 5

Employers Proposal

5

slide-6
SLIDE 6

Fan Detail

6

slide-7
SLIDE 7

Fan blades assembly

7

slide-8
SLIDE 8

Existing gap

8

slide-9
SLIDE 9

Failed fan blades – Blade falling though gap

9

slide-10
SLIDE 10

SOW

10

slide-11
SLIDE 11

SOW Summary

11

slide-12
SLIDE 12

Section 3.2 of the NEC works information

12

The ECSA registered engineer responsible for reviewing the design, will review Section 3.2.1 of the NEC works information. The registered engineer will review the assumptions made by the employer and add additional assumptions where necessary and apply the necessary engineering principles to ensure the design is suitable for the application and ensuring that in the event of a failure, the installed fan guards will prevent a fan blade from falling down to 0m level or fail itself and fall.

slide-13
SLIDE 13

Safety Requirements - 1

13

slide-14
SLIDE 14

Safety Requirements - 2

14

Risk:

  • Starting fans

with people inside – People could die.

  • Starting the fan

with tools and equipment inside – Fan will be destroyed.

  • Starting a fan

with loose

  • bjects inside

(Bolts, nuts etc) – Someone can get seriously injured from projectiles

slide-15
SLIDE 15

Employer will give the following

15

slide-16
SLIDE 16

Deadlines

16

slide-17
SLIDE 17

Tender Returnables to be evaluated

17

slide-18
SLIDE 18

Tech evaluation -1

18

slide-19
SLIDE 19

Method Statement - 1

19

slide-20
SLIDE 20

Method Statement - 2

20

slide-21
SLIDE 21

Method Statement - 3

21

slide-22
SLIDE 22

Tech evaluation - 2

22

slide-23
SLIDE 23

Tech evaluation - 3

23

slide-24
SLIDE 24

Tech evaluation - 4

24

slide-25
SLIDE 25

Tech evaluation - 5

25

slide-26
SLIDE 26

Employer Proposal

26

slide-27
SLIDE 27

Employer Proposal

27

slide-28
SLIDE 28

Employer Proposal

28

slide-29
SLIDE 29

Employer Proposal

29

slide-30
SLIDE 30

Employer Proposal

30

slide-31
SLIDE 31

Employer Proposal

31

slide-32
SLIDE 32

Lift and walkway

32

slide-33
SLIDE 33

Available Crane for hoisting

33

slide-34
SLIDE 34