launched in April 2013 It was designed after I received a number of - - PowerPoint PPT Presentation

launched in april 2013 it was designed after i received a
SMART_READER_LITE
LIVE PREVIEW

launched in April 2013 It was designed after I received a number of - - PowerPoint PPT Presentation

The Stronghold was designed in 2009 and launched in April 2013 It was designed after I received a number of requests from large construction and glazing companies The companies needed to reduce their enormous scaffold bills and


slide-1
SLIDE 1
slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
  • The Stronghold was designed in 2009 and

launched in April 2013

  • The companies needed to reduce their

enormous scaffold bills and ‘Work at Height’

  • It was designed after I received a number of

requests from large construction and glazing companies

  • The Stronghold was designed to offer a simple

solution to their problems

slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13

Health and Safety

  • No more ‘Work at Height’!
  • No more ‘Falls from Height’!
  • No more dropped tools or equipment !
slide-14
SLIDE 14

Economical

  • No more expensive and disruptive scaffold!
  • Reduce job completion times
  • Reduce sick days and injury claims
  • Allows a company to provide more competitive

quotes and win more business

  • Reduce transport costs and setup times for ‘in

house’ tower scaffold

slide-15
SLIDE 15
slide-16
SLIDE 16
  • Total set weighs just over 25Kg
  • Conforms to BS EN 795 B: 2012
  • Tested to carry 1.9T
  • Proudly made in Great Britain
  • Minimal maintenance
  • Easily stored and transported
  • TS 16415: 2013
  • ANSI Z359.1: 2007. AS/NZS 5532: 2013
slide-17
SLIDE 17