Gillette South Boston Manufacturing Center
Chapter 91 License Application
FORT POINT N EIG HBORHOOD ASSOCIATION MARCH 31, 2020
Manufacturing Center ASSOCIATION MARCH 31, 2020 Chapter 91 License - - PowerPoint PPT Presentation
Gillette South Boston FORT POINT N EIG HBORHOOD Manufacturing Center ASSOCIATION MARCH 31, 2020 Chapter 91 License Application LICENSE HISTORY 4/20/2020 2 Single License to Maintain: Existing structures and uses PURPOSE
FORT POINT N EIG HBORHOOD ASSOCIATION MARCH 31, 2020
4/20/2020 2
➢ Existing structures and uses ➢ Water-dependent industrial uses ➢ Water-dependent accessory uses
3 4/20/2020
PROJECT SITE
which is historically filled tidelands
water-sheet
PROJECT SITE
which is historically filled tidelands
water-sheet
4/20/2020 6
7 4/20/2020
8 4/20/2020
4/20/2020 9
1. Seawater intake building is located here.
2. Three pipes run below the parking lots and above the I-90 highway tunnel.
4/20/2020 10
3. Cooling water from the manufacturing building is returned to the Channel through the outfall at Location 3.
4/20/2020 11
4. Water used to cool manufacturing machinery discharges at Location 6.
4/20/2020 12
5. Water taken from the Channel cools power-generating machinery at the Power House (and at the Chiller Building for warm-weather cooling of the buildings). Water is discharged at locations 6 and 7.
4/20/2020 13
4/20/2020 14
1984 were entirely separated by a public way or interconnected public ways from any flowed tidelands;
tidelands which are presently located within 250 feet of the high-water mark, 310 CMR 9.02
4/20/2020 17