Li Libra brary y & Ar & Arts Ce ts Cent nter er
City of Yorba Linda
February 21, 2017
City Council Meeting
Li Libra brary y & Ar & Arts Ce ts Cent nter er City - - PowerPoint PPT Presentation
City of Yorba Linda Li Libra brary y & Ar & Arts Ce ts Cent nter er City Council Meeting February 21, 2017 PROJECT BACKGROUND RECENT COUNCIL ACTIONS 1. At the January 19, 2016 City Council meeting, staff was directed to come
February 21, 2017
City Council Meeting
RECENT COUNCIL ACTIONS
to “maximize resident enjoyment” on the Strawberry Field/Site 13.
to bring back a full financial report on funding alternatives within the context of the City’s overall financial picture, and to move forward with the architectural selection process.
budget and a more detailed financing plan once the architectural design process was underway.
agreement with Group 4 Architecture, Research + Planning, Inc. (Group 4) and authorized an interfund loan from the Library Fund to the General Fund.
7
PROGRAM
14
LIBRARY ARTS CENTER TWO LEVEL PARKING GARAGE
LAKEVIEW AVENUE LEMON DRIVE
N
SHARED OUTDOOR SPACE
15
LIBRARY ARTS CENTER SURFACE PARKING
LAKEVIEW AVENUE LEMON DRIVE
N
SHARED OUTDOOR SPACE
LIBRARY ARTS CENTER SURFACE PARKING
LAKEVIEW AVENUE LEMON DRIVE
N
SHARED OUTDOOR SPACE
PREFERRED CONCEPTUAL OPTION
SITE
20
BUILDING QUALITY LOW MID-RANGE HIGH
Local References City Hall, Current Library & Typical Elementary School Community Center Nixon Library Interiors School Quality Better Finishes, More Inviting Exterior More Boxy; Stucco; Limited Windows More Articulation; More Accent Materials; More Windows & Exterior Connections Outdoor Spaces Simple Open Spaces & Landscaping; Limited Furniture, Features & Materials Diverse Open Spaces, Landscaping & Materials; Varied Integrated Furniture & Interactive Features Energy Code Compliant Better Controls & Energy Efficiency Highly Sustainable & Net Zero Lighting Code Compliant & Limited Accents Enhanced Lighting & Controls Diverse Lighting Controls & Management Flexibility Limited Operable Walls & Flexible Infrastructure Budget Base + 10-15% + 20-50%
21
LIBRARY SIZE COMPARISON
SIZE TODAY 28,000 45,000 50,000
Area Increase Undersized +61% larger than today +79% larger than today Collections Undersized 9-11% Increase
11-13% Increase
General Seating ~290 Seats 380 - 415 Seats 415 – 450 Seats Community Rooms ~375 Seats 450-490 Seats 500- 540 Seats
22
ARTS CENTER SIZE COMPARISON
SIZE 13,500 15,000
Black Box Theater 180 – 290 Seats 220 – 310 Seats Digital Arts None 25-40 Participants Arts 30-50 Participants Dance 40-100 Participants
23
SURFACE PARKING PARKING GARAGE
Base +$8M
TWO LEVEL PARKING GARAGE
LAKEVIEW AVENUE
LIBRARY ARTS CENTER SHARED OUTDOOR SPACE SURFACE PARKING
LAKEVIEW AVENUE LEMON DRIVE LEMON DRIVE
LIBRARY ARTS CENTER SHARED OUTDOOR SPACE
24
For a given size…
1. Can’t take out 10% of stair treads or make elevators 10% shorter and still make it to second floor… 2. Can’t leave out the foundation under 10% of the building… 3. Can’t take out 10% of columns and still hold up the building… 4. Can’t take out 10% of roof tiles and still keep out the rain… 5. All of the building systems that you can’t reduce make up 75-85% of the
6. You would need to make a 50-75% reduction in the things you can change which is often the things you see (materials) or functional equipment.
COST MODEL SUMMARY
25
PROGRAM OPTIONS COST BREAKDOWNS
26
– Design and construction anticipated to be completed no earlier than fiscal year 2018/19 – $22.4 million projected to be on hand at that time – $2.7 million or more generated from sale of current Library site – $25.1 million in projected total available reserves – Recommend $2.0 million remain in reserves – $23.1 million in cash available to contribute to the project
associated with funding the balance of the project costs with debt
27
and a little less than half in Option A
with an option to prepay all or a portion of the debt after 10 years
year that should continue to increase gradually
– In Option A, the General Fund would need to assist the Library in paying the debt, at least in the early years – In Options B and C, the Library would have a small surplus remaining after making the debt payments, which would fund any increased operating costs
Option Library GSF Garage Library Cost Cash Funding Debt Funding Annual Debt Payment Option A 50,000 GSF Yes $50,200,000 $23,100,000 $27,100,000 $1,600,000 Option B 50,000 GSF No $44,100,000 $23,100,000 $21,000,000 $1,200,000 Option C 45,000 GSF No $40,600,000 $23,100,000 $17,500,000 $1,000,000
28
identified the following funding options for the Arts Center
– Potential surplus property sales – Use of excess General Fund operating reserves – Debt financing
– General fund budget will continue to grow – Some additional cushion should be maintained – A maximum of $2.5 million is recommended based on current reserve levels – If debt financing is pursued, operating reserve funds could be utilized to decrease the portion of the project funded by debt
29
$523,000 -$665,000
portion of the debt after 10 years
upcoming two-year budget
Option Arts Center GSF Garage Arts Center Cost Cash Funding Debt Funding Annual Debt Payment Option A 15,000 Yes $14,300,000 $0 $14,300,000 $821,000 $2,500,000 $11,800,000 $679,000 Option B 15,000 No $12,400,000 $0 $12,400,000 $717,000 $2,500,000 $9,900,000 $575,000 Option C 13,500 No $11,500,000 $0 $11,500,000 $665,000 $2,500,000 $9,000,000 $523,000
30
reserves and debt
– $23.1 million of cash reserves available – $17.5 million of debt – Annual payments at $1.0 – Library resources of up to $1.3 million per year available
property sale proceeds or a combination of cash reserves and debt
– $2.5 million of cash reserves available – $9.0 million of debt – Annual payments at $523,000 – Resources would be allocated from General Fund operating budget
GSF ), with surface parking;
the project, which is based on the previous direction received from the City Council
Council at a subsequent meeting; and
advisor to assist the City with the issuance of debt for the project.