SLIDE 1
launched in April 2013 It was designed after I received a number of - - PowerPoint PPT Presentation
launched in April 2013 It was designed after I received a number of - - PowerPoint PPT Presentation
The Stronghold was designed in 2009 and launched in April 2013 It was designed after I received a number of requests from large construction and glazing companies The companies needed to reduce their enormous scaffold bills and
SLIDE 2
SLIDE 3
SLIDE 4
- The Stronghold was designed in 2009 and
launched in April 2013
- The companies needed to reduce their
enormous scaffold bills and ‘Work at Height’
- It was designed after I received a number of
requests from large construction and glazing companies
- The Stronghold was designed to offer a simple
solution to their problems
SLIDE 5
SLIDE 6
SLIDE 7
SLIDE 8
SLIDE 9
SLIDE 10
SLIDE 11
SLIDE 12
SLIDE 13
Health and Safety
- No more ‘Work at Height’!
- No more ‘Falls from Height’!
- No more dropped tools or equipment !
SLIDE 14
Economical
- No more expensive and disruptive scaffold!
- Reduce job completion times
- Reduce sick days and injury claims
- Allows a company to provide more competitive
quotes and win more business
- Reduce transport costs and setup times for ‘in
house’ tower scaffold
SLIDE 15
SLIDE 16
- Total set weighs just over 25Kg
- Conforms to BS EN 795 B: 2012
- Tested to carry 1.9T
- Proudly made in Great Britain
- Minimal maintenance
- Easily stored and transported
- TS 16415: 2013
- ANSI Z359.1: 2007. AS/NZS 5532: 2013
SLIDE 17