Manufacturing Center ASSOCIATION MARCH 31, 2020 Chapter 91 License - PowerPoint PPT Presentation

Gillette South Boston FORT POINT N EIG HBORHOOD Manufacturing Center ASSOCIATION MARCH 31, 2020 Chapter 91 License Application LICENSE HISTORY 4/20/2020 2 Single License to Maintain: Existing structures and uses PURPOSE


  1. Gillette South Boston FORT POINT N EIG HBORHOOD Manufacturing Center ASSOCIATION MARCH 31, 2020 Chapter 91 License Application

  2. LICENSE HISTORY 4/20/2020 2

  3. Single License to Maintain: ➢ Existing structures and uses PURPOSE ➢ Water-dependent industrial uses OF LICENSE ➢ Water-dependent accessory uses 4/20/2020 3

  4. PROJECT SITE • 8 Parcels • 25.6 acres — most of which is historically filled tidelands • Includes 46,364 sf of water-sheet

  5. PROJECT SITE • 8 Parcels • 25.6 acres — most of which is historically filled tidelands • Includes 46,364 sf of water-sheet

  6. EXTENDED TERM LICENSE REQUEST 4/20/2020 6

  7. MUNICIPAL HARBOR PLAN 4/20/2020 7

  8. Water-Dependent CHAPTER 91 vs. Nonwater-Dependent 4/20/2020 8

  9. 1. Seawater intake building is located here. 4/20/2020 9

  10. 2. Three pipes run below the parking lots and above the I-90 highway tunnel. 4/20/2020 10

  11. 3. Cooling water from the manufacturing building is returned to the Channel through the outfall at Location 3. 4/20/2020 11

  12. 4. Water used to cool manufacturing machinery discharges at Location 6. 4/20/2020 12

  13. 5. Water taken from the Channel cools power-generating machinery at the Power House (and at the Chiller Building for warm-weather cooling of the buildings). Water is discharged at locations 6 and 7. 4/20/2020 13

  14. File Number MA DEP CHAPTER 91 Reference: PUBLIC PROCESS W20-5696 4/20/2020 14

  15. Susan You Waterways Regulation Program Mass DEP COMMENTS One Winter Street, 5th Floor TO: Boston, MA 02108 Susan.You@mass.gov

  16. • Any filled tidelands which on January 1, 1984 were entirely separated by a public way or interconnected public LANDLOCKED ways from any flowed tidelands; TIDELANDS • Except for that portion of such filled tidelands which are presently located within 250 feet of the high-water mark, 310 CMR 9.02

  17. 4/20/2020 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.