Overview
- Drivers for electronic processing
- LGA R&D Funded Pilot
- Experiences to Date
- Challenges for Implementation
Drivers
Drivers
30 Lots per year 1,000 Lots per year?
LGA R&D Funded Pilot
- 3744m2 Road Surface
- 4262m2 Road Pavement
- 10 Pram Ramps
- 127.4m Spoon Drain
- 905m Kerb & Gutter
- 825m Footpath
- 1 Indented Car Park
- 4 Side Entry Pits
- 2 Junction Boxes
- 1 Grated Inlet Pit
- 7 Stormwater Allotment Connections
- 353m Stormwater Pipe
- 6 Sewer Flushing Points
- 24 Sewer Inspection Points
- 1 Sewer Manhole
- 123m Sewer pipe
- 1 Roundabout
- 3 Splitter Islands
Freeling Estate - Stage 7 (33 Allotment Release)
10 hours to input
LGA R&D Funded Pilot
As-Constructed data provided as XML script
=
LGA R&D Funded Pilot
XML script read into FME to transform data
LGA R&D Funded Pilot
Excel Output from FME for Conquest Input
Complicated asset register meant some manual input was still required – macros were developed to assist: VBA script
LGA R&D Funded Pilot
GIS Output from FME
Assets were output as individual MapInfo tab files. Surface and Pavement assets had to be drawn manually due to survey data incompatibility at the roundabout.
LGA R&D Funded Pilot
GIS Output from FME
Manually drawn GIS vs. ADAC GIS output
Experiences to Date
- XML script – some modifications (errors/omissions)
- FME – changes to match output requirements & resolve errors
- Excel VBA – macros developed to auto-fill from manual input
- Missing Assets & Fields – surfaces, pavement, kerbing & footpaths
Runtimes: Savings = Approx. 6 hours 30 minutes for 33 allotments
ADAC FME = 16.4 seconds Excel input + VBA = 15 minutes Manual input of missing assets = 3 hours Upload to Conquest = 10 minutes Manual Conquest + MapInfo Input = 10 hours
Challenges for Implementation
- Showing benefits to developers (faster Council processing = $)
- Upskilling required in all phases:
- Superintendent & Surveyor to produce good XML
- Council staff in managing FME and excel script
- Asset Register currently not well aligned to ADAC
- Less visual verification / potentially more difficult to spot errors